echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Coating standard: Shanghai housing decoration acceptance standard 2 (2004 version 315 standard)

    Coating standard: Shanghai housing decoration acceptance standard 2 (2004 version 315 standard)

    • Last Update: 2020-04-03
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    Core tips: 9 Doors and windows 9.1 aluminum alloy doors and windows 9.1.1 basic requirements The specifications, opening direction and installation position of doors and windows shall meet the design requirements Doors and windows must be installed firmly, horizontally and vertically The gap between the door and window frame and the wall shall be filled with elastic material and sealed with sealant, which shall be firmly bonded The doors and windows shall be opened and closed flexibly without overturning Sliding doors and windows must be provided with anti falling measures The door and window accessories shall be complete and installed It shall be firm, with correct position The surface of doors and windows shall be clean, and the large surface shall be free of scratches and bumps The external doors and windows shall be free of rainwater leakage Self made Paint agent, top 10 Chinese wall paint brands Recommended introduction: interior wall paint and exterior wall paint can achieve beautiful, clean and pleasant effects, but the effects in different environments are different, so the color of the paint will be different There are ten brands of Chinese paint, ten brands of global paint, ten brands of Chinese wall paint, and ten brands of Chinese paint, Famous trademark of Chinese paint and coating In private rooms, most of us choose according to our own personality, personal hobbies and living habits The younger generation will choose the interior wall paint with rich colors and bright colors, while the older ones will have some working experience Paint Home News: 9 Doors and windows 9.1 aluminum alloy doors and windows 9.1.1 basic requirements: the variety, specification, opening direction and installation position of doors and windows shall meet the design requirements Doors and windows must be installed firmly, horizontally and vertically The gap between the door and window frame and the wall shall be filled with elastic material and sealed with sealant, which shall be firmly bonded The doors and windows shall be opened and closed flexibly without overturning Sliding doors and windows must be provided with anti falling measures The door and window accessories shall be complete, installed firmly, and located correctly The surface of the door and window shall be clean, and the large surface shall be free of scratches and bruises The external doors and windows shall be free of rainwater leakage The self-made aluminum alloy doors and windows shall meet the requirements of GB / t8478 and GB / t8479 The wall thickness specification of the aluminum alloy door profile shall not be less than 2.0mm, and the wall thickness specification of the window profile shall not be less than 1.4mm 9.1.2 acceptance requirements and methods acceptance requirements and methods for installation quality of aluminum alloy doors and windows shall be carried out in accordance with table 11 9.2 PVC plastic doors and windows 9.2.1 basic requirements the specifications, opening direction and installation position of doors and windows shall meet the design requirements Doors and windows must be installed firmly, horizontally and vertically The gap between the door and window frame and the wall shall be filled with elastic material Sealant shall be used for sealing, and the sealant shall be firmly bonded The doors and windows shall be opened and closed flexibly without overturning Sliding doors and windows must be provided with anti falling measures The door and window accessories shall be complete, installed firmly, positioned correctly, and the function shall meet the use requirements The surface of plastic doors and windows shall be clean, flat and smooth, and the surface of people shall be free of scratches and bruises The external doors and windows shall be free of rainwater leakage PVC plastic doors and windows made by ourselves shall meet the requirements of JC / t3017 and JG / t3018 When the length of door and window components exceeds the specified size, the inner cavity must be lined with reinforced steel, and the wall thickness of the reinforced steel shall not be less than 1.2mm 9.2.2 acceptance requirements and methods the installation quality acceptance requirements and methods of plastic doors and windows shall be in accordance with table 12 9.3 wooden doors and windows 9.3.1 basic requirements 9.3.1.2 the surface shall be smooth and free of gouging, burr or hammer mark, degumming and moth eaten 9.3.1.3 the door and window accessories shall be complete, correctly positioned and firmly installed 9.3.2 acceptance requirements and methods the installation acceptance requirements and methods of wooden doors and windows shall be in accordance with table 13 10 Basic requirements for ceiling and partition 10.1 the installation of ceiling and partition shall be firm, the surface shall be flat, and free from defects such as pollution, fracture, edge missing, angle dropping, hammer mark, etc The bonded veneer shall be pasted firmly without delamination The used decorative panel shall be free of leakage, penetration, angle warping, etc The ceiling and separation position shall be correct, all connecting parts must be tightened and clamped firmly, the main keel shall not be bent obviously, and the connection of the secondary keel shall not be misplaced obviously When the wooden ceiling is adopted, the wooden keel shall be subject to fire prevention treatment, the embedded parts and steel suspenders in the ceiling shall be subject to anti-corrosion and anti rust