Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Shi
group
woven
party
case
preparation:review:review: -
first chapterpreparation notes and preparation according to 5
first sectionpreparation notes 5
Section II
the preparation is based 5
Chapter IIEngineering Profiles and Features 7
First SectionEngineering Profiles 7
Second SectionEngineering Objectives 7
Section IIIContracting Scope 8
Section IV
.
main features of . 8
Chapter IIIConstruction Deployment and Construction Preparation 9
First SectionConstruction Preparation 9
Second SectionProcess Arrangements Section
III Construction Deployment Plan 10
Section IVProject Management Team Provision Table 11
Chapter IV Construction Site Layout 12
First SectionConstruction PlanIng Principles 12
Section IIConstruction Layout 12
Section IIITemporary Land Description 12).
Chapter V of the . Construction Process and13
First SectionConstruction Products 13
Section IIConstruction Process and Methods 13
Chapter VI Working Major Construction Machinery and Equipment 19
First SectionMain construction tools 19
Section II Proposed machinery and equipment 19
Chapter VII Technical Organizational Measures to Ensure Safe Production 20
First SectionSafety Production Objectives, Implementation Guidelines and Contents 20
Section II
.
safety production management measures . Section
III Safety and Production Assurance System 25
Chapter VIII Technical Organizational Measures to Ensure Civilized Construction 26
Section IManagement Objectives Section
II General Ideas 26
Section IIIGuaranteed Measures 27
Section IVEnvironmental Protection Measures 28
Section V Environmental Management Measures 29
Chapter 9 Technical Organizational Measures to Ensure Duration 30
First SectionConstruction Period Target
.
30
Section IIConstruction Organization Assurance Measures 30
Section III Construction Technical Assurance Measures 32
Chapter 10 Prevention and Control Measures for Quality General Diseases 33
First SectionExterior Wall Paint Construction General Disease sPrevention and control measures 33
Chapter 11 Seasonal Construction Guarantee Measures 37
First SectionSummer Construction Measures 37
Second SectionRainy Season Construction Measures 38
Section III Winter Construction Measures and Precautions.38
Section IV Seasonal Construction Measures 40
Chapter 12 Finished Product Protection Measures 42
Chapter 13 Project Cost Control 43
Section I Reducing Engineering Cost Measures 43
Chapter 14 Project Coordination and Coordination Measures 44
Section I General 44
Section II Quality Management and Coordination Measures 45
Section III Term Management and Co-ordination Measures 46
Section IV . Safety production, civilized construction management and coordination measures 47
Chapter 15 Return Visit Warranty Measures 49
First Section Quality Warranty Measures 49
Chapter 1 Preparation Notes and Preparation Notes
Section 1 Preparation Notes
First, We are very grateful to the owners of my company's trust and support, gave us the opportunity to participate in the
project
exterior paint project coating construction, and secondly, after careful, comprehensive and meticulous preparation work, we sincerely said that our company fully accept the construction contract documents for the project, and very willing to work with the owners, supervisors, general contractors and other units to complete the construction tasks of the project.
Section 2 of the . Preparation of technical
drawings provided the construction units in accordance with the relevant documents (1);
(2) Construction site survey and other survey materials;
(3) relevant laws, regulations, departmental regulations and
Se., Shanghai
local regulations and regulations on construction management, municipal management, environmental protection, etc.;
(4) all kinds of procedures, norms and evaluation standards for construction structures and construction;
(5) Our company's enterprise standards, quality management, safety management, civilized construction management system and procedures documents and other related documents;
(6) the actual situation of the construction site and surrounding environment of this project;
(7) construction units proposed construction requirements and technical bottom;
(8) "Building Decoration Project Quality Acceptance Standard" (GB50210-20
14
);
(9) "Uniform Standard for Construction Quality Acceptance" (GB503) 00-2013);
(10) The Construction Project Management Code (GB/T50326-2006);
(11) Building Safety Inspection Standards (JGJ59-2011);
(12) Technical Specifications for Safety in Construction Highs (JGJ80-
2016
(13) "Technical Regulations for the Safety of the Use of Construction Machinery" (JGJ33-2012);
(14) "Technical Specifications for temporary electricity safety at construction sites" (JGJ46-2005);
(15) Standards for Safety Protection, Field Health, Environmental Protection and Fire Protection at Construction Sites (DB11/945-2012);
(16) Technical Procedures for the Application of Interior and Exterior Wall Coatings in Buildings (DBJ/T01-107-2006);
(17) Construction and Acceptance Procedures for Building Painting Works (JGJ/T29-20
15
).
Chapter 2 . Engineering Profile
and Features
Section 1 Engineering Profile
Project Name:
Project Address:
Construction Unit:
Supervision Unit:
Total Package Unit:
Construction Unit:
Project Overview:
contracting method: contractor package
construction mode: scaffolding,
hanging basket,
activity scaffolding with construction
Section 2 Gong project objectives
quality requirements: qualified
.
duration requirements:
scheduled to start on , , completed on January , ,
construction duration: days
,
quality warranty period:
2
years.
security objectives: qualifying.
civilized construction management objectives: strive to create a
construction
building safety and civilization construction standardization site.
safety and health environmental management policy: safety first, prevention-oriented;
safety and healthy environment objectives: to eliminate serious injuries, deaths, major construction machinery and equipment damage accidents, to eliminate the main responsibility of major and above traffic construction, to eliminate the continuous serious emissions of environmental pollution accidents.
3 of this . Contract scope
Section 4 Main features
1, construction characteristics
(1) this project
roof for sloped roof
, construction difficulty
relatively large, hanging basket program to be matched.
(2) . The
construction area of
project is
large,
high
construction
.
(3) . The construction of the project is affected by the weather is
.
2, . Main strategy:
(1) scientific division of relatively independent construction project segments, each project segment management is clear, rounded to zero, one by one break.
(2) . Use the supervision company's quality supervision authority to strengthen quality management.
(3) . Use professional construction team to participate in the construction.
(4) . Use the funds of the Group to provide security for the logistics of workers.
(5) . Scientific and reasonable arrangement of material supply, neither affecting progress nor occupying large amounts of funds.
(6) . Adequately stocked workers' resources as a backup force that can be invoked at any time.
(7) . Technical delivery to the construction team in the written form of drawings, tables, etc.