-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On June 5, the Sino-Korea Petrochemical Ethylene Debottleneck Renovation Project undertaken by the Fourth Construction Company of Sinopec Corp.
According to reports, on March 28, 2020, the No.
The start of construction is a decisive battle, and the construction period is an order.
The HDPE device has a large amount of civil engineering, three high support molds (powder processing frame, extrusion granulation plant, blending silo frame), four large-volume foundations (hexane storage tank foundation, extruder foundation, compressor Foundation, raft foundation between cabinets) a deep foundation pit (waste water pond).
Combining the actual conditions of the project, focusing on the risks of civil construction deep foundation pits, high formwork, installation of high altitudes, cross operations, etc.
The extrusion granulator is the heart of the device and the key to whether the device can finally produce qualified products.
Strict lean management, with the goal of creating a national excellent project, clarify the division of personnel and responsibilities, refine process control, fully implement the three-inspection system and process inspection system, implement a review and concealed project acceptance system, and strengthen the inspection and acceptance of process details.
The CCCC of this device not only provided the foundation for Sino-Korea Petrochemical's production capacity to increase from 800,000 tons/year to 1.