Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Waterproofing project is a very important part of home decoration, and the difficulty is relatively large, high technical requirements, for waterproof material selection and application is also very careful, if you do not pay attention to waterproofing project, it is likely to lead to house leakage, easy moisture, building materials easy to corrosion and other issues. Next for everyone to organize the waterproof project common problems, as well as waterproof materials according to a number of factors to choose, so that we know more about waterproof engineering.
1: Waterproof engineering FAQ
1: waterproof slurry to add water
has been equipped with waterproof slurry in fact the ratio of the materials is already the best, if in the construction of water or some other substances will lead to changes in the water-resistant slurry ratio, resulting in poor waterproof performance, a short period of time will be leakage, water seepage and other safety issues
2: tiles do not bubble water on the use of
house decoration to paste tiles, if the tiles do not bubble water before use, then it will absorb moisture in the cement, resulting in fit on the wall is not tight, attached will be easy to fall off and empty drums and other issues.
3: There is water also painted waterproof
wall and grass water, if painted waterproof, it will dilute waterproof slurry, resulting in uneven slurry, surface will also form whitening and other quality and appearance problems.
4: Waterproof materials should be used before acceptance
waterproof materials related to the safety of the entire waterproof project, so the construction team to use waterproof materials, construction, construction, supervision units should carry out waterproof materials testing, acceptance work, although some people feel that there is no need for this move, but sometimes because of multi-party control, careful handling, quality problems will not appear.
5: do not pay attention to waterproofing project
building housing waterproofing project is a very important link, if the decoration team think that developers have done a good job of waterproofing, and in the decoration only to do the key location waterproof treatment, the use of poor quality waterproof materials, then once waterproof problems, then for the owner of the house will have a great loss.
6: did the waterproof layer but did not do the protective layer
did a good job of waterproof slurry brushing, because for a while did not do the protective layer, resulting in the late cross-construction caused the damage of the waterproof layer, the quality of the waterproof layer is poor, the waterproof effect is unstable.
water-resistant materials for waterproofing projects?
building, housing waterproofing project for waterproof material requirements are more stringent, must be applied to walls, roofs, basements, pools, roads, bathrooms and other important locations, but also waterproof moisture and leakage.
JS polymer cement waterproof coating
this waterproof coating not only in the dry surface construction, but also in the wet substation construction work, bonding strength is also very strong, especially for the grass water content is not limited, water-based paint does not use open fire, no construction safety hazards, and coating film has a high stretch strength, water resistance and weather resistance and other obvious advantages, is a very wide range of waterproof coatings.
。