echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Chemical environmental protection issues named by the Central Inspector: How will Shandong, Zhejiang, Jilin, and Sichuan rectify?

    Chemical environmental protection issues named by the Central Inspector: How will Shandong, Zhejiang, Jilin, and Sichuan rectify?

    • Last Update: 2021-07-07
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    "Global Coatings Network News"

    "Global Coatings Network News"

    The Central Environmental Protection Inspection Team organized environmental protection inspections in 8 provinces (regions) including Jilin, Zhejiang, Shandong, Hainan, Sichuan, Tibet, Qinghai, and Xinjiang (including the Production and Construction Corps) from August to September 2017, and in 2018 The inspector's feedback was completed in January of 2009.
    After the feedback, the party committees and governments of 8 provinces (regions) attached great importance to the inspection and reform work, and carefully studied and formulated the reform plan.

    The Central Environmental Protection Inspection Team organized environmental protection inspections in 8 provinces (regions) including Jilin, Zhejiang, Shandong, Hainan, Sichuan, Tibet, Qinghai, and Xinjiang (including the Production and Construction Corps) from August to September 2017, and in 2018 The inspector's feedback was completed in January of 2009.
    After the feedback, the party committees and governments of 8 provinces (regions) attached great importance to the inspection and reform work, and carefully studied and formulated the reform plan.




    8 provinces (regions) inspector rectification plans are based on the feedback from the central environmental protection inspection team to determine rectification tasks and goals.
    A total of 530 rectification tasks have been identified, including 67 in Jilin Province, 46 in Zhejiang Province, 59 in Shandong Province, and 56 in Hainan Province.
    There are 89 items in Sichuan Province, 45 items in Tibet Autonomous Region, 50 items in Qinghai Province, and 118 items in Xinjiang Uygur Autonomous Region (including Xinjiang Production and Construction Corps).


    The rectification measures mainly include:

    Implement the major decisions and deployments of the Party Central Committee and the State Council on ecological civilization construction and environmental protection; optimize space and industrial layout, adjust industrial and energy structures; fight pollution prevention and control battles, and focus on solving outstanding environmental problems in the atmosphere, water, soil, and rural areas; strengthen The management of nature reserves and illegal construction projects are cleaned up and exited; the reform of the ecological environment protection system is promoted.

    Implement the major decisions and deployments of the Party Central Committee and the State Council on ecological civilization construction and environmental protection; optimize space and industrial layout, adjust industrial and energy structures; fight pollution prevention and control battles, and focus on solving outstanding environmental problems in the atmosphere, water, soil, and rural areas; strengthen The management of nature reserves and illegal construction projects are cleaned up and exited; the reform of the ecological environment protection system is promoted.




    The rectification plan also clarifies the responsible unit, responsible person, rectification goals, rectification measures, and rectification time limit for each rectification task, and implements the implementation of billing, supervision of implementation, and closing of accounts.
    It is basically checkable, assessable, and questionable.
    responsibility.

    The rectification plan also clarifies the responsible unit, responsible person, rectification goals, rectification measures, and rectification time limit for each rectification task, and implements the implementation of billing, supervision of implementation, and closing of accounts.
    It is basically checkable, assessable, and questionable.
    responsibility.




    The rectification plans disclosed by the four major chemical provinces of Jilin, Zhejiang, Shandong, and Sichuan, involving the chemical industry, are as follows:

    The rectification plans disclosed by the four major chemical provinces of Jilin, Zhejiang, Shandong, and Sichuan, involving the chemical industry, are as follows:




    Shandong

    1.
    The "National Petrochemical and Chemical Industry "Twelfth Five-Year" Development Plan" requires hazardous chemical companies with greater environmental risks to enter the chemical park, but the Provincial Economic and Information Technology Commission has not made clear requirements for this in actual work.

    1.
    The "National Petrochemical and Chemical Industry "Twelfth Five-Year" Development Plan" requires hazardous chemical companies with greater environmental risks to enter the chemical park, but the Provincial Economic and Information Technology Commission has not made clear requirements for this in actual work.




    Time limit for rectification: before the end of 2025.

    Rectification goals: complete the "four ratings and one evaluation" of chemical production enterprises by the end of June 2018, and basically complete the park certification and determine the list of relocation and transformation enterprises by the end of September 2018; start small and medium-sized enterprises and large-scale enterprises with major risks and risks before the end of 2018 The relocation and renovation of enterprises will be completed by the end of 2020; the relocation and renovation of large enterprises and super-large enterprises will be initiated by the end of 2020, and will be completed by the end of 2025.
    Outside the chemical park, it is strictly forbidden to build or expand chemical production projects.

