echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > Standard operating procedures for use of 30b crusher

    Standard operating procedures for use of 30b crusher

    • Last Update: 2017-06-05
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    Working principle of 30b crusher: the material enters into the crushing chamber, and is crushed under the impact, shear, friction of the teeth and the impact of the material between the movable tooth plate and the fixed tooth plate of high-speed rotation Under the action of the rotating centrifugal force, the crushed materials will automatically enter the collecting bag, and the dust will be filtered and recovered by the dust collector through the bag I preparation before use 1 Check the cleanliness of the equipment All parts shall be clean Check the status of the equipment identification and whether there is a clearance certificate 2 Where the oil cup is installed, inject proper high-temperature lubricating grease before start-up, and check whether the rotating part has enough lubricating grease 3 Check whether all the fastening screws of the machine are tightened, especially whether the fixed nuts of the movable teeth are loose 4 Check whether the upper and lower pulleys are parallel in the same plane and whether the belt is tensioned 5 Check the integrity of electrical appliances Before starting, check whether there are iron chips and other sundries in the main engine cavity 6 Install the collection bucket and cloth bag lined with plastic bag of screen and cyclone separator as required 7 Remove the "to be used" and "cleaned" status signs, and hang the "in operation" status signs 8 Collect raw materials according to production requirements 2 Operation procedure 1 Turn on the power supply, first turn on the slice machine of the cyclone separator, and then turn on the pulverizer Only when the rotating speed is normal, can the material be added for pulverization Add the material into the hopper, and adjust the hopper gate to open properly 2 Add the material into the hopper, and adjust the hopper gate to open properly 3 After the work, shut down and disconnect the power supply 4 Clear the site and arrange all relevant records and hang the equipment status signboard  
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.