-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Coatings Network
:
, the Ministry of Industry and Information Technology, the State Energy Administration jointly issued a public announcement (Announcement No. 69 of 2015).
announced that, according to the Notice of the State Council on Further Strengthening the Work of Eliminating Backward Production Capacity (Guofa (2010) No. 7), and the Notice on the Issue of the Implementation Plan for the Assessment of the Elimination of Backward Production Capacity (Joint Industry of the Ministry of Industry and Information Technology (2011) No. 46) requires that the Inter-ministerial Coordination Group (hereinafter referred to as the Coordination Group) for the elimination of backward production capacity shall conduct an assessment of the work of the provinces (regions, cities) and Xinjiang Production and Construction Corps in 2014 to eliminate backward production capacity, and will now announce the completion of the target tasks.
, 18 industries, including electricity, coal, iron and steelmaking, have completed the target of eliminating backward and excess capacity in 2014, according to the company's announcement. A total of 4.86 million kilowatts of electricity production capacity, 230 million tons of coal, 28.23 million tons of iron, 31.13 million tons of steelmaking, 18.53 million tons of coke, 2.62 million tons of ferroalloy, 1.94 million tons of electrolytic aluminum, 510,000 tons of electrolytic aluminum, 760,000 tons of copper smelting, 360,000 tons of lead smelting, cement (ceding) And grinding capacity) 87.73 million tons, flat glass 37.6 million weight boxes, paper 5.47 million tons, tanning 6.22 million standard sheets, printing and dyeing 2.09 billion meters, chemical fiber 110,000 tons, lead battery (pole plate and assembly) 30.2 million kV, rare earths 114,000 tons (see annex).
the announcement stressed that the steel industry in Anhui Province, jiangxi province coal and rare earth industry, Shandong Province coal industry has not completed the 2014 phase-out of backward and excess capacity tasks, the rest of the region have completed or exceeded the annual tasks. In accordance with the requirements of the Implementation Plan for the Assessment of the Elimination of Backward Production Capacity, the people's governments of Anhui, Jiangxi and Shandong provinces shall submit written rectification measures to the Ministry of Industry and Information Technology and the State Energy Administration within one month after the publication of this announcement. The relevant departments of the coordination group will follow up and supervise.