-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
With the country's vigorous promotion of the transformation of energy consumption structure, major photovoltaic companies have also accelerated the pace of power station construction, and the northeast has become the next target market
.
JinkoPower, a leading domestic distributed photovoltaic company, recently announced that the 20MW photovoltaic power station project in Daqing Datong District, Heilongjiang, invested and built by the company, has been officially connected to the grid, which is also JinkoPower's first officially connected photovoltaic project
in Northeast China.
It is reported that Heilongjiang Province belongs to China's solar energy resources rich area, the project is located in Datong District has a long sunshine time, the total annual radiation is 4877.
5MJ/m2, the annual sunshine hours are 2730.
6 hours, belongs to the solar energy abundant area, very suitable for the construction of large-scale ground photovoltaic power plants
.
In addition, according to the "Several Opinions of the Daqing Municipal People's Government on Promoting the Development of the Photovoltaic Industry (Trial)" issued by the Heilongjiang Provincial Government, adhere to demonstration to lead joint development; Use saline-alkali land, waste land and other unused land to build large-scale ground photovoltaic power plants
.
Therefore, driven by the dual power of resources and policies, the development of the photovoltaic industry in Heilongjiang Province and the entire northeast region has ushered in a new round of development opportunities
.
The average annual power generation of the project is 24.
394 million kWh in 25 years, and the equivalent annual utilization hours are 1209h
.
According to this estimate, after the project is put into operation, it can save about 10,777.
79 tons of coal per year, reduce about 62 tons of soot emissions, about 29 tons of SO2 and about 20,700 tons of CO2, which can effectively reduce the use of pulverized coal and reduce pollutant emissions, and effectively solve the problems of
local peak electricity consumption load in winter.
Jinko Power CEO Qiao Junping said that the formal grid-connected operation of the project will play an important demonstration role
in driving the economic development of the Daqing region, leading industrial upgrading and increasing the proportion of industry.
With the country's vigorous promotion of the transformation of energy consumption structure, major photovoltaic companies have also accelerated the pace of power station construction, and the northeast has become the next target market
.
JinkoPower, a leading domestic distributed photovoltaic company, recently announced that the 20MW photovoltaic power station project in Daqing Datong District, Heilongjiang, invested and built by the company, has been officially connected to the grid, which is also JinkoPower's first officially connected photovoltaic project
in Northeast China.
It is reported that Heilongjiang Province belongs to China's solar energy resources rich area, the project is located in Datong District has a long sunshine time, the total annual radiation is 4877.
5MJ/m2, the annual sunshine hours are 2730.
6 hours, belongs to the solar energy abundant area, very suitable for the construction of large-scale ground photovoltaic power plants
.
In addition, according to the "Several Opinions of the Daqing Municipal People's Government on Promoting the Development of the Photovoltaic Industry (Trial)" issued by the Heilongjiang Provincial Government, adhere to demonstration to lead joint development; Use saline-alkali land, waste land and other unused land to build large-scale ground photovoltaic power plants
.
Therefore, driven by the dual power of resources and policies, the development of the photovoltaic industry in Heilongjiang Province and the entire northeast region has ushered in a new round of development opportunities
.
The average annual power generation of the project is 24.
394 million kWh in 25 years, and the equivalent annual utilization hours are 1209h
.
According to this estimate, after the project is put into operation, it can save about 10,777.
79 tons of coal per year, reduce about 62 tons of soot emissions, about 29 tons of SO2 and about 20,700 tons of CO2, which can effectively reduce the use of pulverized coal and reduce pollutant emissions, and effectively solve the problems of
local peak electricity consumption load in winter.
Jinko Power CEO Qiao Junping said that the formal grid-connected operation of the project will play an important demonstration role
in driving the economic development of the Daqing region, leading industrial upgrading and increasing the proportion of industry.