-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Recently, Sinopec's 80,000 standard cubic meters per hour waste gas treatment project passed the evaluation
of Wuhan Municipal Ecology and Environment Bureau.
The project is a key environmental protection project of 1.
1 million tons/year ethylene debottlenecking transformation of Sinopec, which mainly collects the waste gas of the No.
3 polypropylene unit and the No.
2 high-density polyethylene plant, and purifies the waste gas by using the process route of "waste gas collection + dust removal pretreatment + heat storage oxidation
".
The project consists of waste gas collection, waste gas pretreatment and other systems, which convert low-concentration organic matter in the exhaust gas into carbon dioxide and water, and achieve organic tail gas emission
up to standard.
At the same time, the project recovers heat from the treated exhaust gases to reduce operating costs
.