echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Kang Ning, Director of the Soil Division of the Sichuan Environmental Protection Department: Achieve "full coverage" of hazardous waste disposal facilities

    Kang Ning, Director of the Soil Division of the Sichuan Environmental Protection Department: Achieve "full coverage" of hazardous waste disposal facilities

    • Last Update: 2021-07-17
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    "Global Coatings Network News"

    "Global Coatings Network News" "Global Coatings Network News"

    Currently , Sichuan Province has a comprehensive disposal capacity of 93,600 tons.


    Currently , Sichuan Province has a comprehensive disposal capacity of 93,600 tons.


    To address this situation, after the "Sichuan hazardous waste disposal facility construction plan (2017 - 2022 Nian ) " ( hereinafter referred to as "Plan" ) , approved by the Sichuan provincial government has formally issued implemented.


    To address this situation, after the "Sichuan hazardous waste disposal facility construction plan (2017 - 2022 Nian ) " ( hereinafter referred to as "Plan" ) , approved by the Sichuan provincial government has formally issued implemented.


    Start from the "top-level" design.


    Start from the "top-level" design.


    It is necessary to consider the integrity while fully embodying the system.


    It is necessary to consider the integrity while fully embodying the system.


    Concentrate on the problems that need to be solved in a centralized manner, and deal with them nearby, and provide "undercover" protection.


    Concentrate on the problems that need to be solved in a centralized manner, and deal with them nearby, and provide "undercover" protection.


    The construction of centralized disposal facilities for hazardous waste is a problem that needs to be solved urgently.


    The construction of centralized disposal facilities for hazardous waste is a problem that needs to be solved urgently.


      

    In view of the current situation of the gap in the disposal capacity of hazardous waste and medical waste, in accordance with the "moderate advancement" principle proposed in the "Plan", encourage social capital to participate in the collection, storage, transportation, and disposal of hazardous waste, and build a batch of centralized disposal facilities for hazardous waste.


    In view of the current situation of the gap in the disposal capacity of hazardous waste and medical waste, in accordance with the "moderate advancement" principle proposed in the "Plan", encourage social capital to participate in the collection, storage, transportation, and disposal of hazardous waste, and build a batch of centralized disposal facilities for hazardous waste.


      

    Insufficient disposal capacity has also resulted in outstanding risks of long-distance transportation.


    Insufficient disposal capacity has also resulted in outstanding risks of long-distance transportation.


      

    In order to solve this problem, we propose to centralize the layout and deal with them nearby.
    Mainly take the city ( prefecture ) as the unit to build a batch of centralized disposal facilities for hazardous waste to provide a "underground" guarantee for the disposal of hazardous waste in its jurisdiction to meet emergency needs.
    Each city and prefecture must build a centralized disposal site to basically solve the problem of hazardous waste disposal within its jurisdiction.
    However, according to the actual situation, neighboring cities and prefectures with small hazardous waste production and relatively close distances, such as Neijiang and Ziyang, are encouraged to build together.

    In order to solve this problem, we propose to centralize the layout and deal with them nearby.
    Mainly take the city ( prefecture ) as the unit to build a batch of centralized disposal facilities for hazardous waste to provide a "underground" guarantee for the disposal of hazardous waste in its jurisdiction to meet emergency needs.
    Each city and prefecture must build a centralized disposal site to basically solve the problem of hazardous waste disposal within its jurisdiction.
    However, according to the actual situation, neighboring cities and prefectures with small hazardous waste production and relatively close distances, such as Neijiang and Ziyang, are encouraged to build together.
    In order to solve this problem, we propose to centralize the layout and deal with them nearby.
    Mainly take the city ( ( state ) ) as the unit to build a batch of centralized disposal facilities for hazardous wastes, and provide “underground” guarantees for the disposal of hazardous wastes in its jurisdiction to meet emergency needs.
    Each city and prefecture must build a centralized disposal site to basically solve the problem of hazardous waste disposal within its jurisdiction.
    However, according to the actual situation, neighboring cities and prefectures with small hazardous waste production and relatively close distances, such as Neijiang and Ziyang, are encouraged to build together.

     

      

    How to achieve the goal in the future 5 years in two steps

    How to achieve the goal in the future 5 years in two stepsHow to achieve the goal in the future 5 Five years in two steps

     

      

    According to the "Plan" proposed, Sichuan in the next 5 "two-step" years, and ultimately to the 2020 Hazardous Waste additional capacity 40.
    5 Wandun / year to the 2022 annual additional capacity of 23.
    3 Wandun / target year .

