    The working principle and design requirements of aerobic pond

    • Last Update: 2021-06-18
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    The basic principle of aerobic pond purification of sewage is shown in Figure 8-2
    .




    Figure 8-2 Schematic diagram of the working principle of Haochlorine Pond

    The degradation process of organic matter in the aerobic pond is essentially the process of transforming dissolved organic pollutants into inorganic matter and solid organic matter-bacteria and algae cells
    .

    8.


    2.
    1.


    (1) The high-load aerobic pond has higher organic load, shorter hydraulic retention time (HRT), and shallower pond water depth
    .


    The effluent has a high content of algae


    (2) The organic load of the ordinary aerobic pond is lower than the former, and the hydraulic retention time is longer
    .


    To treat sewage as the main purpose, play a secondary treatment role


    (3) The organic load of the advanced treatment aerobic pond is low, and the hydraulic retention time is also short
    .


    Its purpose is to perform advanced processing after the secondary processing system


    8.
    2.
    1.
    2 Features and applicable conditions of aerobic pond

    Advantages: low investment; convenient management; short hydraulic retention time, fast rate of degradation of organic matter, and high degree of treatment
    .

    Disadvantages: the pond has a large capacity and a large area; the treated water contains a large amount of algae, and the effluent needs to be treated with algae; the removal of bacteria is poor
    .

    Applicable conditions: It is suitable for removing nutrients and treating dissolved organic matter; because of its better treatment effect, it is mostly used for further treatment after series connection in other stable ponds to treat the effluent after secondary treatment
    .

    8.
    2.
    1.
    3 General provisions of Haochlorine Pond

    ① The aerobic pond should be built in a place with suitable temperature, sufficient sunlight and good ventilation
    .

    ② It can be used alone or connected in series with other processing systems for advanced processing
    .

    ③If the aerobic pond is used to treat wastewater separately, it must be thoroughly pretreated before the wastewater enters the aerobic pond
    .

    8.
    2.
    1.
    4 Design calculation of aerobic pond

    (1) Design method In actual engineering, empirical data is often used for design, namely BOD 5 surface load method
    .


    Table 8-3 shows the typical design parameters of aerobic ponds


    (2) Structure and main dimensions

    ①Aerobic ponds are mostly rectangular ponds with a length-to-width ratio of (3:1) to (4:1)
    .

    ② Pond depth: high-load aerobic pond 0.
    3~0.
    45m; ordinary aerobic pond 0.
    5~1.
    5m; advanced treatment aerobic pond 0.
    5~1.
    5m; the super height of aerobic pond is 0.
    6~1.
    0m
    .

    ③ Embankment slope: slope inside the pond (1: 2) ~ (1: 3); slope outside the pond (1: 2) ~ (1: 5)
    .

    ④ Number of ponds and area of ​​a single pond: Generally, the number of aerobic ponds is not less than 3, and at least two
    .


    Generally, the area of ​​a single pond shall not be larger than (0.


    Table 8-3 Typical design parameters of aerobic pond


     

     

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.