echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Chemical Technology > The ancient natural gas processing plant is operating at full capacity

    The ancient natural gas processing plant is operating at full capacity

    • Last Update: 2021-08-27
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Fully guarantee the stable supply of Changqing Ethane to Ethylene Project

    Fully guarantee the stable supply of Changqing Ethane to Ethylene Project

    Recently, the production equipment of the Changqing Oilfield's Shanggu Natural Gas Processing Plant was operating at full capacity to ensure the supply of raw materials for the Lanzhou Petrochemical Changqing Ethane to Ethylene Project
    .

    The Shanggu Natural Gas Processing Plant project is a key project for CNPC to improve quality and efficiency, and it is the single largest investment project in Changqing Oilfield over the years
    .


    In order to provide raw materials for the Changqing ethane-to-ethylene project as soon as possible, the project was independently designed and completed one year ahead of schedule at the end of August last year.


    According to Jiang Weiping, director of the Technical Management Department of the Shanggu Natural Gas Processing Plant, the Shanggu Natural Gas Processing Plant can process 20 billion cubic meters of natural gas annually, and can produce 1.
    05 million tons of ethane, 450,000 tons of liquefied petroleum gas and stable light hydrocarbons per year, which is better than a domestic medium-sized oil field.
    The annual output is even higher
    .

    In order to ensure a sufficient supply of downstream raw materials, all the staff of Yulin Oil & Gas Company, which is responsible for the management of the ancient natural gas processing plant, voluntarily gave up vacations.
    While ensuring the normal production and operation of ethane, they actively participated in the summer maintenance of the device, especially for The export pipeline is long and involves many crossing railways and rivers.
    The Yulin Oil & Gas Company of Changqing Oilfield has organized personnel to conduct on-site inspections on the buried depth of pipelines and pipeline markings.
    The commissioning of the export pipelines should be done carefully and safely under control
    .


    Zhong Wei, deputy manager of Changqing Oilfield (Yulin) Oil and Gas Company, introduced: “In order to ensure the smooth operation of the ethane-to-ethylene project, the ancient natural gas processing plant optimized the shutdown and maintenance methods, starting with strengthening the production organization system, and adjusting the device parameters as liquid hydrocarbons.


    Yu Haojie, deputy general manager of Changqing Oilfield, introduced that in the next step, all new processing plants within the jurisdiction of Changqing Oilfield will fully benchmark the ancient natural gas processing plant, and separate high value-added products from natural gas at one time for downstream refining and chemical companies and chemical industries.


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.