treatment, and the position where the lamps and lanterns are embedded shall be subject to reinforcement treatment The vertical fixed suspender of the ceiling shall not be fixed by wooden tenon The ceiling shall be connected by screws, and the nail cap shall be rust proof 10.2 acceptance requirements and methods installation acceptance requirements and methods of ceiling and partition shall be in accordance with table 14 11 Flower decoration 11.1 basic requirements: the surface of flower decoration shall be clean, the pattern shall be clear, the joint shall be tight, and there shall be no cracks, twists, missing edges and corners, and the installation of flower decoration shall be firm 11.2 the acceptance requirements and methods for decoration installation shall be in accordance with table 15 Table 15 installation and acceptance requirements and methods of decoration 12 Basic requirements of painting 12.1: painting or spraying shall be uniform, without powder falling, missing coating, exposed bottom, sagging, obvious brushing pattern, and no blistering, peeling, speckle and other phenomena on the surface 12.2 acceptance requirements and methods 12.2.1.3 the quality acceptance requirements and methods of water emulsion coating shall be in accordance with table 18 13 Paste 13.1 basic requirements: the paste of wallpaper (cloth) shall be firmly pasted, the surface shall be clean and flat, the color shall be consistent, and there shall be no ripple, bubble, crack, wrinkle, stain and warpage, the pattern and pattern at the joint shall be consistent, without leaving the joint, overlapping or joint 13.2 acceptance requirements and methods the acceptance requirements and methods of wallpaper (cloth) shall be in accordance with table 19 14 The appearance of sanitary ware is clean and intact Sanitary ware shall be installed firmly without looseness Expansion bolts should not be used to fix sanitary wares in porous bricks or light walls The water supply connecting pipe of sanitary ware shall be free of defects such as concave convex bending and flattening Drainage and overflow shall be smooth without blocking, all connections shall be sealed without leakage, and valves shall be opened and closed flexibly Sanitary ware shall be tightly connected with water inlet pipe and drain outlet without leakage The pedestal pan shall be fixed and installed with expansion bolts and sealed with oil lime or silicone glue The base shall not be fixed with cement mortar The bathtub drainage must be connected by hard pipes (except the original pipes), and there should be no leakage 14.1.2 the power supply of the Jacuzzi must be connected with a socket It is strictly prohibited to directly connect the power supply The motor test machine must be drained before starting, and there should be no leakage at the connection 14.1.3 the base of the shower room shall be filled, and the base shall be installed flat without ponding The drain pipe shall be connected with hard pipe The glass of the shower room shall be safety glass, and the joint between the shower room and the wall shall be free of leakage 14.1.4 after installation, the water filling test shall be carried out for 2h without leakage The water capacity is as follows: the high and low water tanks of the toilet shall be filled to 10 mm below the wrench hole; various basins and sinks shall be filled to the overflow port; the bathtub shall be filled to one third of the depth of the tank; the overflow port of the bathtub shall be filled with water test; the water pan shall be filled to two thirds of the depth of the pan 14.2 acceptance requirements and methods acceptance requirements and methods for installation of sanitary equipment shall be in accordance with table 20 15 Indoor air quality 15.1 indoor air quality acceptance shall be carried out 7 days after the completion of decoration or before delivery for use 15.2 the test method of indoor environmental pollutant concentration shall be in accordance with GB50325, and the test results shall meet the requirements of table 21 16 Quality acceptance and judgment 16.1 acceptance procedures pipeline, electrical and other concealed items shall be signed and accepted by both parties before being transferred to the next process After the completion of decoration, the construction party shall first check by itself, and if it meets the requirements, it can be delivered to the owner for acceptance 16.2 quality judgment 16.2.1 class A: items involving personal health and safety; class B: items affecting use and decoration effect; class C: items slightly affecting decoration effect 16.2.2 when the test result of class C items is greater than 1.5 times of the allowable deviation, it shall be treated as class B non conformance 16.2.3 class A and class B projects are not allowed to have non conformances; the total number of non conformances of class C projects in the overall project shall not exceed 12, and the judgment conclusion is shown in table 22 16.2.4 if it is found that the project does not meet the acceptance requirements during the acceptance, the construction party shall make rectification, and then re inspect the rectification project until it meets the requirements 16.2.5 see Appendix A for decoration quality acceptance record 17 The warranty period of decoration quality shall be in accordance with the relevant regulations of this Municipality The construction party shall repair the decoration quality problems not caused by improper use within the warranty period since the date of delivery and use Home of coatings is specialized in coatings, diatom mud, paint coating, coating technology, fire retardant coating news and coating, diatom mud, paint coating, coating technology, fire retardant coating decoration knowledge and decoration renderings,
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.