echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Set Tai "blue" in-depth first-line, for Sinopec commercial storage project In Xinjiang storage vehicle main body to support the completion.

    Set Tai "blue" in-depth first-line, for Sinopec commercial storage project In Xinjiang storage vehicle main body to support the completion.

    • Last Update: 2020-10-20
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    Recently, Sinopec 12 million commercial storage project, the first 100,000 li crude oil tank in Xinjiang, the first to complete the main construction.
    the project should be in response to the needs of the national crude oil reserves, emergency start, especially in Xinjiang, 800,000 li and Tianjin 2 million project needs to be delivered on December 30 this year.
    construction period is very tight, with "construction mania" of China's construction of the iron army, to take the side design side construction mode, careful deployment, strict control, day and night overtime operations.
    xinjiang reservoir car victory oil construction contract (four seats 100,000) in just over three months to complete the installation of most of the main tank, the speed is amazing.
    first time, the commercial storage project group in the construction of super-large crude oil tanks mainly used water-based anti-corrosion paint design.
    as Sinopec's main supplier of water-resistant anti-corrosion paint, set Thai shares to take on the heavy responsibility, to overcome road remote, heat, epidemic and other difficulties, to ensure the supply of insurance services.
    in high-intensity, ultra-conventional spraying construction work, water-resistant anti-corrosion paint safety and environmental protection performance and construction efficiency withstood the test and witness, by all parties.
    Not only for the under intense construction and preparation of the day smelting, Maoming, long refining, low smelting, fu smelting project water-based paint product use and service guarantee to establish confidence, but also for the petrochemical system to implement "safe emission reduction, green environmental protection" made a demonstration action.
    the first 100,000-square-meter crude oil tank main body completed set Thai shares technical personnel with the total package, supervision, construction units to check the steel plate spraying quality construction of Sinopec commercial storage project group storage project vehicle crude oil tank.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.