echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Chemical Technology > Belgium opens its first trains powered by wind power

    Belgium opens its first trains powered by wind power

    • Last Update: 2022-11-19
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    A few days ago, according to a report by Belgian French-speaking national TV on the 25th, the country's first batch of trains with wind power as the main power was officially put into operation
    .

    According to Ann Bjerg, director of the traffic management division of the Belgian Railway Infrastructure Authority, the wind turbines that power the trains are located along the main railway road from the central Belgian city of Leuven to the eastern city of Liège, and the first batch of seven wind turbines to power these trains, which can provide kinetic energy for 170 trains operating in the region every day, accounting for 5% of
    all railway operations in Belgium.

    It is reported that Belgium plans to build a total of 25 new wind turbines for train kinetic energy, and the 7 wind turbines that have been put into operation have an annual power generation capacity of 35,000 MWh, of which the trains along the line will consume two-thirds of their power generation, and the remaining one-third will be used for other domestic public production and life
    .

    Philippe van Toyer, manager of production at the Belgian national electricity company, said that although wind energy is as intermittent as solar energy, it will play an increasingly important role
    in the future energy supply market.
    The importance of wind power is also becoming a growing consensus
    .

    A few days ago, according to a report by Belgian French-speaking national TV on the 25th, the country's first batch of trains with wind power as the main power was officially put into operation
    .

    Wind power

    According to Ann Bjerg, director of the traffic management division of the Belgian Railway Infrastructure Authority, the wind turbines that power the trains are located along the main railway road from the central Belgian city of Leuven to the eastern city of Liège, and the first batch of seven wind turbines to power these trains, which can provide kinetic energy for 170 trains operating in the region every day, accounting for 5% of
    all railway operations in Belgium.

    It is reported that Belgium plans to build a total of 25 new wind turbines for train kinetic energy, and the 7 wind turbines that have been put into operation have an annual power generation capacity of 35,000 MWh, of which the trains along the line will consume two-thirds of their power generation, and the remaining one-third will be used for other domestic public production and life
    .

    Philippe van Toyer, manager of production at the Belgian national electricity company, said that although wind energy is as intermittent as solar energy, it will play an increasingly important role
    in the future energy supply market.
    The importance of wind power is also becoming a growing consensus
    .

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.