    Rectification goals: complete the "four ratings and one evaluation" of chemical production enterprises by the end of June 2018, and basically complete the park certification and determine the list of relocation and transformation enterprises by the end of September 2018; start small and medium-sized enterprises and large-scale enterprises with major risks and risks before the end of 2018 The relocation and renovation of enterprises will be completed by the end of 2020; the relocation and renovation of large enterprises and super-large enterprises will be initiated by the end of 2020, and will be completed by the end of 2025.
    Outside the chemical park, it is strictly forbidden to build or expand chemical production projects.




    Corrective measures:

    (1) Actively carry out rating evaluations, forcing enterprises to relocate and reform or shut down and transfer.
    Organize a new round of "Four Ratings and One Evaluation" special actions for chemical production enterprises in Shandong Province, highlighting the four compulsions of safety, environmental protection, energy conservation, and quality, and comprehensive evaluation of transformation and upgrading, which will be completed by the end of June 2018.
    Strengthen the use of rating evaluation results, and list those that are rated as "poor" or "poor" for safety, environmental protection and "poor" in the rating evaluation, and have major hidden dangers, and relocate and renovate within a time limit or shut down for conversion, and determine all relocation and renovation by the end of September 2018 List of companies.
    In accordance with the requirements of "one enterprise, one policy", and according to the different situations of enterprises, formulate specific relocation and transformation plans to ensure that small and medium-sized enterprises and large enterprises with major risks and hidden dangers will start relocation and transformation before the end of 2018 and be completed by the end of 2020; other large enterprises and super large enterprises The enterprise will start the relocation and renovation before the end of 2020, and complete the shutdown or relocation before the end of 2025.

    (1) Actively carry out rating evaluations, forcing enterprises to relocate and reform or shut down and transfer.
    Organize a new round of "Four Ratings and One Evaluation" special actions for chemical production enterprises in Shandong Province, highlighting the four compulsions of safety, environmental protection, energy conservation, and quality, and comprehensive evaluation of transformation and upgrading, which will be completed by the end of June 2018.
    Strengthen the use of rating evaluation results, and list those that are rated as "poor" or "poor" for safety, environmental protection and "poor" in the rating evaluation, and have major hidden dangers, and relocate and renovate within a time limit or shut down for conversion, and determine all relocation and renovation by the end of September 2018 List of companies.
    In accordance with the requirements of "one enterprise, one policy", and according to the different situations of enterprises, formulate specific relocation and transformation plans to ensure that small and medium-sized enterprises and large enterprises with major risks and hidden dangers will start relocation and transformation before the end of 2018 and be completed by the end of 2020; other large enterprises and super large enterprises The enterprise will start the relocation and renovation before the end of 2020, and complete the shutdown or relocation before the end of 2025.




    (2) Organize the implementation of chemical park certification, and actively guide enterprises to enter the park.
    In accordance with the "Administrative Measures for the Recognition of Chemical Industry Parks in Shandong Province" and the scoring standards for chemical parks, the 199 existing chemical parks in the province were re-certified in an overall consideration of the regional environmental capacity; the "Administrative Measures for the Recognition of Specialized Chemical Parks in Shandong Province" and "Key Monitoring" were formulated.
    Management Measures for Point Certification" to further standardize the management of professional chemical parks and improve the intrinsic safety of parks and enterprises.
    Comprehensively consider whether each park can meet the relevant requirements such as the ecological protection red line, the bottom line of environmental quality, the resource utilization line and the negative list of environmental access, the marine ecological red line of the Bohai Sea and the Yellow Sea in Shandong Province, and the province's chemical industry development master plan, as well as the provincial and municipal industrial planning layout.
    , Determine the chemical parks, specialized parks and key monitoring points, submit them to the provincial government for research and re-announce them, and basically complete the identification of the chemical parks by the end of September 2018.
    In addition to the national petroleum and chemical industry planning and layout plan, the national "13th Five-Year" petroleum and chemical industry development plan, the provincial new and old kinetic energy conversion major project, the provincial high-end petrochemical industry development plan, the provincial high-end chemical industry development plan and other provincial key projects , And large-scale metallurgical project site gas production, smelting tail gas production of sulfuric acid (sulfur), waste production of organic fertilizer, bromine, etc.
    are not suitable for entering the park.
    Newly established hazardous chemical companies must enter the park.
    It is strictly forbidden to enter the park.
    Implement new and expanded chemical projects outside of specialized chemical parks and key monitoring points.

