echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Feed Industry News > Shandong: Enterprises with annual waste production of more than 5000 tons and industrial parks of more than 10,000 tons should be equipped with treatment devices.

    Shandong: Enterprises with annual waste production of more than 5000 tons and industrial parks of more than 10,000 tons should be equipped with treatment devices.

    • Last Update: 2020-08-02
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    , Shandong issued an opinion on strengthening the construction and management of hazardous waste disposal facilities. Details are as follows:
    cGq cGqmunicipal ecological environment bureau:
    cGq"13th Five-Year Plan", the province's hazardous waste disposal facilities have made significant progress, disposal capacity has been greatly improved, but there are some projects in the early demonstration is not sufficient, with the hazardous waste category and production volume mismatch and other issues. In order to effectively fight the battle of hazardous waste management, and better guide the construction and management of hazardous waste disposal facilities in the province, the following opinions are put forward in combination with the actual situation in our province.
    cGq .First, to comprehensively upgrade the hazardous waste disposal capacity
    cGq(i) adjust and optimize the planning of hazardous waste disposal facilities.
    cGq .Municipalities should follow the idea of "self-elimination-oriented, regional coordination as a supplement", based on the current, taking into account the long-term, the centralized disposal facilities of hazardous waste into the local public infrastructure planning layout, overall construction, speed up the completion of the disposal facilities to meet the needs of regional industrial development system, for hazardous waste disposal to provide "bottom-based" protection. To combine the actual, the deadline to complete the construction of hazardous waste disposal facilities, to the end of the "13th Five-Year Plan", the basic realization of the province's hazardous waste disposal capacity and hazardous waste generation capacity, the type of production match.
    cGq .The construction plan for the construction of hazardous waste disposal facilities in Shandong Province (Luhuan Letter (2017) No. 452) has been completed within the deadline; Municipal Ecological Environment Bureaus shall regularly issue investment-oriented announcements to the public about the gaps in the disposal capacity of all types of hazardous waste in the cities, and guide social capital to invest in hazardous waste disposal projects. We should establish a regular dispatch notification system, comprehensive use of communication, interviews and other means, compaction work responsibilities.
    cGq .(2) To speed up the construction of centralized disposal facilities for hazardous waste.
    cGq .Municipalities should speed up the construction of a number of hazardous waste incineration, landfill centralized disposal and the disposal facilities of prominent hazardous waste utilization in order to alleviate the pressure on hazardous waste disposal in key areas in view of the current gap in hazardous waste generation and disposal capacity.
    cGq .Municipalities should build centralized incineration facilities and landfills for hazardous waste to meet actual disposal needs. To adopt the annual production of hazardous waste by incineration and disposal of more than 5000 tons of enterprises and more than 10,000 tons of industrial parks (chemical parks, industrial concentration areas, etc.), should be accompanied by the construction of centralized incineration facilities to achieve near safety disposal; Areas that have not been completed for operation or have a serious shortage of disposal capacity shall be resolved by the municipalities of the district, otherwise the construction of industrial projects producing hazardous waste shall be prohibited.
    cGq .  Efforts have been made to strengthen the safe disposal of prominent categories of hazardous waste. Focusing on hazardous waste slag with large stocks and difficulty in disposal, we should focus on the disposal capacity of supporting construction and utilization. Increase the use of cyanide tailings, waste salt technology research and development, effectively remove toxic and harmful substances, improve the value of comprehensive utilization. Yantai City, where the amount of cyanide tailings is concentrated, should realize the balance between the amount of cyanide tailings and the utilization of disposal capacity, to the end of the "13th Five-Year Plan", so that the disposal of cyanide tailings "does not owe new accounts, more old accounts".
    cGq .  Weifang, Binzhou, Linyi, Texas and other chemical waste salt hazardous waste production volume of the city, should be combined with local reality, choose advanced and applicable technology, organize the construction of chemical waste salt hazardous waste waste disposal projects. We will increase the demonstration and promotion of industrial sludge reduction technology, and accelerate the capacity-building of specialized and standardized utilization and disposal. Encourage the development and application of fly ash resource utilization technology and speed up the construction of fly ash utilization disposal projects. Efforts should be made to optimize and adjust the industrial structure and reduce the amount of low-value, difficult-to-treat hazardous waste such as waste salt and industrial sludge. The relevant production facilities of enterprises that produce large amounts of hazardous waste and cannot carry out disposal shall be subject to production restrictions, production stoppages and closures in accordance with the law.
    cGq .  (iii) Continuously upgrade the scale and management of facilities.
