echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > Maintenance and maintenance methods of screw conveyors

    Maintenance and maintenance methods of screw conveyors

    • Last Update: 2020-05-13
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    in order to ensure better use of screw conveyors, as far as possible to extend the service life, for you to create greater economic benefits, please pay attention to the weekly inspection, motor bearing position once a month oil supply, oil supply 3 mlii, when the motor is burned out or there are other problems that need to be replaced:(1) loosen the motor bolts to remove(2) with the M16 bolts on top of the input flange wire empty, tightly tightened, so that the motor and the gearbox separatethree, the installation of the motor hanging up parallel with the spiral conveying angle, coated with lithium-based fat, good flat key, slowly shake the motor, the motor installed in the end, with bolts to secure the motorIV, in order to improve the service life and performance of the gearbox, the first use of two months to replace gear oil, the later use every 6 months need to replace gear oil (please choose L-CKC220 industrial closed gear oil)five, the gearbox output of the leakage of ash, because of the output cover seal damage, should immediately solve the problem, to avoid because of ash leakage caused by the output shaft wearsix, when replacing the end cover or when the gearbox needs to be replaced:to remove the motor and gearbox at the same time, before the removal of the motor and the gearbox, first open the observation port, the spiral inner tube fixed, and then open the gearbox and the outer tube connection bolts, so that the gearbox and the screw separate, the output seal in the output cover, the output end cap and the output flange connected, the end cap The fixed bolt is removed, then the end cap is removed, the new end cover is installed after tightening the bolt, the motor and the gearbox are hoisted to a position parallel to the angle of the spiral, the motor and the gearbox are installed on the spiral, in the process of installation, turning the fan blades of the motor, so that the output shaft of the gearbox and the daisy sleeve key on the inner tube is installed, the observation port will be installed on the boot can be used
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.