echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Chemical Technology > Dong Energy will build the UK's largest offshore wind operations centre

    Dong Energy will build the UK's largest offshore wind operations centre

    • Last Update: 2022-11-23
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Dong Energy is planning to build an offshore wind operations and maintenance centre
    in Grimsby on the east coast of England.

    The centre is said to be the largest operations centre
    in the UK.
    The facility will be built
    in conjunction with the existing Westermost Rough Wind Operations Centre at Royal Docks.

    With planning permission, the center will initially support
    the 210,000-kilowatt Westermost Rough wind farm, the 580,000-kilowatt Race Bank wind farm and the 1.
    2 million-kilowatt Hornsea offshore wind farm one project.

    The center will also support the
    company's future development of wind farms on the East Coast.

    Brent Cheshire, President of DONG Energy UK, said: "Grimsby's new Operations Centre will first and foremost be a game-changer for the offshore wind industry, taking offshore wind farms to the next level
    .

    The centre will be equipped with high-tech vessels
    developed by Ostensjo Rederi and designed by Rolls-Royce.

    The vessel will be able to accommodate 60 employees and technicians for long-term operations
    at sea.

    The first service operation vessel is expected to arrive by the end of 2017 and will provide O&M services for Dong Energy's Race Bank wind farm
    .
    Race Bank wind farms are under construction
    in Norfolk and Lincolnshire.

    In addition, the centre will include a maritime coordination centre that provides round-the-clock uninterrupted service
    to offshore operations across the UK.

    Dong Energy is planning to build an offshore wind operations and maintenance centre
    in Grimsby on the east coast of England.

    Wind power

    The centre is said to be the largest operations centre
    in the UK.
    The facility will be built
    in conjunction with the existing Westermost Rough Wind Operations Centre at Royal Docks.

    With planning permission, the center will initially support
    the 210,000-kilowatt Westermost Rough wind farm, the 580,000-kilowatt Race Bank wind farm and the 1.
    2 million-kilowatt Hornsea offshore wind farm one project.

    The center will also support the
    company's future development of wind farms on the East Coast.

    Brent Cheshire, President of DONG Energy UK, said: "Grimsby's new Operations Centre will first and foremost be a game-changer for the offshore wind industry, taking offshore wind farms to the next level
    .

    The centre will be equipped with high-tech vessels
    developed by Ostensjo Rederi and designed by Rolls-Royce.

    The vessel will be able to accommodate 60 employees and technicians for long-term operations
    at sea.

    The first service operation vessel is expected to arrive by the end of 2017 and will provide O&M services for Dong Energy's Race Bank wind farm
    .
    Race Bank wind farms are under construction
    in Norfolk and Lincolnshire.

    In addition, the centre will include a maritime coordination centre that provides round-the-clock uninterrupted service
    to offshore operations across the UK.

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.