-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
The “China Biomass Power Generation Industry Development Report” recently released by the Biomass Energy Branch of the China Industry Development Promotion Association shows that by the end of 2020, my country’s cumulative grid-connected biomass power generation capacity reached 29.
52 million kilowatts, ranking first in the world for the third consecutive year.
.
The "Report" pointed out that in 2020, my country's biomass power generation will add 5.
43 million kilowatts of installed capacity, with an annual power generation of 132.
6 billion kilowatt-hours and an annual on-grid electricity of 112.
In 2020, the top five provinces with cumulative installed capacity of biomass power generation in my country are Shandong, Guangdong, Jiangsu, Zhejiang and Anhui, with installed capacity of 3.
655 million kilowatts, 2.
In terms of categories, in 2020, my country's new installed capacity of waste incineration power generation will be 3.
11 million kilowatts, and the cumulative installed capacity will reach 15.
The "Report" particularly emphasizes that the current development of my country’s biomass power generation industry is still facing huge challenges, waste incineration power generation still has regional development imbalances, and the problem of avoidance caused by environmental protection emissions is still prominent.
In the context of low waste treatment fees, the industry is facing great challenges.
The "Report" predicts that during the "14th Five-Year Plan" period, my country's new agricultural and forestry biomass power generation capacity will reach 3.
7 million kilowatts, and the total installed capacity will reach 17 million kilowatts; the new capacity of waste incineration power generation will reach 6.
Transfer from: China Energy News
[Copyright and Disclaimer] All copyrighted works belonging to this website must be authorized when reprinting and indicate the source "China Industrial Economic Information Network".
Offenders of this website will reserve the right to pursue relevant legal responsibilities.
Further reading