-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Paint Network
News: In Liuyang City, Longvo Town forward village, there is a production of wooden stairs handrails of wood products processing plant, recently villagers reflected that the factory drifted out of the
paint
taste too heavy, so that they do not want to open the window. Especially those who have children at home, worry about coughing when they stay at home, preferring to send them to relatives' homes.
"the paint smells so heavy that you have to close the window to sleep. On the afternoon of May 12, 71-year-old villager Zhang Dizi told reporters that the woodwork factory was built in 2005, mainly producing wooden stair handrails, when the scale is relatively small, the smell of paint is not so large. But after several expansions, the paint smelled stronger and stronger, and the surrounding villagers were worried about the health effects.
"Sometimes when you paint, it's foggy outside. Villager Zhang Jinbao said they could not open the windows as soon as the paint line started. Zhang said the nearest resident's home is only 30 meters away, and children are afraid to put it at home. Villager Zhang Shifu said that his grandson is less than a year old, basically living in his grandmother's house, "at home will cough, the smell is too pungent." "
are even more worrying to the villagers, the nearby tea leaves are knotted, fearing that it will affect water and soil, they are afraid to grow vegetables in the surrounding area.
reporter then came to the wood processing plant, found that the factory paint production line has not started, the power switch box is attached to the Liuyang City Environmental Protection Bureau seal, the payment time is April 30. The head of Liuyang Regal Wood Co., Ltd., where the factory is located, said they had indeed received complaints from villagers and had made corresponding corrections.
" paint does smell a little bit. Zhang said they have shut down the paint production workshop in accordance with the requirements of the environmental protection department, and are in accordance with the provisions of the EIA procedures. We are considering re-siteing and preparing to move the paint shop. Zhang said. Reporters also noted that the factory outside the basic smell of paint, only into the factory can smell. Regarding the groundwater pollution and other problems reflected by the villagers, Zhang said that if the villagers are not assured, they can test the water quality and air, and if they determine that there is a problem, they will be held responsible.
the afternoon of May 12, Longvo Town Environmental Protection Station staff came to the scene, environmental protection station director LuoLi said that the plant was built in 2005, due to historical reasons did not go through the EIA procedures. After the implementation of the new environmental protection law in January this year, enterprises are required to complete the EIA procedures in order to start work, the plant has been required to go through the relevant EIA procedures.
" contaminated processes have been shut down. "Rory introduced, the factory rectification and acceptance of qualified, and then through the villagers' representatives to negotiate consent before the start of work.