-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
A few days ago, the Shandong Provincial Development and Reform Commission and the Provincial Coal Industry Bureau jointly issued a document stating that the province's coal output this year will be controlled within
146 million tons.
It is understood that Shandong Province currently has 174 coal production mines, with an approved production capacity of 172 million tons per year
.
Shandong Province will be guided by the control objectives, reasonably formulate the implementation plan for production control, and decompose and implement the control objectives layer by layer to ensure the balance
of production and sales.
Focus on restricting coal mines that do not perform coal mining subsidence and environmental governance obligations, as well as coal mines with
poor safety and security conditions, complex geological conditions, coal quality that does not meet commodity coal quality standards and serious resource compaction.
For coal mines with major safety hazards, all production will be suspended for rectification; For coal mines with serious losses and high coal stocks, planned production shutdown and maintenance
are organized.
For coal mines whose coal output has exceeded 50% of the announced production capacity in the first half of the year, production will be reduced and limited in the second half of the year to ensure that the annual output does not exceed the expected target
.
At the same time, Shandong Province actively and steadily promoted the closure and withdrawal
of small coal mines.
For small coal mines that have been included in the closure plan, it is strictly necessary to prevent illegal and illegal organization of production
.
Strict technical reform procedures and standards for small coal mines that are determined to be retained, strictly prevent evading closure in the name of transformation, and strictly prevent unauthorized organization of production
in the transformation area.
Coal mines that fail to complete the elimination task within the time limit shall be requested to the local government to be closed; Coal mines with major or above liability accidents shall be closed
immediately.
Shandong Province's coal production is planned to be 2 million tons
less this year than last year.
A few days ago, the Shandong Provincial Development and Reform Commission and the Provincial Coal Industry Bureau jointly issued a document stating that the province's coal output this year will be controlled within
146 million tons.
It is understood that Shandong Province currently has 174 coal production mines, with an approved production capacity of 172 million tons per year
.
Shandong Province will be guided by the control objectives, reasonably formulate the implementation plan for production control, and decompose and implement the control objectives layer by layer to ensure the balance
of production and sales.
Focus on restricting coal mines that do not perform coal mining subsidence and environmental governance obligations, as well as coal mines with
poor safety and security conditions, complex geological conditions, coal quality that does not meet commodity coal quality standards and serious resource compaction.
For coal mines with major safety hazards, all production will be suspended for rectification; For coal mines with serious losses and high coal stocks, planned production shutdown and maintenance
are organized.
For coal mines whose coal output has exceeded 50% of the announced production capacity in the first half of the year, production will be reduced and limited in the second half of the year to ensure that the annual output does not exceed the expected target
.
At the same time, Shandong Province actively and steadily promoted the closure and withdrawal
of small coal mines.
For small coal mines that have been included in the closure plan, it is strictly necessary to prevent illegal and illegal organization of production
.
Strict technical reform procedures and standards for small coal mines that are determined to be retained, strictly prevent evading closure in the name of transformation, and strictly prevent unauthorized organization of production
in the transformation area.
Coal mines that fail to complete the elimination task within the time limit shall be requested to the local government to be closed; Coal mines with major or above liability accidents shall be closed
immediately.
Shandong Province's coal production is planned to be 2 million tons
less this year than last year.