echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > Maintenance measures of xenon lamp weather resistance test chamber

    Maintenance measures of xenon lamp weather resistance test chamber

    • Last Update: 2022-08-20
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    The xenon lamp weather resistance test chamber uses a xenon lamp to simulate the effect of sunlight, and uses condensed moisture to simulate rain and dew.
    The material to be tested is placed in a cycle program of alternating light and moisture at a certain temperature for testing, with a period of days or weeks.
    Hazards that occur outdoors for months or even years can be reproduced, and artificial accelerated aging test data can help select new materials, modify existing materials, and evaluate how changes in formulations affect product durability
    .

     Maintenance measures of the xenon lamp weather resistance test chamber: 1.
    The wet bulb gauze should be replaced regularly: when the surface of the test cloth is not clean or hard, the test cloth must be replaced
    .

    The test cloth should be replaced about once every three months.
    The temperature measuring body should be wiped with a clean cloth when replacing, and the hands should be cleaned before replacing the new test cloth
    .

    2.
    Check and adjust the water level of the wet bulb: the level of the water tank should not be too high, so that the water overflows.
    If the water tank is too low, the wet bulb test cloth will not absorb water normally, which will affect the accuracy of the wet bulb.
    The water level should be kept about six points full.
    That's it
    .

    The adjustment of the water level of the water tank can adjust the height of the water tank
    .

    3.
    Before the test, check whether the test cloth is hard or dirty, otherwise it needs to be replaced; 4.
    Check the water level of the test cloth every three months; 5.
    The power distribution room is maintained every six months; 6.
    The body is every six months Regular maintenance
    .
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.