    (2) Organize the implementation of chemical park certification, and actively guide enterprises to enter the park.
    In accordance with the "Administrative Measures for the Recognition of Chemical Industry Parks in Shandong Province" and the scoring standards for chemical parks, the 199 existing chemical parks in the province were re-certified in an overall consideration of the regional environmental capacity; the "Administrative Measures for the Recognition of Specialized Chemical Parks in Shandong Province" and "Key Monitoring" were formulated.
    Management Measures for Point Certification" to further standardize the management of professional chemical parks and improve the intrinsic safety of parks and enterprises.
    Comprehensively consider whether each park can meet the relevant requirements such as the ecological protection red line, the bottom line of environmental quality, the resource utilization line and the negative list of environmental access, the marine ecological red line of the Bohai Sea and the Yellow Sea in Shandong Province, and the province's chemical industry development master plan, as well as the provincial and municipal industrial planning layout.
    , Determine the chemical parks, specialized parks and key monitoring points, submit them to the provincial government for research and re-announce them, and basically complete the identification of the chemical parks by the end of September 2018.
    In addition to the national petroleum and chemical industry planning and layout plan, the national "13th Five-Year" petroleum and chemical industry development plan, the provincial new and old kinetic energy conversion major project, the provincial high-end petrochemical industry development plan, the provincial high-end chemical industry development plan and other provincial key projects , And large-scale metallurgical project site gas production, smelting tail gas production of sulfuric acid (sulfur), waste production of organic fertilizer, bromine, etc.
    are not suitable for entering the park.
    Newly established hazardous chemical companies must enter the park.
    It is strictly forbidden to enter the park.
    Implement new and expanded chemical projects outside of specialized chemical parks and key monitoring points.




    (3) Strictly implement national policies and vigorously promote the relocation and transformation of hazardous chemicals enterprises.
    Accelerate the implementation of the "13th Five-Year Plan for Safety in Production in Shandong Province" in accordance with the national requirements for promoting the relocation and transformation of hazardous chemical production enterprises in densely populated urban areas, actively carry out special actions for the transformation and upgrading of safe production in the chemical industry, and promote the relocation of hazardous chemical enterprises Renovation and acceleration of industrial upgrading are important tasks to promote the coordinated development of new urbanization and industrialization.
    Hazardous chemicals companies enter the specialized chemical park in principle, and those not in the park should be gradually shut down and eliminated.
    Formulate the “Implementation Plan for the Relocation and Reconstruction of Hazardous Chemicals Production Enterprises in the Urban and Population-Dense Areas of Shandong Province”, and steadily promote the investigation and evaluation of enterprises, the identification of chemical parks, the preparation of relocation implementation plans, and the formulation of safeguard policies.

    (3) Strictly implement national policies and vigorously promote the relocation and transformation of hazardous chemicals enterprises.
    Accelerate the implementation of the "13th Five-Year Plan for Safety in Production in Shandong Province" in accordance with the national requirements for promoting the relocation and transformation of hazardous chemical production enterprises in densely populated urban areas, actively carry out special actions for the transformation and upgrading of safe production in the chemical industry, and promote the relocation of hazardous chemical enterprises Renovation and acceleration of industrial upgrading are important tasks to promote the coordinated development of new urbanization and industrialization.
    Hazardous chemicals companies enter the specialized chemical park in principle, and those not in the park should be gradually shut down and eliminated.
    Formulate the “Implementation Plan for the Relocation and Reconstruction of Hazardous Chemicals Production Enterprises in the Urban and Population-Dense Areas of Shandong Province”, and steadily promote the investigation and evaluation of enterprises, the identification of chemical parks, the preparation of relocation implementation plans, and the formulation of safeguard policies.




    2.
    Some departments and localities have left their minds to illegal construction.
    The entry rate of chemical enterprises in the province is only about 20%, and a large number of chemical projects have been constructed illegally.
    Among the 8124 chemical companies in production in the province, 3389 have no project approval procedures, 5146 have no planning permission procedures, 3259 have no land procedures, and 1183 have no environmental assessment procedures.

