echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Infection > How should the health care system be upgraded in the context of the outbreak? Reference templates are available in Northern Ireland.

    How should the health care system be upgraded in the context of the outbreak? Reference templates are available in Northern Ireland.

    • Last Update: 2020-08-11
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    Now that the global outbreak of new crown pneumonia is evolving rapidly, the recurrence of the outbreak will undoubtedly significantly increase the pressure on the public health system.
    the Health Department of Lisbon, Northern Ireland, has proposed an upgrade to the health system as part of the response to the new outbreak of pneumonia.
    local health care upgrades are also worth referring to.
    establish a ring hub for daily cases to relieve the pressure on medical services.
    the local Ministry of Health has planned Lisbon's Lagan Valley Hospital as a day surgery centre in phases, with two more centres expected to open in the autumn.
    The Day Surgery Center at Lagan Valley Hospital will handle general surgery, otolaryngology, gynecology, urology and some simple daily medical services.
    projected that about 136,000 operations will be transferred to the centre each year since then.
    Lagan Valley Emergency Department will remain open and a separate entrance for patients with new crown pneumonia will be established.
    emergency departments can operate separately from the new day care centres, manage independently and protect patients and staff from the new coronavirus.
    fixed-point orthopaedic hospitals to reduce waiting lists.
    Will Lisbon's Musgrave Park Hospital and Otna Grava Regional Hospital will be designated as orthopaedic surgery centres and will also have a separate entrance to control the outbreak, according to local health documents.
    in Northern Ireland, orthopaedic patients have the longest waiting periods in the UK, with some waiting for hip replacement surgery for up to four or five years.
    In order to alleviate this pressure, the two hospitals, together with the first outbreak of the new crown outbreak, are gradually reconstructing orthopaedic surgery while receiving cases of new crown pneumonia, with the long-term goal of establishing a regional orthopaedic practice network based on the existing orthopaedic sector alliance.
    the Lisbon Ministry of Health this series of initiatives has greatly alleviated the current outbreak pressure and daily medical services pressure between the contradiction, in the resumption of hospital services as soon as possible at the same time, to ensure the safety of patients and staff.
    in the future, a well-planned health care system and specialized treatment centres will also help to respond to a possible second wave of outbreaks and improve the efficiency and coverage of daily medical services.
    can be seen that the Lisbon Ministry of Health this series of measures and the National Health And Health Commission Office on strengthening the management of medical services during the outbreak to meet the basic medical needs of the masses mentioned in the notice of the "classification of treatment, and effectively protect the medical needs of different patients" central idea, worthy of more reference and thinking.
    Article Source: BBC Article Link: Coronavirus: Robin Swann Reveals Plan to Hospital Service Bao Tiancheng Source: Health World !-- End of Content Presentation - !-- Determine Whether login ends.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.