Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
After buying a new house, everyone wants to be able to renovate and move into the new house as soon as possible. As a result, many owners are very concerned about how long it will take for the wall paint to be refurbished. How long does it take to renovate the house? Let's give you a brief
.
usually takes about 45-65 days to renovate and refurbish the wall paint. The decoration of the house is related to the size of the house, whether it is hard or simple. For example, if the house is large and beautifully decorated, it can take three to four months or more. Any questions about how long it takes to renovate a wall coating will affect the entire renovation process.
2, when we are renovating wall coatings, we have to be prepared for the initial phase. For example, select a decoration company, which will measure the room at the door and draw design drawings. The owner talks to the designer to determine the final plan. The owner reviews the budget contract and signs the renewal contract. Before entering the premises, the owner must also go through the relevant formalities at the property office. The previous team usually takes about 10 days.
3, the next step is the construction team to renovate the house. First, the construction team will completely renovate the structure of the house according to the design drawings. If the house is a small to medium sized apartment, it usually takes 1 to 2 days. Then there's the water that transforms the house.
4, construction crews will carry out mud works, such as waterproof kitchens, bathrooms and tiles. This project usually takes about 15 days. Then came carpentry, carpenters would form a back wall, roof base, etc. It usually takes about 15-20 days. The painter then enters the field, paints the walls, and the painting project takes 10 to 15 days. Finally, sanitary ware, cabinets, lamps and other products usually take 4 to 6 days to install.