    5.
    4.
    3 Kubota flat membrane operation

    ①The blower of the liquid-in-liquid membrane is generally designed according to 7L/min per membrane (1600mm×500mm), and the air volume of the blower is generally not adjusted during operation
    .


    The blower runs continuously for 24 hours


    ② The size of the suction pump is designed according to the number of membrane modules
    .


    During operation, in order to remove pollution, a method of opening for 9 minutes and stopping for 1 minute is adopted, which is generally controlled by a computer automatically


    ③The flow rate of the circulating sludge pump is generally selected to be 2 to 3 times of the water intake, and it runs continuously
    .

    ④The remaining sludge pump runs regularly according to the reading of the MLSS meter in the pool
    .


    The concentration of MLSS in the pool is generally controlled at 15000~20000mg/L


    ⑤ A pressure gauge is installed in the inlet pipe of the suction pump, and the degree of membrane fouling can be understood through the reading of the pressure gauge
    .


    During the initial operation, the pressure loss is very small.


    5.
    4.
    4 Cleaning of Kubota flat membrane

    Use sodium hypochlorite (mass fraction 0.
    5%) and oxalic acid (mass fraction 0.
    5%) for chemical cleaning.
    The cleaning process diagram is shown in Figure 5-13
    .


    The cleaning steps are as follows:


    Figure 5-13 Cleaning of Kubota flat membrane

    ① Turn off the suction pump and blower first;

    ②Slowly inject the liquid medicine into the membrane module through the medicine inlet installed on the upper part of the membrane module;

    ③Soak for about 1.


    5h and then use a suction pump to discharge the liquid medicine;

    ④Inject another medicine and repeat the previous steps;

    ⑤The whole cleaning process lasts for 4~5h;

    ⑥ Recover for 6-12 hours and start filtering.
    Note that the initial flux should drop below 50% of normal operation and then gradually increase until it is completely normal
    .

    5.
    4.
    5 Operational efficiency of Porlock wastewater treatment plant

    The effluent BOD of this process is less than 5mg/L, which is not affected by the influent BOD
    .


    The average turbidity is 0.


    Table 5-13 Operational efficiency of Porlock wastewater treatment plant


     

     

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.