    The construction of the outer wall real stone paint is a big project, many people think that this is a rough work, but as we often hear the details determine success or failure, real stone paint construction is also to pay attention to the details. Slightly mishandled will affect the overall effect of the project. In order to enable the real stone paint to show its best results, the editor today summarized the following points to share with you, hoping to help in the construction of
    China
    .
    1. The outer wall real stone paint 6 points of detail
    (1) using small particles of real stone paint, spraying requires the surface of the outer wall flat, small undulating, uniform distribution of particles, dense, consistent color.
    (2) true stone paint construction of all yang angle, layout should be long side to short edge, giving people the visual effect of the whole brick masonry.
    (3) split-block tape should be used paper tape, paper face real stone paint has a good adsorption effect; At the same time, when the temperature is high, the construction requires the tape to have good temperature resistance, to avoid the temperature slightly higher tape back melting.
    (4) requires that the gray seams be straight, wide and narrow, and that the bottom coating should not be removed when the section strip is torn.
    (5) grasp the tearing time of the split tape, the surface of the real stone paint is dry, with the hand press no obvious indentation and no sticky hand can be torn. Tearing too early, will lead to the flow of real stone paint; tearing too late, one is not easy to tear off the split tape, will lead to the gray seam at the real stone paint is removed, the gray seam is not straight.
    (6) the same batch of real stone paint at a time to reduce the color difference of different batches of paint.
    . The paint construction process should also pay attention to things
    (1) rainy days, cloudy days, foggy days and 5 levels of wind above, please do not work;
    (2) paint before use, should be fully stirred evenly,
    (3) construction process, to strengthen the protection of finished products, and take practical protection measures, the color parts and other ornaments at the junction, must be pasted tape protection or straight, to avoid paint pollution doors and windows and other unnecessary coating parts, if inadvertently polluted, should be immediately cleaned with a damp cloth, strictly prohibited after construction.
    3. It is recommended that you do not carry out real stone paint construction on rainy days, which will affect the overall quality of the later stages, if construction has begun, then be sure to keep in mind the following four to delay.
    Wind dry time delay
    rainy wind with sufficient moisture, in doing some work that requires air-drying, rainy dry time is 2-3 times the usual, must not be calculated according to the usual air-drying time.
    2. Grass-roots treatment delay
    the wall grass-roots putty and wall lining, in the rainy day need to dry a day, if these grass-roots treatment is not done well, the future spraying of real stone paint, will soon appear drum bags, cracks and other issues.
    3. Extend the wall drying time
    the normal wall drying time is about two hours, but in the event of rain or haze, it should be extended according to the weather conditions, and wait until the wall is completely dry before construction.
    4. Construction is delayed by at least one day
    generally speaking, the wall temperature is above 5 degrees C, the relative humidity of the air is not greater than 80%, and the humidity of the wall is less than 10% before construction can be carried out. Rainy weather or haze, humidity in the air is relatively high, and the wall is wet by rain moisture content is too high will cause drumming, alkali and other ills.
    the outer wall of the real stone paint construction to be meticulous, bad weather can not be carried out, so as not to cause greater losses, affecting the beauty of the wall and service life.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.