echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Chemical Technology > Qingdao Unicom pipeline exchange platform escorts long-distance optical cable safety benefits are obvious

    Qingdao Unicom pipeline exchange platform escorts long-distance optical cable safety benefits are obvious

    • Last Update: 2022-11-23
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Qingdao Unicom pipeline exchange platform escorts long-distance optical cable safety benefits are obvious
    .
    At 8:11 a.
    m.
    on February 15, engineers of Shandong Qingdao High-tech Park Thermal Power Company released information on the intersection of Shenzhen Road and Yinchuan Road in Qingdao City that the heating pipeline leakage was found at the intersection of Shenzhen Road and Yinchuan Road in Qingdao City, and was preparing for emergency repair.

    Since then, Qingdao Unicom has launched an emergency operation
    of line care.

    At 8:12, the director of Qingdao Unicom Line Maintenance Center replied to the other party that there may be a national defense optical cable pipeline on the site, and asked the other party to provide a contact number, and immediately arrange maintenance personnel to go to the emergency repair site to confirm
    .
    At 8:45, the center's maintenance personnel arrived at the thermoelectric emergency repair site
    in time.
    According to the location of the leakage point on the site, open the communication manhole to see, judge the distance between the two points, and inform that 2 international submarine cables and 2 domestic long-distance trunk optical cables
    are involved.
    Thermoelectric emergency repair personnel are well aware of the importance of national defense optical cables, and dare not dig
    deeper.
    After the maintenance personnel commanded the excavator driver on site, after 2 hours of excavation construction, the leakage point was found, the communication pipeline was successfully avoided, and the heating pipeline was successfully rushed
    .
    The engineers of Hi-Tech Park Thermal Power Company expressed their gratitude in the WeChat group and praised
    Unicom for establishing a pipeline property rights exchange platform to facilitate the communication of pipelines and improve the speed of emergency repair.

    It is understood that the WeChat group of the pipeline exchange platform was created by Qingdao Unicom Line Maintenance Center in June 2015, with 164 online people and more than
    20 pipeline property rights such as natural gas, tap water, municipal, intelligent transportation, and electricity.
    Since its establishment, more than 300 hidden danger information of the line have been released, and more than 105 on-site disclosures have been made to avoid multiple line failures
    caused by pipeline construction.

    Qingdao Unicom pipeline exchange platform escorts long-distance optical cable safety benefits are obvious
    .
    At 8:11 a.
    m.
    on February 15, engineers of Shandong Qingdao High-tech Park Thermal Power Company released information on the intersection of Shenzhen Road and Yinchuan Road in Qingdao City that the heating pipeline leakage was found at the intersection of Shenzhen Road and Yinchuan Road in Qingdao City, and was preparing for emergency repair.

    Since then, Qingdao Unicom has launched an emergency operation
    of line care.

    optical fiber cable

    At 8:12, the director of Qingdao Unicom Line Maintenance Center replied to the other party that there may be a national defense optical cable pipeline on the site, and asked the other party to provide a contact number, and immediately arrange maintenance personnel to go to the emergency repair site to confirm
    .
    At 8:45, the center's maintenance personnel arrived at the thermoelectric emergency repair site
    in time.
    According to the location of the leakage point on the site, open the communication manhole to see, judge the distance between the two points, and inform that 2 international submarine cables and 2 domestic long-distance trunk optical cables
    are involved.
    Thermoelectric emergency repair personnel are well aware of the importance of national defense optical cables, and dare not dig
    deeper.
    After the maintenance personnel commanded the excavator driver on site, after 2 hours of excavation construction, the leakage point was found, the communication pipeline was successfully avoided, and the heating pipeline was successfully rushed
    .
    The engineers of Hi-Tech Park Thermal Power Company expressed their gratitude in the WeChat group and praised
    Unicom for establishing a pipeline property rights exchange platform to facilitate the communication of pipelines and improve the speed of emergency repair.

    It is understood that the WeChat group of the pipeline exchange platform was created by Qingdao Unicom Line Maintenance Center in June 2015, with 164 online people and more than
    20 pipeline property rights such as natural gas, tap water, municipal, intelligent transportation, and electricity.
    Since its establishment, more than 300 hidden danger information of the line have been released, and more than 105 on-site disclosures have been made to avoid multiple line failures
    caused by pipeline construction.

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.