echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > What are the precautions for installing pharmaceutical purified water equipment?

    What are the precautions for installing pharmaceutical purified water equipment?

    • Last Update: 2020-06-23
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    a set of good equipment from design to selection to installation should be taken seriously, in order to ensure that the long-term use process, the role of pure water to play out, the following small editor to everyone pharmaceutical purification water equipment installation precautions1, installation location can choose garage, outdoor equipment room and other areas; 2, before installing water treatment equipment, should be reserved for the corresponding space, access to water pipe interface, sewage pipe, as well as voltage 220 volts single-phase three-line five-eye socketThe specific size is based on the ground after the decoration; 3, to reserve an inch or 3/4 of the outer wire interface in the inlet, water outlet port, the middle wheelbase 10-15cm, according to the size of the equipment to set their vertical distance from the ground; 4, if the need to install water treatment equipment outdoors, should be equipped with sun protection, anti-freeze and other measures;5, do not place water treatment equipment near heat sources, if it is necessary to install at the heat source need to install insulationfacilities; 6, water treatment equipment will be attached to a sewage hose, connect the reserved sewage pipe, reserved sewage pipe height should reach 40cm, its position should be as far as possible against the wall, not more than 50cm away from the equipment; 7, should be installed in the water treatment equipment above the power outlet, and the distance from the equipment to be within one meter; 8, cabinet-type equipment, in the decoration of cabinets for water treatment equipment installation size must be taken into account, and set aside the corresponding space for it; 9, if the water supply pressure is less than 2kg, in the back of the water meter, equipment front installation booster pump
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.