echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > All over VOCs special help inspection in progress! What should companies do?

    All over VOCs special help inspection in progress! What should companies do?

    • Last Update: 2020-07-28
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    In recent years, China's air quality has been continuously improving but ozone pollution has become an important factor affecting summer air quality and volatile organic compounds () are important precursors to the formation of ozoneTake Guangdong as an example because of this year's high temperature Guangdong ozone pollution than the same period last year appeared earlier, moreAs of the end of the month, Guangdong province's city pollution days in the city is due to the ozone standard caused by the standardThe Minister of Ecological Environment from the month to the sun led a team to The Protection of ecological environment in Xuzhou, Jiangsu Province, Zhejiang Province, in Zibo, Binzhou and DongyingDuring the investigation, respectively, to Zhejiang Sany Equipment Co., LtdXuzhou Heavy Machinery Co., Ltdand furniture manufacturing enterprise cluster Shandong Qilu Petrochemical, Binzhou Boxing color plate enterprise cluster and Dongying Guangrao Petrochemical Enterprise Cluster to learn more about enterprise governanceHe pointed out that the current ozone generation in China is mainly a control-type benchmark enterprises in governance to do a good role model model high standards, strict requirements to keep a close eye on each link do not relax and effectively strengthen collection and treatment efforts to achieve source substitution, process closed, efficient disposalFrom the beginning of the month will focus on Beijing-Tianjin-Hebei and surrounding areas, the Wei Plain, The Suluyu junction area, the Yangtze River Delta region, the Yangtze River midstream city group and other areas in accordance with the problem precision, time accuracy, location accuracy, accurate object, precision of measures on volatile organic matter emissions, ozone pollution prevention and control pressure, environmental air quality improvement target progress in the city to carry out summer ozone pollution prevention and control guidance and help the relevant government, enterprises to implement the implementation of volatile organic emission reduction tasksOn the implementation of the relevant documents on governance, "Annual Volatile OrganicS Governance Plan (Draft for Comments)" issued on the month "on the request for "annual volatile organic compound governance plan (draft for comments)" letter" which clearly from the beginning of the month in accordance with the "double random, one open" model to carry out special law enforcement actions for enterprises that can not stabilize the emission standards, do not meet the requirements of non-organizational control to punish according to the law"On the situation in the epidemic prevention and control of the normal premise of active service implementation of the "six insurance" task resolutely win to fight the battle against pollution, " the Ministry of Ecological Environment issued on the month "on the epidemic prevention and control of the normal premise of active service to implement the "six insurance" task resolutely win a good battle against pollution prevention and control opinions (ring hall (the department) no) for the control clear many requirements pointed out: Strengthen summer and autumn (month-month) volatile organic matter (month) governance in heavily polluted areas to promote the construction of appropriate and efficient governance facilities to deal with inefficient governance facilities to carry out upgradingPriority should be given to the production and use of low-source auxiliary material souratingEnterprises that do not have low primary source substitution and do not adopt efficient governance facilities are encouraged to adopt wrong peak emission reduction measures in the summer and autumn, highlight the heavy pollution of the weather responseIn particular, it is predicted that the implementation of emergency emission reduction pilot projects for major emission processes when large-scale pollution processes may occur is implemented into specific production lines and equipmentGuangdong Province Ecological Environment Department issued the "Summer and autumn volatile organic compound seeking to meet the emission standards 100-day service action plan" listed the domestic emission tons of new key supervision enterprises list and emissions requirements before the end of the month to help the province's larger emissions of enterprises to complete the rectification work (the Pearl River Delta cities and other more prominent ozone pollution in the city to expand the scope of rectification to increase the scope of rectification can be the annual production of larger than tons of enterprises into the comprehensive rectification list) to the end of the end of the year By the end of the month to complete an industrial park, enterprise cluster rectification Shandong Province, the Ministry of Ecological Environment recently issued the "Shandong Province in the summer and autumn volatile organic matter strengthening management special action plan" clear this year to the province-wide petrochemical, organic chemical, industrial coating, packaging printing and gas stations (storage depots) as the focus areas of industrial parks, enterprise clusters and key enterprises focus on control objects to grasp the summer and autumn strengthening of governance to achieve a significant decline in emissions Shanxi Province Ecological Environment Department recently issued "on the development of volatile organic compounds () in key industries () special law enforcement inspection action notice" decided to start from the month to carry out a month of key industry volatile organic compounds () special law enforcement inspection action to further improve the accuracy of ozone control to promote the realization of summer ozone peak improvement of the proportion of good days co-reduction concentration First, the transmission pipe of the exhaust gas collection system does not have a negative pressure state or a positive pressure state when the leak detection value exceeds 2 The wind speed control wind speed of the unorganized emission position control at the far distance from the opening surface of the exhaust cover when the exhaust gas is collected using an external exhaust shield (the relevant industry specifications are specified in accordance with the relevant regulations) Third, for equipment and pipeline components leakage control if found that one of the following conditions is illegal in accordance with the relevant provisions of laws and regulations to deal with: the number of enterprise sealing points more