    2.
    Some departments and localities have left their minds to illegal construction.
    The entry rate of chemical enterprises in the province is only about 20%, and a large number of chemical projects have been constructed illegally.
    Among the 8124 chemical companies in production in the province, 3389 have no project approval procedures, 5146 have no planning permission procedures, 3259 have no land procedures, and 1183 have no environmental assessment procedures.




    Time limit for rectification: Establish and reform, and persist for a long time.

    Rectification goals: All illegal construction projects will immediately stop production for rectification.
    Promote the entry of chemical companies into the zone, and strive to reach 30% by 2020 and 40% by 2022 on the basis of the current rate of 20%.

    Rectification goals: All illegal construction projects will immediately stop production for rectification.
    Promote the entry of chemical companies into the zone, and strive to reach 30% by 2020 and 40% by 2022 on the basis of the current rate of 20%.




    Corrective measures:

    (1) Strengthen special rectification and deal with illegal projects in accordance with the law.
    Before the end of March 2018, a classified rectification plan was developed in accordance with the "one enterprise, one policy", the shutdown of the shutdown, the shutdown of the production for rectification, and the norms to avoid "one size fits all".
    Implement "zero tolerance" for newly discovered violations.
    Incorporate the rectification of illegal projects into the scope of supervision of "double random, one open", and deal with it in strict accordance with relevant laws and regulations to ensure that rectification is in place.

    (1) Strengthen special rectification and deal with illegal projects in accordance with the law.
    Before the end of March 2018, a classified rectification plan was developed in accordance with the "one enterprise, one policy", the shutdown of the shutdown, the shutdown of the production for rectification, and the norms to avoid "one size fits all".
    Implement "zero tolerance" for newly discovered violations.
    Incorporate the rectification of illegal projects into the scope of supervision of "double random, one open", and deal with it in strict accordance with relevant laws and regulations to ensure that rectification is in place.




    (2) Promote entry into the park and strengthen park management.
    Optimize the layout of chemical parks, increase the rate of chemical companies entering the parks, and achieve intensive development, and strive to reach 30% by 2020 and 40% by 2022.

    (2) Promote entry into the park and strengthen park management.
    Optimize the layout of chemical parks, increase the rate of chemical companies entering the parks, and achieve intensive development, and strive to reach 30% by 2020 and 40% by 2022.




    (3) Strengthen project management and strict project approval.
    The approval or filing authority for new construction, reconstruction, and expansion of chemical projects shall be submitted to the municipal investment authority of the districted city.
    Except for the innovation transformation projects and relocation projects where the product fills the domestic gap or the process technology reaches the domestic leading level, in principle, no new construction or expansion with a fixed asset investment of less than 300 million yuan (excluding land costs) will be approved or recorded Hazardous chemicals project.
    Comprehensively strengthen the management of the approval and construction of chemical projects.
    The safety, environmental protection, energy saving, and water-saving facilities of new, rebuilt, and expanded chemical projects must be designed, constructed, and put into use at the same time as the main project; projects that have been approved or filed must be designed, constructed, and put into use at the same time.
    Construction can only start after passing the safety assessment, environmental review approval, planning water resources demonstration, and energy conservation assessment; after the completion of the project, no pollution permit has been obtained, and safety, water intake projects, fire-fighting facilities, etc.
    that have not passed the acceptance test shall not be put into production and use .

    (3) Strengthen project management and strict project approval.
    The approval or filing authority for new construction, reconstruction, and expansion of chemical projects shall be submitted to the municipal investment authority of the districted city.
    Except for the innovation transformation projects and relocation projects where the product fills the domestic gap or the process technology reaches the domestic leading level, in principle, no new construction or expansion with a fixed asset investment of less than 300 million yuan (excluding land costs) will be approved or recorded Hazardous chemicals project.
    Comprehensively strengthen the management of the approval and construction of chemical projects.
    The safety, environmental protection, energy saving, and water-saving facilities of new, rebuilt, and expanded chemical projects must be designed, constructed, and put into use at the same time as the main project; projects that have been approved or filed must be designed, constructed, and put into use at the same time.
    Construction can only start after passing the safety assessment, environmental review approval, planning water resources demonstration, and energy conservation assessment; after the completion of the project, no pollution permit has been obtained, and safety, water intake projects, fire-fighting facilities, etc.
    that have not passed the acceptance test shall not be put into production and use .




