Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
First, the main material and auxiliary materials
1, the main material: natural stone powder coating stone powder distribution special substrate
2, auxiliary materials: sand cloth, textured paper, anti-embroidery paint, aluminum alloy by foot, right angle ruler, ink, white latex, glass Fiber mesh cloth, such as
3, application tools: flat coating, decorative wipes, steel scraper shape, brush, roller barrel, mold, etc.
2, transport conditions and storage
1, storage and transportation according to non-dangerous goods.
2, material storage should ensure ventilation, drying, to prevent sun exposure, the temperature of 5 degrees C-35 degrees C; The package shall not be dumped or inverted; The number of heap layers please note the package identification.
III, process practices
(i) concrete wall practices:
layering practice examples
1, apply 0.5-1.0 thick natural stone powder coating surface layer
2, apply 0.8-1.2 thick natural stone powder coating to find flat
3, apply 0.8-1.2 thick natural Stone powder paint to find flat
4, brushing the back cover liquid back
5, 5-10 thick special substrate repair wall
detailed description:
1, grass treatment:
surface sand, splashes and mortar traces, such as wire brush, blade, , broom clean
China
.
oil is washed with 10% hydroxide solution and then rinsed with water.
surface pan-alkali, with 3% herbal acid aqueous solution for mediuming, and then rinsed with clean water.
. Surface mold, with 5% bleached powder water solution for balance, stay for a few minutes to rinse clean (Note: the operation should wear a glue sleeve)
nail holes, rebar head brush anti-rust paint, cracks with expansion seam gypsum to level, paste perforated ppylographic paper tape and really cool cloth.
2, find flat: apply the substrate to find flat, the use of special substrate and liquid according to the ratio of 2:1 to reconcile into a uniform slurry, scraping requires horizontal vertical, divided into 2-3 layers of coating, the total thickness of about 5-10mm.
3, brush anti-alkali primer: the primer applied optional spray and roll coating, no special wall for the choice.
4, looking for Yin, yang angle and substrate repair: Yin angle with right angle ruler and bullet line method. The method of using aluminum alloy to lean on the ruler and the right angle ruler for the yang angle.
5, flat scraping stone powder paint three times:
(1) the first time stone powder paint, powder and liquid ratio of 2:1, material dosing (depending on the base conditions) is about 1.0kg/m2. Requires basic no scratches, basic leveling, routine application or scraping (Note: not less than 2 hours per interval, whichever is dry)
(2) second stone powder paint, material ratio with the first time, material dosage of about 1.0 kg/m2, requires no scratches, smooth surface, routine application or scratching (Note: Each interval is not less than 2 hours, to dry permeable)
(3) the third time stone powder paint, the material ratio with the first time, the material dosing is about 0.5-1.0 kg / square meters, require scraping the third time before sandpaper polishing flat, other construction has been basically completed, so as to avoid dust and other pollution. Two people are required to cooperate with the construction. One scrape, one after the flat, closed. After drying, the effect surface is flat, smooth and feels good. Clean the corner area and do a good job of protecting the finished product.
(ii) Hollow block wall practice
scale practice example
1, apply 0.5-1.0 thick natural stone powder coating surface layer
2, apply 0.8-1.2 thick natural stone powder coating to level
3, smudge 0.8 -1.2 thick natural stone powder paint to find flat
4, brush the back cover liquid back
5, thick special substrate to find flat
6, paste a layer of glass fiber mesh cloth on the masonry wall
detailed description:
1, grass-roots treatment:
futon with broom clean.
nail holes, rebar head brush rust-proof paint, cracks with expansion seam gypsum to level, paste perforated verse paper tape and indeed cool cloth.
. Brush high-quality white latex on the wall of the block with rollers
. . on the surface of the glue full of sticky glass fiber mesh cloth, with a wipe to flatten
2, find flat: apply the base material to find flat, the use of special substrates and liquid according to the ratio of 2:1 to mix into a uniform slurry, scraping requires horizontal vertical, divided into 2 layers of coating, the total thickness of about 5mm.
3, brush anti-alkali primer: the primer applied optional spray and roll coating, no special wall for the choice.
4, find Yin, Yang angle: Yin angle with right angle ruler and bullet line method. The method of using aluminum alloy to lean on the ruler and the right angle ruler for the yang angle.
5, flat scraping stone powder paint three times:
(1) the first time stone powder paint, powder and liquid ratio of 2:1, material dosing (depending on the base conditions) is about 1.0kg/m2. Requires basic no scratches, basic leveling, routine application or scraping (Note: not less than 2 hours per interval, whichever is dry)
(2) second stone powder paint, material ratio with the first time, material dosage of about 1.0 kg/m2, requires no scratches, smooth surface, routine application or scratching (Note: Each interval is not less than 2 hours, to dry permeable)
(3) the third time stone powder paint, the material ratio with the first time, the material dosing is about 0.5-1.0 kg / square meters, require scraping the third time before sandpaper polishing flat, other construction has been basically completed, so as to avoid dust and other pollution. Two people are required to cooperate with the construction. One scrape, one after the flat, closed. After drying, the effect surface is flat, smooth and feels good. Clean the corner area and do a good job of protecting the finished product.
(iii) Cement mortar platstone wall practice
rated practice example
1, apply 0.5-1.0 thick natural stone powder coating surface layer
2, apply 0.8-1.2 thick natural stone powder coating to level
3, apply 0.8-1.2 thick natural stone powder paint to find flat
4, brush the back cover liquid back
5, yin and yang corner repair
details:
1, grass-roots treatment: futon with broom removal clean.
2, yin, yang angle dressing: the use of special substrate and high-strength gypsum mixed powder for yin and yang angle repair, yin angle with right angle ruler and bullet line method, yang angle with aluminum alloy by ruler and right angle ruler method.
3, brush anti-alkali primer: the primer applied optional spray and roll coating, no special wall for the choice.
4, flat scraping stone powder paint three times:
(1) the first time stone powder paint, powder and liquid ratio of 2:1, material dosing (depending on the base conditions) about 1.0kg/m2. Requires basic no scratches, basic leveling, routine application or scraping (Note: not less than 2 hours per interval, whichever is dry)
(2) second stone powder paint, material ratio with the first time, material dosage of about 1.0 kg/m2, requires no scratches, smooth surface, routine application or scratching (Note: Each interval is not less than 2 hours, to dry permeable)
(3) the third time stone powder paint, the material ratio with the first time, the material dosing is about 0.5-1.0 kg / square meters, require scraping the third time before sandpaper polishing flat, other construction has been basically completed, so as to avoid dust and other pollution. Two people are required to cooperate with the construction. One scrape, one after the flat, closed. After drying, the effect surface is flat, smooth and feels good. Clean the corner area and do a good job of protecting the finished product.
, quality standards:
1, to ensure the project: the materials used varieties, quality, color are in line with the design requirements, in strict accordance with the product portfolio supporting the use.
2, basic projects: the construction surface color is consistent, do not show connectors, no leakage brush, bottom defects.
1, before the construction will be painted parts to block, to prevent sticky.
2, remove and turn over the shelf, strictly prevent collision and pollution coating.
3, after the tool is used, should be cleaned in time to ensure that the next time continue to use.
4, the remaining materials are strictly prohibited to dump at will.
dust when sanding with 5 and sandpaper.
。