echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Chemical Technology > Shenzhen power grid runs smoothly and effectively minimizes grid losses

    Shenzhen power grid runs smoothly and effectively minimizes grid losses

    • Last Update: 2022-11-22
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    During the landfall of Typhoon Nida, Shenzhen's power grid operated smoothly, effectively minimizing power grid losses
    .
    Prevention before the disaster, defense during the disaster, and rush after the disaster, scientifically and effectively minimize the loss of the power grid
    .

    The reporter learned from the Shenzhen Power Supply Bureau that as of 4 pm on August 2, the 110 kV transmission line tripped, 6 times (3 have not been restored, and the restoration is being organized), and no damage to power equipment and hidden dangers
    of major power equipment and facilities have been found.
    A total of 174 trips of 10 kV lines have been made, and 70 have not yet been restored, mainly concentrated in Bao'an, Longgang, Dapeng, Longhua, Pingshan, Guangming and Nanshan, affecting 24,579 users (accounting for about 0.
    8% of the total number of customers in Shenzhen).

    Li Qingkui, secretary of the party group and chairman of the board, personally went to the emergency command center of Shenzhen Power Supply Bureau to sit in front of the command, and connected with the emergency command center of the southern grid on the spot, encouraging the vast number of cadres and employees to respond calmly, do everything possible to do a good job in disaster repair, fully carry forward the fine traditions and work style, and win the tough battle
    of wind resistance and rescue.
    Next, the Shenzhen Power Supply Bureau will earnestly implement the requirements of the superiors, make every effort to speed up the power repair work, and strive to fully restore the power supply
    on August 3.

    During the landfall of Typhoon Nida, Shenzhen's power grid operated smoothly, effectively minimizing power grid losses
    .
    Prevention before the disaster, defense during the disaster, and rush after the disaster, scientifically and effectively minimize the loss of the power grid
    .

    Shenzhen Power Grid

    The reporter learned from the Shenzhen Power Supply Bureau that as of 4 pm on August 2, the 110 kV transmission line tripped, 6 times (3 have not been restored, and the restoration is being organized), and no damage to power equipment and hidden dangers
    of major power equipment and facilities have been found.
    A total of 174 trips of 10 kV lines have been made, and 70 have not yet been restored, mainly concentrated in Bao'an, Longgang, Dapeng, Longhua, Pingshan, Guangming and Nanshan, affecting 24,579 users (accounting for about 0.
    8% of the total number of customers in Shenzhen).

    Li Qingkui, secretary of the party group and chairman of the board, personally went to the emergency command center of Shenzhen Power Supply Bureau to sit in front of the command, and connected with the emergency command center of the southern grid on the spot, encouraging the vast number of cadres and employees to respond calmly, do everything possible to do a good job in disaster repair, fully carry forward the fine traditions and work style, and win the tough battle
    of wind resistance and rescue.
    Next, the Shenzhen Power Supply Bureau will earnestly implement the requirements of the superiors, make every effort to speed up the power repair work, and strive to fully restore the power supply
    on August 3.

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.