    According to the "Plan" proposed, Sichuan in the next 5 "two-step" years, and ultimately to the 2020 Hazardous Waste additional capacity 40.
    5 Wandun / year to the 2022 annual additional capacity of 23.
    3 Wandun / target year .
    According to the "Plan" proposed, Sichuan in the next 5 5 "two-step" years, and ultimately to 2020 2020 Hazardous Waste additional capacity 40.
    5 40.
    5 Wandun / / year to 2022 2022 annual additional capacity 23.
    3 23.
    3 ten thousand t / / year target.

     

      

    The first step: By 2020 , Chengdu ( Longquan Phase 2 ) , Mianyang City, Suining City, Leshan City and other pre-stage work will be faster, and 7 hazardous waste centralized disposal facilities with solid foundation work will be fully completed, and hazardous waste disposal will be added.
    The capacity is 405,000 tons / year, and the province's centralized disposal capacity of hazardous waste reaches 498,600 tons / year.

    The first step: By 2020 , Chengdu ( Longquan Phase 2 ) , Mianyang City, Suining City, Leshan City and other pre-stage work will be faster, and 7 hazardous waste centralized disposal facilities with solid foundation work will be fully completed, and hazardous waste disposal will be added.
    The capacity is 405,000 tons / year, and the province's centralized disposal capacity of hazardous waste reaches 498,600 tons / year.
    The first step to 2020 2020 years, the Chengdu ( ( Longquan 2 2 Qi ) ) preliminary work, Mianyang, Suining, Leshan City, and other faster, more solid basis for the work of 7 7 dangerous waste disposal facility project fully completed, new hazardous waste disposal capacity 40.
    5 40.
    5 Wandun / / , the province's hazardous waste disposal capacity reached 49.
    86 49.
    86 Wandun / / years.

     

      

    The second step: By 2022 , 6 hazardous waste centralized disposal facilities projects in Chengdu ( Jianyang ) , Luzhou City, Guang'an City, Dazhou City, Liangshan Prefecture, etc.
    will be fully completed, and the new hazardous waste disposal capacity will be 233,000 tons per year.
    The centralized disposal capacity of hazardous waste reaches 731,600 tons / year.

    The second step: By 2022 , 6 hazardous waste centralized disposal facilities projects in Chengdu ( Jianyang ) , Luzhou City, Guang'an City, Dazhou City, Liangshan Prefecture, etc.
    will be fully completed, and the new hazardous waste disposal capacity will be 233,000 tons per year.
    The centralized disposal capacity of hazardous waste reaches 731,600 tons / year.
    The second step to the 2022 2022 years, the Chengdu ( ( Jianyang ) ) , Luzhou, Guang'an, Dazhou, Liangshan and other 6 6 dangerous waste disposal facility project fully completed, the new hazardous waste disposal capacity 23.
    3 23.
    3 Wandun / / , the province's hazardous waste disposal capacity reached 73.
    16 73.
    16 Wandun / / years.

     

      

    In terms of strengthening the construction of disposal facilities, the "Plan" puts forward requirements for promoting the construction of medical waste disposal facilities.

    In terms of strengthening the construction of disposal facilities, the "Plan" puts forward requirements for promoting the construction of medical waste disposal facilities.
    In terms of strengthening the construction of disposal facilities, the "Plan" puts forward requirements for promoting the construction of medical waste disposal facilities.

     

      

    The "Plan" clearly stated that it is necessary to speed up the implementation of 3 centralized medical waste disposal projects in Neijiang City, Ganzi Prefecture, and Aba Prefecture , actively expand the capacity of centralized medical waste disposal facilities in 8 prefecture-level cities including Chengdu , and promote 7 counties including Jiangyou City.
    The construction of centralized medical waste disposal facilities in first-level cities will increase the capacity of centralized medical waste disposal by 72,300 tons per year after all are completed and put into operation in 2020 .
    Focus on nine counties with a population of more than one million , including Zhongjiang County , to promote the construction of county-level medical waste centralized disposal facilities.

    The "Plan" clearly stated that it is necessary to speed up the implementation of 3 centralized medical waste disposal projects in Neijiang City, Ganzi Prefecture, and Aba Prefecture , actively expand the capacity of centralized medical waste disposal facilities in 8 prefecture-level cities including Chengdu , and promote 7 counties including Jiangyou City.
    The construction of centralized medical waste disposal facilities in first-level cities will increase the capacity of centralized medical waste disposal by 72,300 tons per year after all are completed and put into operation in 2020 .
    Focus on nine counties with a population of more than one million , including Zhongjiang County , to promote the construction of county-level medical waste centralized disposal facilities.
    "Plan" clearly, to accelerate the implementation of Neijiang City, Ganzi, Aba and other 3 3 medical waste disposal project focus, active in Chengdu and other 8 8 prefecture-level city medical waste disposal facility expansion, such as promoting Jiangyou City 7 7 medical waste disposal facility construction centralized county-level cities, 2020 2020 after all put into operation, the new centralized medical waste disposal capacity 7.
    23 7.
    23 Wandun / / years.
    Zhongjiang County 9 9 more than million people the county, focusing on promoting the county medical waste disposal facility construction.

