-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Recently, Sinopec 12 million commercial storage project, the first 100,000 li crude oil tank in Xinjiang, the first to complete the main construction.
the project should be in response to the needs of the national crude oil reserves, emergency start, especially in Xinjiang, 800,000 li and Tianjin 2 million project needs to be delivered on December 30 this year.
construction period is very tight, with "construction mania" of China's construction of the iron army, to take the side design side construction mode, careful deployment, strict control, day and night overtime operations.
xinjiang reservoir car victory oil construction contract (four seats 100,000) in just over three months to complete the installation of most of the main tank, the speed is amazing.
first time, the commercial storage project group in the construction of super-large crude oil tanks mainly used water-based anti-corrosion paint design.
as Sinopec's main supplier of water-resistant anti-corrosion paint, set Thai shares to take on the heavy responsibility, to overcome road remote, heat, epidemic and other difficulties, to ensure the supply of insurance services.
in high-intensity, ultra-conventional spraying construction work, water-resistant anti-corrosion paint safety and environmental protection performance and construction efficiency withstood the test and witness, by all parties.
Not only for the under intense construction and preparation of the day smelting, Maoming, long refining, low smelting, fu smelting project water-based paint product use and service guarantee to establish confidence, but also for the petrochemical system to implement "safe emission reduction, green environmental protection" made a demonstration action.
the first 100,000-square-meter crude oil tank main body completed set Thai shares technical personnel with the total package, supervision, construction units to check the steel plate spraying quality construction of Sinopec commercial storage project group storage project vehicle crude oil tank.