    3.
    Some places violated regulations to promote the construction of chemical enterprises.

    3.
    Some places violated regulations to promote the construction of chemical enterprises.




    Time limit for rectification: Establish and reform, and stick to it for a long time.

    Rectification goals: stop illegal activities immediately, carry out rectification in accordance with laws and regulations, and resolutely ban the illegal construction chemical enterprises that fail to rectify within a time limit.

    Corrective measures:

    Corrective measures:




    (1) Immediately stop production for rectification of chemical companies that have no formalities for project approval, planning, land, and environmental assessment.
    In conjunction with the identification of chemical parks, the province will carry out investigations of existing chemical parks, deal with the problems of new chemical projects that break through the scope of the overall urban planning, and deal with the problems of new chemical projects in accordance with laws and regulations, and take accountability seriously for the units and responsible persons who violate the regulations to promote the construction of chemical enterprises.

    (1) Immediately stop production for rectification of chemical companies that have no formalities for project approval, planning, land, and environmental assessment.
    In conjunction with the identification of chemical parks, the province will carry out investigations of existing chemical parks, deal with the problems of new chemical projects that break through the scope of the overall urban planning, and deal with the problems of new chemical projects in accordance with laws and regulations, and take accountability seriously for the units and responsible persons who violate the regulations to promote the construction of chemical enterprises.




    (2) Promote entry into the park and strengthen park management.
    Overall consideration of regional environmental capacity, optimizing the layout of chemical parks, increasing the rate of chemical companies entering the park, and realizing intensive development, strive to reach 30% by 2020 and 40% by 2022.
    Strengthen the management of enterprises entering the park, and new and expanded projects must enter the chemical parks, specialized chemical parks and key monitoring points announced by the provincial government.

    (2) Promote entry into the park and strengthen park management.
    Overall consideration of regional environmental capacity, optimizing the layout of chemical parks, increasing the rate of chemical companies entering the park, and realizing intensive development, strive to reach 30% by 2020 and 40% by 2022.
    Strengthen the management of enterprises entering the park, and new and expanded projects must enter the chemical parks, specialized chemical parks and key monitoring points announced by the provincial government.




    (),。、、,;,3()、。,、、、、、,、、;,、、;,,、、,。

    (),。、、,;,3()、。,、、、、、,、、;,、、;,,、、,。




    、2013,、、,20、378。

    、2013,、、,20、378。




    ()

    () :2018。

    :,,,。

    :,,,。





    1.
    ,,。20183,。。,,、。

    1.
    ,,。20183,。。,,、。




    2.
    《(2016-2030)》。,,。,,、。

    2.
    《(2016-2030)》。,,。,,、。




    ()
    :20183。

    :37,。

    :37,。




    :20183,,;“”,,、、,。

    :20183,,;“”,,、、,。




    ()