    cGq .  Strict implementation of hazardous waste utilization and disposal standards and norms, the new (reform, expansion) of centralized incineration facilities, the total design and treatment scale of no less than 10,000 tons / year. Encourage the diversified development of disposal technologies, giving priority to the use of rotary kiln incinerators or other incinerators with more mature, high level of automation and more stable operation of hazardous waste types.
    cGq .  Strengthen technical training and exchange, support the introduction of professional operation management team, improve the level of operation and management of facilities. We will encourage the adoption of state-owned participation, diversified investment and market-oriented operation of the construction and operation model, the introduction of domestic and foreign disposal technology advanced, high level of operation and management of large enterprises and leading enterprises in the industry, the construction of a number of high-standard, large-scale, first-class standard disposal facilities, mergers and reorganization, effective integration of existing resources.
    cGq .  Second, strengthen the environmental management of hazardous waste disposal facilities
    cGq (iv) to comprehensively strengthen the construction of the regulatory system.
    cGq .  Establish and improve the supervision system covering the whole process of the generation, storage, transfer and disposal of hazardous waste, and improve the supervision mechanism of the units and business units for the generation and operation of hazardous waste. Give full play to the decisive role of the market in the allocation of resources for disposal, comprehensively and timely open the province's hazardous waste utilization disposal units of the licensing type, scale, etc. , waste production units independently choose to use disposal units, establish a competitive market, eliminate price monopoly, through competition to reduce disposal costs. In addition to hazardous waste, which can be used as a comprehensive use of raw materials, in principle, hazardous waste from outside the province is not accepted for incineration or landfill disposal in our province.
    cGq .  It is strictly forbidden to set up artificial administrative barriers to ensure legal transfer and fair competition across regions. Strengthen the provincial-level coordination of disposal capacity, and encourage all localities to establish mutual assistance and sharing mechanisms for the sharing of disposal capacity resources and emergency disposal mechanisms. Commission the delegation of hazardous waste business license approval, strengthen after-the-fact supervision, improve the efficiency of administrative examination and approval.
    cGq .  (v) To carry out a pilot project on the collection and collection of hazardous waste.
    cGq .  We will further promote the pilot work of centralized collection and storage of hazardous waste parks and the application of "point-to-point" applications, and encourage business units to build hazardous waste collection points by themselves or in cooperation with third parties to solve problems such as the failure to transfer small quantities of hazardous waste in time, difficulty in disposal, high cost and the use of hazardous waste degradation gradients.
    cGq .  Explore the implementation of the producer responsibility extension system, and promote conditional production enterprises rely on sales outlets to recycle the hazardous waste generated by the use of their products. To scientific research institutions, testing and monitoring institutions and other units as the focus, explore the implementation of laboratory waste collection and disposal pilot. Focusing on motor vehicle sales and maintenance industries, we will carry out a pilot project for the collection system of waste mineral oil and waste lead-acid batteries.
    cGq .  Third, strengthen the leadership of the organization
    cGq municipal ecological environment bureaus should put the construction and management of hazardous waste disposal facilities into the important agenda, and the target of capacity-building for hazardous waste disposal to specific projects.
    cGq .  Establish a regular scheduling system, dynamic assessment and adjustment mechanism, and accelerate the formation of the jurisdiction's needs and capacity matching, ordinary and emergency balance of hazardous waste disposal system. We will strengthen organizational coordination, refine policy measures and vigorously promote the construction of hazardous waste disposal facilities.
    cGq .  Step by step to implement the objective responsibility for the construction of hazardous waste disposal facilities, and urge the relevant units to speed up the construction of projects to ensure the quality and progress of construction. Adhering to the principle of government guidance and market-oriented, lacking investment intention in social capital, difficult to solve hazardous waste disposal projects of source of funds through market mechanisms, and actively striving for financial support at all levels through "rewarding" and other means.
    cGq
    , Shandong issued an opinion on strengthening the construction and management of hazardous waste disposal facilities. Details are as follows:
    cGq cGq municipal ecological environment bureau:
    cGq "13th Five-Year Plan", the province's hazardous waste disposal facilities have made significant progress, disposal capacity has been greatly improved, but there are some projects in the early demonstration is not sufficient, with the hazardous waste category and production volume mismatch and other issues. In order to effectively fight the battle of hazardous waste management, and better guide the construction and management of hazardous waste disposal facilities in the province, the following opinions are put forward in combination with the actual situation in our province.
    cGq .  First, to comprehensively upgrade the hazardous waste disposal capacity
    cGq (i) adjust and optimize the planning of hazardous waste disposal facilities.
