echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > International Chemical > The EIIB has a €500 million loan to support an Italian submarine cable project

    The EIIB has a €500 million loan to support an Italian submarine cable project

    • Last Update: 2022-12-30
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    The EIB has signed a €500 million financing contract with Terna for the eastern section
    of the Tyrrhenian submarine cable connecting Sicily and Campania.
    The project aims to connect Sicily with Sardinia and the Italian peninsula via a 970 km, 1,000 MW DC double submarine cable, promoting the development of
    renewable energy, grid reliability and energy security.

    The loan signed today is the first
    €1.
    9 billion loan approved by the European Investment Bank for the Tyrrhenian Connect project.
    Terna plans to invest around 3.
    7 billion euros in the construction of the Tyrrhenian connection, the first phase connecting the Italian peninsula and Sicily (eastern sector), which is expected to be commissioned in 2025, and then to Sardinia (western sector).

    The infrastructure will be fully operational
    in 2028.

    Gelsomina Vigliotti, Vice President of the European Investment Bank, said: "As world leaders gather in Egypt for COP27, the EIB, as the EU climate bank, is pleased to sign the first €500 million to support the construction of the
    Tyrrhenian connection.
    This infrastructure is of great strategic importance to ensure Italy's energy security, reduce CO2 emissions and promote the development of
    renewable energies.

    The 22-year loan has a longer term and a more competitive cost than the average loan on the market, in line with Terna's policy of
    optimizing its financial structure.

    This brings the total amount of EIB financing for Terna to €2.
    6 billion, with the remaining €1.
    4 billion going to other Tyrrhenian connection projects
    already approved by the bank.

    The EIB has signed a €500 million financing contract with Terna for the eastern section
    of the Tyrrhenian submarine cable connecting Sicily and Campania.
    The project aims to connect Sicily with Sardinia and the Italian peninsula via a 970 km, 1,000 MW DC double submarine cable, promoting the development of
    renewable energy, grid reliability and energy security.

    The loan signed today is the first
    €1.
    9 billion loan approved by the European Investment Bank for the Tyrrhenian Connect project.
    Terna plans to invest around 3.
    7 billion euros in the construction of the Tyrrhenian connection, the first phase connecting the Italian peninsula and Sicily (eastern sector), which is expected to be commissioned in 2025, and then to Sardinia (western sector).

    The infrastructure will be fully operational
    in 2028.

    Gelsomina Vigliotti, Vice President of the European Investment Bank, said: "As world leaders gather in Egypt for COP27, the EIB, as the EU climate bank, is pleased to sign the first €500 million to support the construction of the
    Tyrrhenian connection.
    This infrastructure is of great strategic importance to ensure Italy's energy security, reduce CO2 emissions and promote the development of
    renewable energies.

    The 22-year loan has a longer term and a more competitive cost than the average loan on the market, in line with Terna's policy of
    optimizing its financial structure.

    This brings the total amount of EIB financing for Terna to €2.
    6 billion, with the remaining €1.
    4 billion going to other Tyrrhenian connection projects
    already approved by the bank.

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.