    :,620181。

    :,620181。




    :2、,6。

    :2、,6。




    :3,。2(、S-),,;。3,。

    :3,。2(、S-),,;。3,。




    (),。,,。《》,,(、)(、、、),、、、。,。20189,。,《》,、。

    (),。,,。《》,,(、)(、、、),、、、。,。20189,。,《》,、。




    、20165,,,201611,。

    、20165,,,201611,。




    :,。

    :,。




    :。

    :。




    :2017,、,。20183,。

    :2017,、,。20183,。




    、,、、,,,。

    、,、、,,,。




    :,。

    :,。




    :、、,,,“”,。

    :、、,,,“”,。





    ()。《》(201644),“”,。

    ()。《》(201644),“”,。




    ()。、、、,。,。,,,。

    ()。、、、,。,。,,,。




    ()。,、、、,2020,3000。“”,、、、4。

    ()。,、、、,2020,3000。“”,、、、4。




    ()。、,,,,。“”,“”,。,,;,。

    ()。、,,,,。“”,“”,。,,;,。




    、。1112.
    48,。,。201611,,。20173

    :20182。

    :20182。




    :,,。

    :,,。





    1.
    。201712,,;。

    1.
    。201712,,;。




    2.
    。2017828,;20179,,,。

    2.
    。2017828,;20179,,,。




    3.
    。20182,,,,。

    3.
    。20182,,,,。




    4.
    。,、、;,,。

    4.
    。,、、;,,。




    、,,、,,

    、,,、,,




    :,。

    :,。




    :,,“”,,。

    :,,“”,,。





    1.
    。,(、、、),,。、、(“”),“、、”(“”)。,。

    1.
    。,(、、、),,。、、(“”),“、、”(“”)。,。




    2.
    。()、、、、、6。《(2017—2020)》,、、,“”。,、、,。

    2.
    。()、、、、、6。《(2017—2020)》,、、,“”。,、、,。




    3.
    “”。“”“”(),,、,,。2018,1000,“”“”()10000,1000,150,。

    3.
    “”。“”“”(),,、,,。2018,1000,“”“”()10000,1000,150,。




    4.
    。,201812、、,。“、、”,。

    4.
    。,201812、、,。“、、”,。





    、53,25,800,200。,、。

    、53,25,800,200。,、。




    :,。

    :,。




    :201812

    ()20183,,、,。

    ()20183,,、,。




    (),。。,,,。、。20186,、、。

    (),。。,,,。、。20186,、、。




    ()201812,,,,,,。

    ()201812,,,,,,。




    (),、,,、、。

    (),、,,、、。




    、77,,。

    、77,,。




    :20186,《》。

    :20186,《》。




    202512,,。

    202512,,。




    :202512




    ()

    1.
    《》,。,,。

    1.
    《》,。,,。




    2.
    。、、、、、、、、。201812,。

    2.
    。、、、、、、、、。201812,。




    3.
    “”,,、、,。202012,202512。

    3.
    “”,,、、,。202012,202512。




    ()

    1.
    《》,,。,,。

    1.
    《》,,。,,。




    2.
    ()。、、、、、、、、。201812,()。

    2.
    ()。、、、、、、、、。201812,()。




    3.
    ()。,、、,()。,。,,、,,。

    3.
    ()。,、、,()。,。,,、,,。




    ()

    1.
    20185,,,,,、、,。

    1.
    20185,,,,,、、,。




    2.
    《()》,13,,2018,20201231。

    2.
    《()》,13,,2018,20201231。




    3.
    28,。2018,20201231。

    3.
    28,。2018,20201231。





    、,112000,、,。50/80/。

    、,112000,、,。50/80/。




    :201812

    :,“”,100%;“”,。

    :,“”,100%;“”,。





    1.
    ,(),,、。201812,“”,。

    1.
    ,(),,、。201812,“”,。




    2.
    ,8。“”,2018123。

    2.
    ,8。“”,2018123。




    3.
    20186。

    3.
    20186。




    、4/,。

    、4/,。




    :201812

    :,,(),。

    :,,(),。





    1.
    20182。

    1.
    20182。




    2.
    20186,、,。

    2.
    20186,、,。




    3.
    201812,。

    3.
    201812,。




    、46%,42%,。

    、46%,42%,。




    :,

    :,,。

    :,,。





    1.
    《》《》《(2016—2020)》,,,,。

    1.
    《》《》《(2016—2020)》,,,,。




    2.
    ,,,1,,。、;,;。

    2.
    ,,,1,,。、;,;。




    3.
    “”,;,,;,、、。

    3.
    “”,;,,;,、、。




    4.
    。,;,,,《》4,。

    4.
    。,;,,,《》4,。




    、。

    、。




    :202512

    :。

    :。





    1.
    201712《》。

    1.
    201712《》。




    2.
    20181,。

    2.
    20181,。




    3.
    20183,(),、、。

    3.
    20183,(),、、。




    4.
    、()。,201812,202012;202012,202512。

    4.
    、()。,201812,202012;202012,202512。




    、、,、、13,、。

    、、,、、13,、。




    :201812,

    :。

    :。





    1.
    ,20186,,,;,。

    2.
    20188,。

    2.
    20188,。




    3.
    ,201812,“”,;,,。

    3.
    ,201812,“”,;,,。




    4.
    。、;,;,。

    4.
    。、;,;,。




    、。

    、。




    :202212

    :。

    :。





    1.
    《(2017—2022)》,。

    1.
    《(2017—2022)》,。




    2.
    20188,201812,201912。、、、、、66201912,202012。、、、、5()6202212。

    2.
    20188,201812,201912。、、、、、66201912,202012。、、、、5()6202212。




    3.
    ,201812;201912、。

    4.
    、、,。,、、、,,。

    4.
    、、,。,、、、,,。




    5.
    ,202012202212

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.
    Related Articles

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent Echemi's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.