echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > Daily maintenance of spherical blasters

    Daily maintenance of spherical blasters

    • Last Update: 2020-11-14
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    The spherical blaster makes wet particles into beautiful ball balls by setting up rotating centrifuges, blowers, and pneumatic spray guns.
    put the wet particles made by the front process into the rotating centrifugal disk, start the blower and then start the rotating centrifugal disk, so that the wet particles by the ring gap air buoyant force, rotational centrifugal force, its own gravity, the ring rope joint movement, thus forming a very high true pellet ball.
    this equipment is suitable for the molding of small pills, but also for the preparation of membrane control and skeleton type slow, control small pills, is the pharmaceutical, food and chemical industries to make small pills ideal equipment.
    the following small editor a brief introduction to the daily maintenance and maintenance of spherical projectile machine, as follows: 1, directional set pointer position is correct.
    damage to the wear-resistant parts and blaster interior guards in the blaster, and replace worn parts in a timely manner.
    3, all the projectiles and projectile motors on the fixing bolts loose, found loose immediately fastened.
    check 4, check that the flow screen of the separator is uniform and form a full curtain.
    5, projectile machine access door is strict.
    6, dust pipe leakage phenomenon, dust filter bag has no dust or damage.
    7, check the blades,must be replaced when the damage is half.
    8, check that the signal indicators on the console are working properly.
    9, the spiral shell of the separator and the filter sieve are free of debris and other debris and removed in a timely manner.
    10, check that the limit switch, proximity switch status is correct.
    11, clean the dust on the electrical control box.
    12, whether the electric control of the pill smell valve closed 13, checkwhether the total amount of pills in the pill warehouse is sufficient, insufficient should be added.
    14, check the ball tube gasket, work door rubber shield and top seal wear, has been free of projectile loss.
    15, remove debris from the base plate grid and ensure the recovery of the projectiles.
    16, check that the projectile motor current is in the rated fan.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.