-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Coating drying room on-site inspection requirements:
1. Coating drying room should be marked with safety technical data nameplate;
2. Drying room oven, oven, oven is set up flammable gas concentration and over-temperature alarm.
. No flammable and explosive articles shall be stored around the drying room, fire extinguishing devices, fire-fighting equipment, and open fires shall be strictly prohibited at the operating place where the drying room is
located;4. The electric heating drying room shall be provided with a safe ventilation device, which shall have reliable measures to prevent sparks from occurring (explosion-proof fan); the drying chamber housing shall be grounded (protection ground resistance is less than or equal to 10 ohms), and static protection grounding shall be set (static protection ground resistance is less than or equal to 100 ohms).
5. Fuel and gas heating and drying combustion devices should be linked with ventilation devices, there are fire protection measures, in the use of direct combustion heating system, should be set up air circulation system, the use of automatic ignition system, combustion device can automatically cut off the supply of fuel
China
. The coating drying chamber housing must be grounded, the protective ground resistance is less than 10 ohms, and the static protection ground resistance is less than or equal to 100 ohms.
6. The storage point of dangerous chemicals can only be placed for one
day;7. Whether the drying room safety operating procedures are suspended in a prominent position near the equipment, in the production site of the relevant facilities, equipment, set obvious safety warning signs;
8. Drying room loading door horizontal and vertical direction within 3 meters of electrical equipment are explosion-proof type, distribution box (disk) should be equipped with leakage protector;
9. coating drying room operators should be trained in safety technology before induction.