Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Paint Network
News: the external wall special waterproof glue by special silicone propylene polymer emulsion with inorance powder composed of two-part waterproof material, with concrete, masonry have a high bonding force, but also have good toughness, water resistance, crack resistance, anti-freeze and durability.
Linde waterproof (universal type) K11
Linde waterproof (flexible type) K11
product features:
1. Products are environmentally friendly water-based waterproof products, non-toxic, harmless, non-polluting,
2. Strong bonding force, can be solidly bonded in various base materials such as substation and cement mortar
3. Can be directly constructed on a variety of materials in wet (
water); The coating film is tough, high strength and high bullet, water resistance, durability is excellent
5. Excellent weather resistance;
6. Products have good elasticity and waterproof effect.
scope of application:
suitable for outdoor walls and projects such as road bridges, tunnels waterproof works.
main technical indicators:
construction requirements:
1. Grass-roots treatment: grass-roots requirements flat, solid, clean, no clear water, cracks should be repaired, yin and yang corners to make arcs. Before using waterproof products for construction, the old mixed soil must be cleaned with a strong de-fouling industrial detergent or oil detergent, then rinsed with clean water, dried and
brushed; Preparation base coating: according to liquid: powder: water: 1:1.5: 0.8 (
mass ratio); Preparation products: according to the liquid: powder: 1:1.5 (quality ratio), the powder will be slowly added to the liquid, while turning on the electric mixer, fully stirred evenly, you can
use; Key points of operation: Apply with a roller brush or scraper, in a thin coating way many times. Each coating film should not be too thick, otherwise dry solidification time is longer. The coating of the rear channel shall be carried out after the front channel coating has been dried. The construction of the protective layer is carried out after the last coating of the waterproof layer is completely dry. (About 5-7 days at room temperature).
:
1. Cannot be constructed below 5 degrees C or on rainy
; If the weather is wet or poorly ventilated, the coating film is slower and faster
3. Construction to ensure a good construction hygiene environment, product mixing should be completed within 2 hours
4. Waterproof film construction can not be immediately pasted decorative layer, the waterproof film must be fully cured before construction. The drying time is 2 days, and the drying time in wet environment should be
5. The construction of the protective layer is constructed after the coating film is completely dry and the acceptance is qualified.
storage and packaging:
1. This product is easy to store at room temperature not less than
5 degrees C; The powder should be stored flat in the dry
3. Transport should prevent rain, exposure,
avoided; Avoid squeeze
collisions; The shelf life of the product is: 12
months; Product specifications: 20Kg/barrel, 10Kg/barrel, 5Kg/barrel.