echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > What details should you pay attention to when using a continuous flow tube centrifuge?

    What details should you pay attention to when using a continuous flow tube centrifuge?

    • Last Update: 2020-11-13
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    The details determine the success or failure of this sentence is still very certainly reasonable, if many details do not pay attention to will lead to equipment seizure problems, even serious may lead to equipment damage.
    you pay attention to those details with a continuous flow tube centrifuge? Let's explore it with the editor-in-chief.
    1, liquid data pre-treatment, to reduce the amount of processing liquid material through full pre-treatment as far as possible into the continuous flow tube centrifuge, clear most sediment can be removed, in order to reduce the solid content, mixing materials to increase mobility.
    this can effectively improve the effect of centrifuge separate, reducing the separate moments.
    2, control feed pressure and feed speed according to the characteristics of the material and process conditions, the selection of high tank feed or pump feed.
    the nozzle diameter is fixed, the higher the intake pressure, the higher the output.
    according to the characteristics of the material control feed flow, under the same separate features, the smaller the flow, the smaller the output, the better the separate effect of the material fluid.
    in order to adhere to the same separate effect, at the beginning of the separate operation, the feed volume should be large, and then small.
    3, do not give up halfway, reduce the number of downtime in the separate operation process, in addition to the roller internal slag impact is too large, blocking the separate effect of slag, usually, tube centrifuges do not stop halfway, as far as perhaps reduce the number of half-way shutdown will affect the effect of the difference.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.