-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Long-term use of factory-made small chillers what kind of failure can be encountered.
and for industrial chillers, if the problem of water cut-off is very dangerous, it needs to be dealt with in a timely and effective manner.
delay in processing time can lead to serious failure of industrial chillers and even equipment failure.
cause of water cut-off failure in industrial chillers is different, so when dealing with the fault, it is necessary to analyze the specific causes of water cut-off.
Daily use of industrial chillers, industrial chillers all rely on water to take away hot air, if at high speed, suddenly there is no flow of water, then a large amount of heat can not be volatile in time, resulting in a very fast rise in temperature.
when temperatures reach high temperature thresholds, industrial cold water opportunities protect themselves by shut down.
as a result, industrial chillers usually stop operating for about 15 minutes to protect the core components of industrial chillers.
you deal with a water problem? 1, to distinguish the specific causes of water cut-off industrial chillers have different causes of water-breaking failure, so in the handling of the fault, first of all, we need to analyze the specific causes of water cut-off.
the operation of industrial chillers can be resumed simply by restoring the supply of water in a timely manner due to water problems.
if it belongs to the water pump type of fault, at this time needs to carry out comprehensive maintenance and maintenance of equipment, timely troubleshooting of the pump, at the same time a comprehensive test.
to ensure that the pump returns to normal operation before the industrial chiller can be turned on properly.
2, immediately stop maintenance until the water flow returns to normal in the maintenance of industrial chillers need to stop operation.
also shut down for about ten minutes due to the increased heat generated by the industrial cold water opportunity in operation.
therefore in the state of shutdown maintenance testing, can avoid the production of additional high temperature, mainly to ensure that the industrial chiller in the normal operating temperature range, can ensure that the industrial chiller in a normal operating state.
not need to panic too much when you encounter a variety of industrial chillers.
use of professional equipment for industrial chillers to carry out careful analysis, can find out the root cause of the failure.
according to their specific capabilities, to develop a suitable maintenance plan, in a certain period of time, to ensure that industrial chillers re-operation.