    cGq .  Municipalities should follow the idea of "self-elimination-oriented, regional coordination as a supplement", based on the current, taking into account the long-term, the centralized disposal facilities of hazardous waste into the local public infrastructure planning layout, overall construction, speed up the completion of the disposal facilities to meet the needs of regional industrial development system, for hazardous waste disposal to provide "bottom-based" protection. To combine the actual, the deadline to complete the construction of hazardous waste disposal facilities, to the end of the "13th Five-Year Plan", the basic realization of the province's hazardous waste disposal capacity and hazardous waste generation capacity, the type of production match.
    cGq .  The construction plan for the construction of hazardous waste disposal facilities in Shandong Province (Luhuan Letter (2017) No. 452) has been completed within the deadline; Municipal Ecological Environment Bureaus shall regularly issue investment-oriented announcements to the public about the gaps in the disposal capacity of all types of hazardous waste in the cities, and guide social capital to invest in hazardous waste disposal projects. We should establish a regular dispatch notification system, comprehensive use of communication, interviews and other means, compaction work responsibilities.
    cGq .  (2) To speed up the construction of centralized disposal facilities for hazardous waste.
    cGq .  Municipalities should speed up the construction of a number of hazardous waste incineration, landfill centralized disposal and the disposal facilities of prominent hazardous waste utilization in order to alleviate the pressure on hazardous waste disposal in key areas in view of the current gap in hazardous waste generation and disposal capacity.
    cGq .  Municipalities should build centralized incineration facilities and landfills for hazardous waste to meet actual disposal needs. To adopt the annual production of hazardous waste by incineration and disposal of more than 5000 tons of enterprises and more than 10,000 tons of industrial parks (chemical parks, industrial concentration areas, etc.), should be accompanied by the construction of centralized incineration facilities to achieve near safety disposal; Areas that have not been completed for operation or have a serious shortage of disposal capacity shall be resolved by the municipalities of the district, otherwise the construction of industrial projects producing hazardous waste shall be prohibited.
    cGq .  Efforts have been made to strengthen the safe disposal of prominent categories of hazardous waste. Focusing on hazardous waste slag with large stocks and difficulty in disposal, we should focus on the disposal capacity of supporting construction and utilization. Increase the use of cyanide tailings, waste salt technology research and development, effectively remove toxic and harmful substances, improve the value of comprehensive utilization. Yantai City, where the amount of cyanide tailings is concentrated, should realize the balance between the amount of cyanide tailings and the utilization of disposal capacity, to the end of the "13th Five-Year Plan", so that the disposal of cyanide tailings "does not owe new accounts, more old accounts".
    cGq .  Weifang, Binzhou, Linyi, Texas and other chemical waste salt hazardous waste production volume of the city, should be combined with local reality, choose advanced and applicable technology, organize the construction of chemical waste salt hazardous waste waste disposal projects. We will increase the demonstration and promotion of industrial sludge reduction technology, and accelerate the capacity-building of specialized and standardized utilization and disposal. Encourage the development and application of fly ash resource utilization technology and speed up the construction of fly ash utilization disposal projects. Efforts should be made to optimize and adjust the industrial structure and reduce the amount of low-value, difficult-to-treat hazardous waste such as waste salt and industrial sludge. The relevant production facilities of enterprises that produce large amounts of hazardous waste and cannot carry out disposal shall be subject to production restrictions, production stoppages and closures in accordance with the law.
    cGq .  (iii) Continuously upgrade the scale and management of facilities.
    cGq .  Strict implementation of hazardous waste utilization and disposal standards and norms, the new (reform, expansion) of centralized incineration facilities, the total design and treatment scale of no less than 10,000 tons / year. Encourage the diversified development of disposal technologies, giving priority to the use of rotary kiln incinerators or other incinerators with more mature, high level of automation and more stable operation of hazardous waste types.
    cGq .  Strengthen technical training and exchange, support the introduction of professional operation management team, improve the level of operation and management of facilities. We will encourage the adoption of state-owned participation, diversified investment and market-oriented operation of the construction and operation model, the introduction of domestic and foreign disposal technology advanced, high level of operation and management of large enterprises and leading enterprises in the industry, the construction of a number of high-standard, large-scale, first-class standard disposal facilities, mergers and reorganization, effective integration of existing resources.
    cGq .  Second, strengthen the environmental management of hazardous waste disposal facilities
    cGq (iv) to comprehensively strengthen the construction of the regulatory system.
    cGq .  Establish and improve the supervision system covering the whole process of the generation, storage, transfer and disposal of hazardous waste, and improve the supervision mechanism of the units and business units for the generation and operation of hazardous waste. Give full play to the decisive role of the market in the allocation of resources for disposal, and make full and timely disclosure of the permitted types and scale of hazardous waste disposal units throughout the province.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.