echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Winter decoration construction has to pay attention to the 8 major considerations

    Winter decoration construction has to pay attention to the 8 major considerations

    • Last Update: 2021-01-18
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    China Paint Online News Information: Choose to carry out home decoration in winter can be a lot of people, mainly dry winter climate, convenient construction, and near the New Year, many people want to decorate a brand-new house to meet the new year, but at the same time the winter decoration also exists too cold construction inconvenience, near the New Year construction prices and other issues. Then start today with the winter decoration construction precautions.1. Wood article: oil sealing treatment, to prevent wind cracking procurement of materials do not open storage, materials into the construction site after the surface to brush a layer of oil, also known as oil sealing treatment, in order to prevent wind cracking and deformation. After the decorative panel is transported to the scene, apply a dry towel to wipe off the dust, paint the varnish back cover twice in a row, and all decorative panels should be flat, at the bottom of the decorative panel pad a fine woodworking board, the panel on top of a fine woodworking board, so that the plate can be kept flat. Do not put the panel vertical, will cause the panel to crack, up.2. Putty: window opening time, range has to pay attention to wall, small flowers if scraping putty or paste wallpaper, to naturally dry, do not open the door and window, to prevent rapid water loss and affect construction and deformation. Window ventilation time is also careful: it is best to choose between 10 a.m. and 4 p.m., this period of time the temperature is relatively high, to prevent the newly scraped putty freezing. The correct way to scrape putty is to wait for the first putty to dry out completely, then scrape the putty a second time, and the second time the putty is completely dry before carefully polishing with sandpaper. Sand and ash walls, insulation walls are best all cloth, directly scrape putty on the cloth, until dry and smoothed with sandpaper. If the wall has a large hole or concave, it is best to use plaster powder with latex and level the wall. When there is a large crack in the wall, the crack should be attached to the d'italic paper and then scrape putty, when the area is larger, it is best to put on the cloth, and then scrape putty, so as to prevent the wall from flat, not cracked.3. Paint: construction environment temperature is the most important painters in spraying a variety of coatings, should be strictly in accordance with the temperature in the product description. In general, the ambient temperature of coating application should not be less than 5 degrees C, where the commonly used mixed color coating application is the ambient temperature should be above 0 degrees C, varnish application of the ambient temperature is not less than 8 degrees C. Oilman's work should pay more attention to "warm", after full drying and then open doors and windows ventilation.4. Auxiliary article: sand should not contain ice, cement should not be open the sand used in the construction should be carefully screened, must not contain ice. When stirring the mortar, the temperature of the water must not exceed 80 degrees C. If the decoration needs cement, it is best not to open-air construction, the site should also pay attention to insulation.5. Heating article: heating began, prohibited demolition In the home decoration, people pay more and more attention to the beauty of the heating equipment in the room, the original cast iron heating gradually fall out of favor, many people in the decoration is to replace the new radiator. Therefore, consumers should buy a regular manufacturer of radiators and let the professional installation team to install. After entering the heating period, the heating has pressurized the water supply, if the construction is slightly improper, it is easy to lead to "running water" accidents, resulting in irreparable losses. Therefore, after the central heating starts, the heating lines and heating sheets are strictly prohibited from being removed and replaced.6. Exterior window: cement mortar to block strictly, sealant strip not too tight installation of plastic steel windows has also become a common project of decoration, first of all, the replacement of the outer window must be fixed firmly, even if the slight tilt, the window in the future push and pull open will also become a problem, the rainy season will seep into the rain. Second, the cement mortar around the closed exterior window must be blocked, otherwise in the coldest winter, the northwest wind blowing, and then warm house temperature will be reduced. Again, the sealant strip of the plastic steel window should not be sealed too tightly. The rubber seals used in plastic steel windows are hot and cold, which tightens to a certain extent during winter installation and expands when heated in hot summer months.7. Fire prevention article: construction site to configure fire extinguishers winter decoration must pay attention to, can not be used in the construction site fire, electric heating equipment, cooking gas pipes, water-resistant spray lamps, etc. should be used with caution, at the same time must be placed on the scene fire extinguishers.8. Pollution: paint, glue release formaldehyde, benzene and other substances winter climate is cold, construction, workers are used to close doors and windows, which can easily cause indoor air pollution poisoning. In particular, the decoration process to paint waterproof layer, with glue products, flooring, painting, the air will have a large number of harmful formaldehyde, benzene substances, these substances received through window breathing to volatility, otherwise it will be deposited in the indoor air, the concentration is also growing. Therefore, not only in the decoration process to open the window ventilation, but also after the decoration should pay attention to open the window ventilation, preferably after the completion of the project about two months to carry out normal use.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.