-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
The spherical blaster makes wet particles into beautiful ball balls by setting up rotating centrifuges, blowers, and pneumatic spray guns.
put the wet particles made by the front process into the rotating centrifugal disk, start the blower and then start the rotating centrifugal disk, so that the wet particles by the ring gap air buoyant force, rotational centrifugal force, its own gravity, the ring rope joint movement, thus forming a very high true pellet ball.
this equipment is suitable for the molding of small pills, but also for the preparation of membrane control and skeleton type slow, control small pills, is the pharmaceutical, food and chemical industries to make small pills ideal equipment.
the following small editor a brief introduction to the daily maintenance and maintenance of spherical projectile machine, as follows: 1, directional set pointer position is correct.
damage to the wear-resistant parts and blaster interior guards in the blaster, and replace worn parts in a timely manner.
3, all the projectiles and projectile motors on the fixing bolts loose, found loose immediately fastened.
check 4, check that the flow screen of the separator is uniform and form a full curtain.
5, projectile machine access door is strict.
6, dust pipe leakage phenomenon, dust filter bag has no dust or damage.
7, check the blades,must be replaced when the damage is half.
8, check that the signal indicators on the console are working properly.
9, the spiral shell of the separator and the filter sieve are free of debris and other debris and removed in a timely manner.
10, check that the limit switch, proximity switch status is correct.
11, clean the dust on the electrical control box.
12, whether the electric control of the pill smell valve closed 13, checkwhether the total amount of pills in the pill warehouse is sufficient, insufficient should be added.
14, check the ball tube gasket, work door rubber shield and top seal wear, has been free of projectile loss.
15, remove debris from the base plate grid and ensure the recovery of the projectiles.
16, check that the projectile motor current is in the rated fan.