Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Paint Network
News: epoxy
dation paint
construction caused by quality problems, more than 80% of the construction technology problems, because some in the coating process should pay attention to the above-mentioned problems to prevent, engineering management personnel to the construction site construction technology and engineering quality monitoring, each coating should pay attention to quality, only good quality, in order to paint high-quality epoxy flooring project.
Epoxy floor paint construction is most likely to lead to problems, resulting in quality problems of the process: basic ground treatment, material quality selection and deployment, tool use, construction personnel technology and construction environment grasp and management of 5 aspects, in the coating should pay attention to prevention, to avoid quality problems.
how to solve the five major problems of epoxy floor paint construction, the precautions are as follows:
1. Basic ground treatment:
good substrate is a good guarantee of epoxy floor paint coating work, it is recommended that in the basic treatment by technical engineers on-site guidance construction, including the degree of foundation grinding, flatness, cracks to find flat repair and treatment, oil removal and other processes should be in accordance with the standard operation, after treatment, check the quality of the substrate, avoid poor quality effect, resulting in poor epoxy floor paint coating effect.
2. Quality selection and deployment of materials:
must be strictly checked, configured with the various epoxy flooring paint materials used, all materials into the site flooring should be checked to eliminate the use of non-conforming products, followed by the material pre-construction deployment comparison, weighing, mixing time and mixing methods must be absolute standards.
construction process of epoxy resin wear-resistant flooring
3. Tool use:
in the selection of construction tools must be high-quality rollers, spray guns, paint brushes, textured paper and other tools and auxiliary equipment, to avoid the poor construction tools caused by the quality problems. Tool use, construction personnel should be familiar with the correct use of construction equipment and tools and skilled operation of construction tools.
4. Construction personnel technology:
must be the construction personnel post technical training, all over the Ping construction personnel should master familiar with the construction process of the technical indicators and construction methods, absolutely not allowed blind construction, brutal operation, especially paint construction, must have more than three years of work experience.
5. The grasp and management of the construction environment - the grasp of the construction environment:
refers to the current construction of temperature, humidity and environmental health monitoring and management, followed by the construction site management personnel must work with the general contracting party and subcontracted units for good construction, must be on-site paint construction personnel to carry out strict site management and clear site management system.