With the arrival of the hottest period of the year in the Saudi work area, the cadres and employees of the Saudi maintenance service team of Sinopec Zhongyuan Petroleum Engineering Company Engineering Service Management Center stuck to their posts in the wind and sand and under the scorching sun
The picture shows that on May 31, the team's employees carried out equipment testing and maintenance operations in the drilling team in the construction area under the high temperature and sandstorm
The picture shows that on May 31, the team's employees carried out equipment testing and maintenance operations in the drilling team in the construction area under the high temperature and sandstorm