    Exterior paint engineering construction program.

    • Last Update: 2020-10-01
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    Shi

    group
    woven
    party
    case
    preparation:review:review: -
    first chapterpreparation notes and preparation according to 5
    first sectionpreparation notes 5
    Section II
    the preparation is based 5
    Chapter IIEngineering Profiles and Features 7
    First SectionEngineering Profiles 7
    Second SectionEngineering Objectives 7
    Section IIIContracting Scope 8
    Section IV
    .
    main features of . 8
    Chapter IIIConstruction Deployment and Construction Preparation 9
    First SectionConstruction Preparation 9
    Second SectionProcess Arrangements Section
    III Construction Deployment Plan 10
    Section IVProject Management Team Provision Table 11
    Chapter IV Construction Site Layout 12
    First SectionConstruction PlanIng Principles 12
    Section IIConstruction Layout 12
    Section IIITemporary Land Description 12).
    Chapter V of the . Construction Process and13
    First SectionConstruction Products 13
    Section IIConstruction Process and Methods 13
    Chapter VI Working Major Construction Machinery and Equipment 19
    First SectionMain construction tools 19
    Section II Proposed machinery and equipment 19
    Chapter VII Technical Organizational Measures to Ensure Safe Production 20
    First SectionSafety Production Objectives, Implementation Guidelines and Contents 20
    Section II
    .
    safety production management measures . Section
    III Safety and Production Assurance System 25
    Chapter VIII Technical Organizational Measures to Ensure Civilized Construction 26
    Section IManagement Objectives Section
    II General Ideas 26
    Section IIIGuaranteed Measures 27
    Section IVEnvironmental Protection Measures 28
    Section V Environmental Management Measures 29
    Chapter 9 Technical Organizational Measures to Ensure Duration 30
    First SectionConstruction Period Target
    .
    30
    Section IIConstruction Organization Assurance Measures 30
    Section III Construction Technical Assurance Measures 32
    Chapter 10 Prevention and Control Measures for Quality General Diseases 33
    First SectionExterior Wall Paint Construction General Disease sPrevention and control measures 33
    Chapter 11 Seasonal Construction Guarantee Measures 37
    First SectionSummer Construction Measures 37
    Second SectionRainy Season Construction Measures 38
    Section III Winter Construction Measures and Precautions.38
    Section IV Seasonal Construction Measures 40
    Chapter 12 Finished Product Protection Measures 42
    Chapter 13 Project Cost Control 43
    Section I Reducing Engineering Cost Measures 43
    Chapter 14 Project Coordination and Coordination Measures 44
    Section I General 44
    Section II Quality Management and Coordination Measures 45
    Section III Term Management and Co-ordination Measures 46
    Section IV . Safety production, civilized construction management and coordination measures 47
    Chapter 15 Return Visit Warranty Measures 49
    First Section Quality Warranty Measures 49
    Chapter 1 Preparation Notes and Preparation Notes
    Section 1 Preparation Notes
    First, We are very grateful to the owners of my company's trust and support, gave us the opportunity to participate in the
    project
    exterior paint project coating construction, and secondly, after careful, comprehensive and meticulous preparation work, we sincerely said that our company fully accept the construction contract documents for the project, and very willing to work with the owners, supervisors, general contractors and other units to complete the construction tasks of the project.
    Section 2 of the . Preparation of technical
    drawings provided the construction units in accordance with the relevant documents (1);
    (2) Construction site survey and other survey materials;
    (3) relevant laws, regulations, departmental regulations and
    Se., Shanghai
    local regulations and regulations on construction management, municipal management, environmental protection, etc.;
    (4) all kinds of procedures, norms and evaluation standards for construction structures and construction;
    (5) Our company's enterprise standards, quality management, safety management, civilized construction management system and procedures documents and other related documents;
    (6) the actual situation of the construction site and surrounding environment of this project;
    (7) construction units proposed construction requirements and technical bottom;
    (8) "Building Decoration Project Quality Acceptance Standard" (GB50210-20
    14
    );
    (9) "Uniform Standard for Construction Quality Acceptance" (GB503) 00-2013);
    (10) The Construction Project Management Code (GB/T50326-2006);
    (11) Building Safety Inspection Standards (JGJ59-2011);
    (12) Technical Specifications for Safety in Construction Highs (JGJ80-
    2016

    (13) "Technical Regulations for the Safety of the Use of Construction Machinery" (JGJ33-2012);
    (14) "Technical Specifications for temporary electricity safety at construction sites" (JGJ46-2005);
    (15) Standards for Safety Protection, Field Health, Environmental Protection and Fire Protection at Construction Sites (DB11/945-2012);
    (16) Technical Procedures for the Application of Interior and Exterior Wall Coatings in Buildings (DBJ/T01-107-2006);
    (17) Construction and Acceptance Procedures for Building Painting Works (JGJ/T29-20
    15
    ).
    Chapter 2 . Engineering Profile
    and Features
    Section 1 Engineering Profile
    Project Name:
    Project Address:
    Construction Unit:
    Supervision Unit:
    Total Package Unit:
    Construction Unit:
    Project Overview:
    contracting method: contractor package
    construction mode: scaffolding,
    hanging basket,
    activity scaffolding with construction
    Section 2 Gong project objectives
    quality requirements: qualified

    .
    duration requirements:
    scheduled to start on , , completed on January , ,
    construction duration: days
    ,
    quality warranty period:
    2
    years.
    security objectives: qualifying.
    civilized construction management objectives: strive to create a
    construction
    building safety and civilization construction standardization site.
    safety and health environmental management policy: safety first, prevention-oriented;
    safety and healthy environment objectives: to eliminate serious injuries, deaths, major construction machinery and equipment damage accidents, to eliminate the main responsibility of major and above traffic construction, to eliminate the continuous serious emissions of environmental pollution accidents.
    3 of this . Contract scope
    Section 4 Main features
    1, construction characteristics
    (1) this project
    roof for sloped roof
    , construction difficulty
    relatively large, hanging basket program to be matched.
    (2) . The
    construction area of
    project is
    large,
    high
    construction
    .
    (3) . The construction of the project is affected by the weather is
    .
    2, . Main strategy:
    (1) scientific division of relatively independent construction project segments, each project segment management is clear, rounded to zero, one by one break.
    (2) . Use the supervision company's quality supervision authority to strengthen quality management.
    (3) . Use professional construction team to participate in the construction.
    (4) . Use the funds of the Group to provide security for the logistics of workers.
    (5) . Scientific and reasonable arrangement of material supply, neither affecting progress nor occupying large amounts of funds.
    (6) . Adequately stocked workers' resources as a backup force that can be invoked at any time.
    (7) . Technical delivery to the construction team in the written form of drawings, tables, etc.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.