echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > Correct installation and operation steps of pelletizer

    Correct installation and operation steps of pelletizer

    • Last Update: 2019-01-09
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    The pill making machine is a new generation of pill making equipment developed by the factory for the production of different pills such as Xiaomi pills, water pills and concentrated pills The machine has stable performance and convenient operation, cleaning and maintenance The other parts in contact with the drug are made of stainless steel materials, which meet the requirements of GMP standards When producing pills with different specifications and sizes, it is enough to change the size of the strip nozzle and match the pill making knife with different specifications and sizes The device has power control, simple operation and convenient movement Ensure the necessary pressure for pelleting; press the cake, rub the strip and rub the pill with one machine, and the pelleting rate is up to 95%; the precision alloy steel toothed roller meets the sanitary conditions, and its reverse grinding technology ensures the smooth pelleting Next, I would like to share the disassembly and installation methods and instructions for use of the equipment: 1 After the ball making knife is tightened with a special back off nut and the knife, and then the top thread of the back off nut is screwed, the ball making knife can be withdrawn 2 Loading and unloading method and direction of spring: remove the shot making knife, clamp the knife shaft with a carrier, and turn the connecting thread on the right knife shaft to the right when looking at the front, and turn the left thread to the left After removing the bolts on the flange seat of the cutter shaft, screw off the cutter shaft, and then hold the cutter shaft to pull forward The flange seat, the cutter shaft of the gear body and the spring can be pulled out once, and the direction of the flange seat and the gear body can be replaced by the spring (left-hand spring, right-hand spring) 3 Disassembly method and installation direction of guide key: after removing the flange seat, compress the spring to move the gear forward for 10 mm, and take out the guide key Do not exit with the gear body to avoid the guide key stuck in the undercut of the square groove of the cutter shaft Instructions for use 1 This machine is suitable for indoor environment temperature of - 5 ℃ to + 40 ℃, relative humidity less than 90%, voltage amplitude fluctuation of power grid less than 10% of rated value, no conductive dust and corrosive metal gas around It can be installed in the plant with sufficient sunlight and clean, without foundation, and it can be leveled For safety, it must be grounded 2 Before start-up, check whether the oil level of gearbox reaches the standard position; check whether the oil cup on the hopper is filled with edible oil; check whether the pelletizer is aligned and tightened; check whether the liquor cleaning system is smooth and adjust appropriate amount Use alcohol to disinfect guide wheel, guide frame, pill making knife, etc Turn on electric heating 3 The striping part shall be idled for 3-5 minutes If there is no abnormality, the material can be fed and the striping can be pushed out Return to a part of the hopper, and open the pelletizing part after the strip is qualified The feeding shall be uniform during operation If it is found that the sliver and pill making are not synchronized, it can be adjusted by the knob The pill making is fast in clockwise direction and slow in anticlockwise direction The size of the shot diameter can be achieved by changing different taps, shot making knives and guide wheels 4 When feeding, do not put foreign matters into the hopper, and do not extend your hand into the upper plane of the hopper, so as to avoid hand injury caused by pressing plate Always check whether there is any abnormality in each part of the machine, and stop the machine for inspection immediately in case of any abnormality 5 After use, power off and close the main switch and other switches When removing the strip outlet, the electric heating cover and the unloading head, the hook shaped handle (special) can be used, and then the bracket and the propeller can be pulled out Disassemble the upper part of the hopper and clean the two flap shafts, and apply edible oil after cleaning When reusing, use alcohol to remove oil and disinfect all parts 6 The oil in the reducer shall be kept on the oil free mark, and the waste oil shall be discharged and replaced for two to five person months of normal operation Add edible oil to the oil cup on the hopper three times per shift, and add proper amount of oil to other gear opening sprocket points The above is all the content for you today Through the sharing of the above editor, have you learned the correct installation and operation steps of the pill making machine? I also hope this article can help you.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.