-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On June 6th , the Gulei Refining and Chemical Integration Project undertook by the Shijian Company had a successful no-load test run of the 800,000- ton / year ethylene plant cracking gas compressor unit, which marked the start of the Gulei Refining and Chemical Ethylene Project in preparation for start-up
.
.
It is understood that the compressor unit is the core equipment of the ethylene plant.
The no-load test power of the compressor unit is 29225 kilowatts, the speed is 4795/ min, and the maximum design pressure is 4.
2 MPa
.
The no-load test power of the compressor unit is 29225 kilowatts, the speed is 4795/ min, and the maximum design pressure is 4.
2 MPa
.
At present, the employees participating in the construction continue to keep up with the trial operation status of the compressor unit, which provides a strong guarantee for the successful start-up of the Gulei Refining and Chemical Ethylene Plant
.
.
As early as December 2018 , the first phase of the Fujian Gulei Refining and Chemical Integration Project issued a device change announcement .
After the change, 16 sets of main equipment were reduced to 11 sets, including: 800,000 tons / year steam cracking, 550,000 tons / year pyrolysis gasoline hydrogenation, 350,000 tons / year aromatics extraction, 130,000 tons / year butadiene Extraction, 300,000 tons / year ethylene - vinyl acetate resin (EVA) , 10 / 700,000 tons of ethylene oxide / ethylene glycol ( EO/EG ), 600,000 tons / year of styrene (SM) , 350,000 tons / Year polypropylene (PP) and
100,000 tons / year thermoplastic elastomer (SBS) , 260,000 tons / year hydrogen peroxide and 200,000 tons / year propylene oxide
.
After the change, 16 sets of main equipment were reduced to 11 sets, including: 800,000 tons / year steam cracking, 550,000 tons / year pyrolysis gasoline hydrogenation, 350,000 tons / year aromatics extraction, 130,000 tons / year butadiene Extraction, 300,000 tons / year ethylene - vinyl acetate resin (EVA) , 10 / 700,000 tons of ethylene oxide / ethylene glycol ( EO/EG ), 600,000 tons / year of styrene (SM) , 350,000 tons / Year polypropylene (PP) and
100,000 tons / year thermoplastic elastomer (SBS) , 260,000 tons / year hydrogen peroxide and 200,000 tons / year propylene oxide
.