     

      

    Accelerate the construction of medical waste centralized disposal facilities in 24 areas with large amounts of medical waste or remote areas, including Wangcang County, Jiange County, and Daying County.
    By 2020 , the new centralized disposal capacity will be 16,900 tons / year.
    By 2020 , the province's medical waste disposal capacity will reach 142,900 tons / year, of which 89,200 tons / year will be added.

    Accelerate the construction of medical waste centralized disposal facilities in 24 areas with large amounts of medical waste or remote areas, including Wangcang County, Jiange County, and Daying County.
    By 2020 , the new centralized disposal capacity will be 16,900 tons / year.
    By 2020 , the province's medical waste disposal capacity will reach 142,900 tons / year, of which 89,200 tons / year will be added.
    Accelerate Wangcang, Jiange, Daying County and other 24- 24- medical waste centralized disposal of medical waste facilities large or remote areas, to 2020 2020 in the new centralized disposal capacity 1.
    69 1.
    69 Wandun / / years.
    To 2020 2020 , the province's medical waste disposal capacity reached 14.
    29 14.
    29 Wandun / / year, including the ability to add 8.
    92 8.
    92 Wandun / / years.

     

      

    In addition, focusing on Deyang City, Neijiang City, Zigong City, Mianyang City, Guangyuan City, Dazhou City, and Luzhou City, we will orderly promote the pilot cement kiln co-processing, and promote the cement industry to use existing cement kilns to co-process hazardous waste in accordance with local conditions.
    An effective supplement to regional hazardous waste disposal.

    In addition, focusing on Deyang City, Neijiang City, Zigong City, Mianyang City, Guangyuan City, Dazhou City, and Luzhou City, we will orderly promote the pilot cement kiln co-processing, and promote the cement industry to use existing cement kilns to co-process hazardous waste in accordance with local conditions.
    An effective supplement to regional hazardous waste disposal.
    In addition, focusing on Deyang City, Neijiang City, Zigong City, Mianyang City, Guangyuan City, Dazhou City, and Luzhou City, we will orderly promote the pilot cement kiln co-processing, and promote the cement industry to use existing cement kilns to co-process hazardous waste in accordance with local conditions.
    An effective supplement to regional hazardous waste disposal.

     

      

    Improve comprehensive utilization capacity and strengthen supervision system construction

    Improve comprehensive utilization capacity and strengthen supervision system constructionImprove comprehensive utilization capacity and strengthen supervision system construction

     

      

    While increasing the construction of disposal facilities, we must continue to improve the hazardous waste collection, storage and transportation system and strengthen the construction of the supervision system.

    While increasing the construction of disposal facilities, we must continue to improve the hazardous waste collection, storage and transportation system and strengthen the construction of the supervision system.
    While increasing the construction of disposal facilities, we must continue to improve the hazardous waste collection, storage and transportation system and strengthen the construction of the supervision system.

     

      

    First of all, we must improve the comprehensive utilization of hazardous waste.
    Vigorously promote the construction of comprehensive utilization facilities for hazardous waste resources, expand and strengthen the environmental protection industry, and significantly improve the level of hazardous waste resource utilization.

    First of all, we must improve the comprehensive utilization of hazardous waste.
    Vigorously promote the construction of comprehensive utilization facilities for hazardous waste resources, expand and strengthen the environmental protection industry, and significantly improve the level of hazardous waste resource utilization.
    First of all, we must improve the comprehensive utilization of hazardous waste.
    Vigorously promote the construction of comprehensive utilization facilities for hazardous waste resources, expand and strengthen the environmental protection industry, and significantly improve the level of hazardous waste resource utilization.

     

      

    Second, it is necessary to strengthen the supervision of enterprises' self-built disposal and utilization facilities.
    Gradually requires hazardous waste generated in the amount of 1 or more tons of companies, parks and large petrochemical industry base supporting the construction of hazardous waste disposal facilities use, encourage self-built facilities to carry out the disposal of surplus capacity utilization of external business services.

