-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported recently that the Shanghai Bureau Exploration No.
6 platform was operating in a production well group in the Bohai Sea.
When it was drilled to a depth of 2237 meters, there was a sudden loss of wells, and more than 500 cubic meters of drilling fluid was lost
.
The platform immediately activated the plan and organized personnel from all departments to fight against the clock to stop leaks
The plugging operation is different from the past.
First, the well group has developed faults, and malignant leakage of drilling fluid often occurs
.
Then, the use of super-strong and complex leak-stopping materials raises the requirements for the operation of mud pumps
In response to complex situations, the platform calmly responds, coordinates deployment, and clarifies the division of labor.
The deck is responsible for the lifting and transportation of plugging materials, the well team is responsible for leakage detection and drilling fluid configuration, and the equipment department intensifies inspections to ensure that the equipment is normal
.
Operators followed the process, operated flexibly and cooperated with each other.
In recent years, Exploration No.
6 has always been adhering to the concept of "thinking what Party A thinks and urging what Party A is urgent", actively doing practical things for Party A, insisting on "Every inch of progress is a promise", and continuously improving technical capabilities and management levels.
, Strive to build a "management benchmarking team", start the operation brand, and contribute to the completion of the annual production and operation goals
.
(Wang Tiejun and Zhang Jiqiang)