than one (inclusive) but did not carry out leakage detection and repair work; Whether to carry out leak detection and repair work according to the prescribed frequency and time should be determined according to the ledger data 4 Products containing products and organic polymer products are not used in the process of use of closed equipment or in confined space seine, or have not taken local collection measures (except for products with less quality ratio) V The treatment facilities are not configured according to the provisions (the treatment facilities should be configured to handle the treatment efficiency when the initial emission rate of the collected exhaust gases in the key areas should not be lower; for the initial emission rate of the collected exhaust gases in the key areas should not be less than the treatment efficiency of the treatment facilities shall be lower than the original auxiliary materials used in accordance with the provisions of the relevant low-content products) VI, the height of the exhaust cylinder is lower (except for safety considerations or special process requirements) or the exhaust cylinder seis thighs should not be built according to the environmental impact assessment documents 7 The exhaust gas collection and treatment system is not running synchronously with the production process equipment (The production process equipment corresponding to the exhaust gas collection and treatment system shall be stopped and put into use synchronously after the maintenance is completed; the production process equipment shall not stop running or can not stop running in time shall set up the waste gas emergency treatment facility or take other alternative measures.) Eight, not set up as required to record the main operation and maintenance information of the exhaust gas collection system treatment facilities such as running time, exhaust gas treatment volume, operating temperature, time dwelling, adsorbent regeneration and replacement cycle and replacement amount, catalyst replacement cycle and replacement amount, absorption liquid value and other key operating parameters 9 Emissions of atmospheric pollutants exceeding the emission standards of atmospheric pollutants. Monitor ingestion above the ground outside the floor outside the doors and windows of the plant, vents, other openings (holes) and so on If the plant is incomplete (if there is no wall) in the operating station under the wind direction above the ground position for monitoring in accordance with the requirements of the monitoring specifications to measure the monitoring point of any hour average concentration value () or any one concentration value () beyond the limits specified in this standard to determine the excess The main points of industrial governance inspection are compiled and organized for reference by the key points of enterprise governance facilities inspection The overall situation of enterprise management facilities includes installation time, adsorbent filling and replacement frequency, consumables usage and integrity rate, continuous stable operation time, maintenance records and so on The removal rate of process facilities focuses on the removal rate of single process facilities such as photooxidation, photocatalytic, low temperature plasma, one-time activated carbon adsorption, spray absorption, biological method, etc , whether to set up waste gas emergency treatment facilities on the exhaust gas treatment system failure or maintenance production process equipment can not stop or can not stop in time to stop the operation of enterprises should set up waste gas emergency treatment facilities or take other alternative facilities Whether the non-organized emissions scientific planning and design exhaust gas collection system gives priority to the use of closed equipment, operation in confined space or the use of fully enclosed air shield and other collection methods to maximize the transformation of non-organized emissions into organized emissions to implement effective control to improve the emission collection rate to achieve "harvestable" The use of local air shield should reasonably select the collection point distance from the air cap opening surface at the far distance of the non-tissue emission position control wind speed is not less than meter seconds Focus on the inspection of oil and gas recovery, loading and unloading platforms, raw auxiliary materials and product storage transshipment, sewage treatment and other organized emission points, as well as feeding, production, transfer out of intermediate or final products and other unorganized emission points Whether the material storage, container, bag (1) container or bag is sealed and sealed when it is not in a non-access state, and whether the waste packaging container containing the material is sealed (2) Whether the container or bag is stored indoors or in a dedicated site with rain sheds, shade and impermeable facilities. The type of volatile organic liquid storage tank and the storage material real vapor pressure, volume, etc whether there are damage, holes, gaps and so on Whether the edge seal of the inner floating top tank is sealed in a immersion type, mechanical shoe shape and other high-efficiency sealing methods Whether the outer floating top tank is double sealed and sealed once is in-liquid type, mechanical shoe shape and other efficient sealing methods Whether the opening (hole) of the floating-top tank pontoon attachment opening is closed (except sampling, metering, routine inspection, maintenance and other normal activities) Whether the fixed top tank is equipped with a treatment facility or gas-phase balancing system The fixed pressure of the breathing valve meets the set requirements Whether the attachment opening (hole) of the fixed top tank is closed (except sampling, metering, routine inspection, maintenance and other normal activities). Whether the storage and silo enclosure structureis are complete and completely separate from the surrounding space Whether doors, windows and other openings (holes) are closed (except for persons, vehicles, equipment, materials entering and leaving and by law. Material transfer and transportation, whether liquid materials are piped and transported or in closed containers or tankers. Whether the powdered and granular materials are used in air conveying equipment, tubular conveyors, spiral conveyors and other closed transport methods or in airbags, containers or tankers. Whether the volatile organic liquid loading vehicle or train transport is loaded with a bottom or a top immersion Whether the exhaust gas is closed collection and treatment measures or connected to the gas phase balancing system according to the annual load and the real vapor pressure of the loading material; Whether the process is closed or local