Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Paint Online News Information: Why can
the real stone paint do a good job after not achieving their ideal results? The main reasons are two points: product and construction. So what are the problems that tend to arise in construction? The following by the Chinese
experts for you to briefly introduce a few external wall real stone paint construction common problems and solutions.
common problems and solutions to the construction of real stone paint on the outerFirst, uneven coloring
the main reasons: coloring with inaccurate grasp, mixed paint can not spread evenly, the thickness of the coating caused by uneven.
solution: re-do the secondary product uniform adjustment, until the coating on the finish has a certain texture.2, paint surface cracking and empty drum phenomenon
the main reasons: coloring with the master is not correct, mixed paint can not be on time and evenly spread up, the thickness of the coating is not average caused.
solution: re-do the secondary product adjustment of real stone paint, until the paint on the finish has a certain texture.3, a large number of uneven pattern phenomenon
the main reasons: large area of cement mortar, resulting in slow drying time, which will produce cracking and empty drum phenomenon;
solution: to carry out the average division treatment, in the base house dusting process, the mortar evenly matched.
common problems and solutions to the construction of real stone paint on the outerFourth, the surface layer of the joint
main reasons: excessive spraying product, resulting in the paint surface is too thick.
solution: timely according to the scale of exchange for cement mortar surface acceptance, if not closed can not be completed as scheduled., the existence of cross-contamination serious
the main reason: the surface layer in the construction process did not notice the distribution on the sub-section, resulting in the appearance of unrrouted.
Solution: In the construction process must comply with every construction step to complete, try to avoid cross-contamination damage, at the same time, we can choose with anti-aging, anti-high temperature and anti-strong exposure to auxiliary coatings to fill, but also to ensure the reduction of cross-contamination.
。