echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > What are the requirements for on-site inspection of the coating drying room?

    What are the requirements for on-site inspection of the coating drying room?

    • Last Update: 2020-12-02
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
     Coating drying room on-site inspection requirements:
    1. Coating drying room should be marked with safety technical data nameplate;
    2. Drying room oven, oven, oven is set up flammable gas concentration and over-temperature alarm.
    . No flammable and explosive articles shall be stored around the drying room, fire extinguishing devices, fire-fighting equipment, and open fires shall be strictly prohibited at the operating place where the drying room is
    located;4. The electric heating drying room shall be provided with a safe ventilation device, which shall have reliable measures to prevent sparks from occurring (explosion-proof fan); the drying chamber housing shall be grounded (protection ground resistance is less than or equal to 10 ohms), and static protection grounding shall be set (static protection ground resistance is less than or equal to 100 ohms).
    5. Fuel and gas heating and drying combustion devices should be linked with ventilation devices, there are fire protection measures, in the use of direct combustion heating system, should be set up air circulation system, the use of automatic ignition system, combustion device can automatically cut off the supply of fuel
    China
    . The coating drying chamber housing must be grounded, the protective ground resistance is less than 10 ohms, and the static protection ground resistance is less than or equal to 100 ohms.
    6. The storage point of dangerous chemicals can only be placed for one
    day;7. Whether the drying room safety operating procedures are suspended in a prominent position near the equipment, in the production site of the relevant facilities, equipment, set obvious safety warning signs;
    8. Drying room loading door horizontal and vertical direction within 3 meters of electrical equipment are explosion-proof type, distribution box (disk) should be equipped with leakage protector;
    9. coating drying room operators should be trained in safety technology before induction.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.