Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
In recent years, real stone paint paint by virtue of safety and environmental protection, practical and affordable features gradually swept the country, many buildings, villas, etc. have used real stone paint for external wall decoration, fashion elements. However, in the application, many people still have a certain cognitive misunderstanding, and therefore affect the real effect of real stone paint. So what are the requirements for the base surface of the real stone paint construction? What should I pay attention to during the construction process? Let's take a look at
.
01
basic requirements for the substation
building substation must be kept clean and dry, completely hardened, no oil and dust and mold spots, no looseness, peeling, shelling and powdering phenomenon, otherwise, the poor condition of the substation itself will seriously affect the construction effect of the real stone coating.
general treatment before construction
If there are more problems on the base surface of the building construction, putty can be used to deal with the wall one or two. Putty can increase the bonding strength of real stone coating and building construction substation, and prevent the occurrence of peeling phenomenon.
If the building substrate is in good condition, without any obvious defects such as rotten surface, in the fine putty batch scraping, anti-alkali primer and medium spray, can be directly sprayed with real stone paint.
02
real stone primer construction points
primer first time, must be diluted in accordance with the instructions of use, combined with brushing and roller coating at the same time construction. The second time does not need to be diluted.
For small surface of the construction substation, you can use paint brush method to operate the use of roller construction method, in the roller after a small amount of paint, first press the "" glyph roller method to the paint roller to the wall, and then on the roller wall gently and smoothly back and forth rolling, straight up and down, to avoid twisting snake line. Do the brush uniform, closed strict, consistent thickness, no pendant, no mole, no contact.
whether it is black primer or transparent primer, must be painted evenly, directly affect the texture of the paint painting effect. If the primer is not uniform, there will be chromic achromia and flowering after the texture coating is dry.
03
, therefore, do a good job of primer construction on the painting of real stone paint paint can play a double effect with less effort! In the case of proper treatment of the substation, the construction of real stone paint is relatively simple, the effect can also be better protected. Of course, the premise is to choose the quality of the real stone paint products!
.