    Second, it is necessary to strengthen the supervision of enterprises' self-built disposal and utilization facilities.
    Gradually requires hazardous waste generated in the amount of 1 or more tons of companies, parks and large petrochemical industry base supporting the construction of hazardous waste disposal facilities use, encourage self-built facilities to carry out the disposal of surplus capacity utilization of external business services.
    Second, it is necessary to strengthen the supervision of enterprises' self-built disposal and utilization facilities.
    Gradually requirements for hazardous waste generation in the 1 1 or more tons of companies, parks and large petrochemical industry base supporting the construction of hazardous waste disposal facilities use, encourage the use of disposal facilities to carry out foreign self-built business services have surplus capacity.

     

      

    Third, it is necessary to improve the collection system of hazardous wastes from domestic sources.
    Combined with the "Three-Year Promotion Plan for the Construction of Urban and Rural Garbage Treatment Facilities in the Province", Sichuan will focus on the establishment of municipal cities and carry out pilot projects for the construction of hazardous waste collection, storage and transportation facilities for domestic sources.
    Improve the collection, storage and transportation system of all kinds of waste batteries containing mercury, cadmium, lead, nickel, waste medicines, waste mercury-containing fluorescent lamps, waste mercury-containing thermometers and sphygmomanometers.
    By 2022 , at least one demonstration project for the collection, storage and transportation of hazardous wastes from domestic sources will be completed in every city with a city.

    Third, it is necessary to improve the collection system of hazardous wastes from domestic sources.
    Combined with the "Three-Year Promotion Plan for the Construction of Urban and Rural Garbage Treatment Facilities in the Province", Sichuan will focus on the establishment of municipal cities and carry out pilot projects for the construction of hazardous waste collection, storage and transportation facilities for domestic sources.
    Improve the collection, storage and transportation system of all kinds of waste batteries containing mercury, cadmium, lead, nickel, waste medicines, waste mercury-containing fluorescent lamps, waste mercury-containing thermometers and sphygmomanometers.
    By 2022 , at least one demonstration project for the collection, storage and transportation of hazardous wastes from domestic sources will be completed in every city with a city.
    Third, it is necessary to improve the collection system of hazardous wastes from domestic sources.
    Combined with the "Three-Year Promotion Plan for the Construction of Urban and Rural Garbage Treatment Facilities in the Province", Sichuan will focus on the establishment of cities to carry out pilot projects for the construction of hazardous waste collection, storage and transportation facilities for domestic sources.
    Improve the collection, storage and transportation system of all kinds of waste batteries containing mercury, cadmium, lead, nickel, waste medicines, waste mercury-containing fluorescent lamps, waste mercury-containing thermometers and sphygmomanometers.
    By 2022 and 2022 , at least one demonstration project for the collection, storage and transportation of hazardous wastes from domestic sources will be completed in every city with a municipality.

     

      

    At the same time, priority will be given to the advancement of pilot projects in areas with large disposal demand in Chengdu, Deyang, Mianyang, and Guangyuan.
    By the end of 2022 , 19 recycling points will be built , forming a collection capacity of 500,000 tons / year.
    And constantly improve the laboratory hazardous waste management system, and carry out the pilot work of laboratory waste classified collection, pretreatment and centralized disposal.

    At the same time, priority will be given to the advancement of pilot projects in areas with large disposal demand in Chengdu, Deyang, Mianyang, and Guangyuan.
    By the end of 2022 , 19 recycling points will be built , forming a collection capacity of 500,000 tons / year.
    And constantly improve the laboratory hazardous waste management system, and carry out the pilot work of laboratory waste classified collection, pretreatment and centralized disposal.
    At the same time, promote the priority Chengdu, Deyang, Mianyang, Guangyuan and other regional pilot disposal of greater demand, the 2022 2022 year-end, completed 19 19 collection points, form 50 50 Wandun / / year gathering capabilities.
    And constantly improve the laboratory hazardous waste management system, and carry out the pilot work of laboratory waste classified collection, pretreatment and centralized disposal.

     

      

    Through the establishment of a sound supervision system covering the entire process of hazardous waste generation, storage, transfer, and disposal, and innovative supervision methods and mechanisms, the province will eventually build a solid waste management information system across the province, and establish a regional cooperation and coordination mechanism for hazardous waste emergency disposal.

    Through the establishment of a sound supervision system covering the entire process of hazardous waste generation, storage, transfer, and disposal, and innovative supervision methods and mechanisms, the province will eventually build a solid waste management information system across the province, and establish a regional cooperation and coordination mechanism for hazardous waste emergency disposal.
    Through the establishment of a sound supervision system covering the entire process of hazardous waste generation, storage, transfer, and disposal, and innovative supervision methods and mechanisms, the province will eventually build a solid waste management information system across the province, and establish a regional cooperation and coordination mechanism for hazardous waste emergency disposal.

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.