gas collection measures are closed or local gas collection measures are not organized emissions, material sputtering and unloading (1) liquid and powdered materials are closed or local gas collection measures taken; (2) Whether the discharge (out and discharge) process of materials is closed or local gas collection measures are taken; whether the exhaust gas is discharged to the exhaust gas collection and treatment system. The chemical reaction unit (1) reacts to whether the feed replacement exhaust gas, volatile exhaust, reaction exhaust gas, etc are discharged into the exhaust gas collection and treatment system (2) The opening (hole) of the input, outlet, mouth, mouth, mixing port, observation hole, etc of the reaction equipment is closed when not operating. Whether the separation of the refined unit centrifugal, filtration and drying process uses confined equipment or operates in confined spaces or takes local gas collection measures; Whether the exhaust gases emitted by other separation refining processes are discharged into the exhaust gas collection and treatment system Whether the master liquor after separation is closed and collected, and whether the exhaust gas produced by the mother air tank (tank) is discharged into the exhaust gas collection and treatment system. The vacuum system uses a dry vacuum pump whether the vacuum exhaust discharges to the exhaust gas collection and treatment system Whether the circulation tank (tank) of the working medium of the vacuum medium (tank) using the liquid ring (water ring) vacuum pump and water (water vapor) injection vacuum pump is closed to the vacuum exhaust, and whether the exhaust tank (tank) exhaust discharges to the exhaust gas collection and treatment system. The mixing, mixing, stirring, grinding, granulation, slicing, crushing processing process and the packaging process containing the product (filling, subassembly) process are used in confined equipment or operating in confined space or taking local gas collection measures; , the use of products in the process of mixing, coating, printing, bonding, printing and dyeing, drying, cleaning and other processes using content greater than or equal whether the use of closed equipment or in confined space operation or local gas collection measures; Whether the production process of organic polymers (synthetic resins, synthetic rubbers, synthetic fibers, etc.) is mixed, plasticized melting, processing molding (extrusion, injection, suppression, compression, foaming, spinning, etc.) whether the production process uses confined equipment or operates in confined spaces or local gas collection measures are taken; , other process containing materials and their pipes at the time of shutdown (car), inspection and repair and cleaning when the residual material is discharged and packed in a closed container during the discharge phase; Whether the non-tissue exhaust gas collection and treatment system runs in sync with the production process equipment The unorganized emission position at the far the far the far side of the open surface of the exhaust hood using an external air shield controls whether the wind speed is greater than or equal to the seconds of meters (as required by the industry is carried out in accordance with the corresponding regulations) Whether the exhaust gas collection system is operating under negative pressure and whether there is a leak in the positive pressure state Whether the pipeline of the exhaust gas collection system is closed and not broken Whether the number of seal points in the enterprise that leaks equipment and pipeline components is greater than or equal to whether the work is carried out Pumps, compressors, agitators, valves, flanges, etc are subject to leak detection at the prescribed frequency Discover whether the visible leakage phenomenon or whether the leakage source repair is carried out at the prescribed time if the leakage concentration exceeds the identified concentration of the leak On-site random spot checks in the detection of no more than one sealing point found that more than one (excluding) not during the repair period of the sealing point visible leakage phenomenon or more than the leakage identified concentration is illegal. Open liquid surface escape, waste water collection and transmission system whether the air pipe is transported by closed pipe, the use of ditches to transport unsealed waste water liquid surface above the detection concentration exceeds the standard requirements Whether access gates and outlets are isolated from the ambient air The above surface of the open liquid surface of the wastewater storage, treatment facility wastewater storage and treatment facilities is above the standard requirements Whether the exhaust gas with a fixed top cover is collected into the exhaust gas collection and treatment system Whether the open-cycle cooling water system detects or concentrates in the circulating cooling water flowing through the heat exchanger import stake and outlet on a monthly basis; Whether the emission concentration of the tissue discharge exhaust cylinder is stable or not The initial emission rate of exhaust gas collected by the workshop or production facility is greater than or equal to kilogram hours, and the efficiency of treatment in the key area is greater than or equal to kilogram hours is in accordance with the requirements; Whether or not to install automatic monitoring facilities to automatically monitor whether the normal operation of the facility is connected to the ecological environment department.  The exhaust gas treatment facility, cooler condenser outlet temperature is in accordance with the design requirements Whether the outlet temperature is higher than the inlet temperature of the cooling medium Condenser solvent recovery. The type of adsorbent of the adsorption device and the filling Single-use adsorbent replacement time and replacement amount Regeneration adsorbent regeneration cycle, replacement Waste adsorbent storage, disposal. The catalytic oxidizing (bed) temperature Electricity or natural gas consumption Catalyst replacement cycle, replacement conditions The combustion temperature of the hot oxidation furnace meets the design requirements The scrubber absorbs the acid alkaline control tower to check the washing absorption liquid value Pharmacy added cycle and add amount Washing absorbent replacement cycle and replacement amount The oxidizing reaction class absorption tower checks the value of the redox potential () value Whether the ledger enterprise records the ledger as required Establish and improve the original auxiliary material sings record the use of raw materials, accessories, waste amount, destination and content account preservation period of not less than one year.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.