echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Xi'an Volatile Organics (VOCs) fully implement special emission limits

    Xi'an Volatile Organics (VOCs) fully implement special emission limits

    • Last Update: 2020-11-20
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    In order to comprehensively target the State Council's Three-Year Action Plan to Win the Blue Sky Defense War and shaanxi Province's Three-Year Action Plan to Win the Blue Sky Defense War (2018-2020) (revised version), adhere to the common rule of the whole people, source prevention and control, specimen and treatment, continue to implement air pollution prevention and control actions, improve the city's air quality, and formulate this plan.
    , the overall requirements of the
    (i) guiding ideology.
    Guided by Xi Jinping's thought of ecological civilization, we will fully implement the spirit of the 19th Party Congress and the 13th Party Congress of the provinces and cities, firmly establish new development concepts, implement the strategic task of "five new" and achieve air quality catch-up beyondChina." In accordance with the "Ten Methods of Haze Control", adhere to the iron fist to control haze, scientific haze, coordinated haze control, vigorously adjust the industrial structure, energy structure, transport structure and land structure, pay close attention to the total amount of pollution weather response, so that the total amount of atmospheric pollutant emissions significantly reduced, particulate matter concentration significantly reduced, heavy pollution days significantly reduced, air quality significantly improved, the people's blue sky happiness significantly enhanced.
    (ii) work objectives.
    to consolidate the achievements of the first phase of improving air pollution control, focusing on the prevention and control of particulate matter (PM10, PM2.5) pollution, and jointly promoting the control of ozone (O3) predominant pollutants such as nitrogen oxides (NOX) and volatile organic compounds (VOCs). In 2018, the city's fine days reached 243 days, fine particulate matter (PM2.5) concentration reached 60 micrograms per cubic meter, inhalable particulate matter (PM10) concentration reached 126 micrograms per cubic meter; The concentration reached 54 micrograms per cubic meter, the concentration of inhalable particulate matter (PM10) reached 122 micrograms per cubic meter, and by 2020, the city's fine days reached 263 days, the concentration of fine particulate matter (PM2.5) reached 51 micrograms per cubic meter, and the concentration of inhalable particulate matter (PM10) reached 119 micrograms per cubic meter. The number of days of heavy pollution was significantly reduced, the trend of rising concentrations of nitrogen dioxide (NO2) and increased pollution of ozone (O3) was curbed, and the average annual concentrations of sulfur dioxide (SO2) and carbon monoxide (CO) were aimed at meeting the national environmental air quality secondary standards.
    (iii) basic principles.
    adhere to scientific haze control, accurate measures. Based on the current, planning long-term, not only to find the right root of the disease, do a good job of top-level design, but also to seize the key, strong to overcome difficulties, to ensure that the data true, monitoring true, called board true, real task, measures, responsibility, rapid deployment, rapid promotion, quick results. Highlighting the specimen and treatment, focus on the treatment, not only in the emergency response period, to take extraordinary measures to strengthen the standard, cut peak value, curb the serious situation of air pollution, but also winter disease and summer treatment, four seasons long-term treatment, focus on adjusting and optimizing the industry, energy, transportation, land structure, improve the scientific, accurate and long-lasting treatment of haze.
    to work together to control the haze and work together to overcome the problem. Establish a sense of the overall situation, break the "wall thinking", focus on regional characteristics, implement a coordinated response, implement the joint prevention and control of air pollution control in the Plains and Guanzhong areas;
    insist on an iron fist to control the haze, strict control really catch. Strict implementation of the "party and government responsibility, one post double responsibility" requirements, and effectively consolidate the "industry-led, territory management" responsibility, layer by layer conduction pressure, dare to move hard, increase accountability, the implementation of iron-fisted action. Establish and improve the whole chain, seamless, closed-loop grid management system, strengthen online and offline control, implement point-to-point supervision, crack down on environmental violations, always maintain a high-pressure situation to control haze, to ensure that air pollution control measures to achieve results.
    , key tasks,
    (1) to adjust and optimize the industrial structure, promote the green development of industry.
    1. Strengthen source control. In 2018, the red line for ecological protection will be completed. In 2019, complete the preparation of the environmental quality bottom line, the use of resources online, the environmental access list, the establishment of a more stringent threshold for industrial access, clearly prohibit and restrict the development of industries, production processes and industrial catalogs. Actively carry out regional and planning environmental impact assessment, prohibit new construction projects such as steel, petrochemical, chemical, coking, building materials, non-colored, and meet the requirements of regional and planning EIA for the environmental impact assessment of existing chemical, building materials, non-colored and other projects. New chemical parks are prohibited. (The Municipal Environmental Protection Bureau led, the Municipal Development and Reform Commission, the Municipal Industry and Information Technology Commission, the Municipal Planning Bureau, the Municipal Land Bureau, the Municipal Water Bureau, the Municipal Agriculture and Forestry Commission, the Municipal Construction Commission, the Municipal Qinling Office and other participation.) The leading department ranked first is the general lead department, which is the same as among the following, and the district and county governments, xi'an New Area and the development zone management committees are responsible for implementing it. The following are required by the district and county governments, Xi'an New Area, the development zone management committee is responsible for the implementation, no longer listed)
    2. optimize the industrial layout. Strict implementation of the "Guan zhong region pollution control and haze reduction key industry project construction guidance directory (2017 this year)," prohibit the new construction, expansion of coal-fired power generation, coal-fired co-generation and coal-fired central heating projects, prohibit the construction, expansion and reconstruction of petrochemical, coal chemical projects. In accordance with the requirements of regional functional area division, the preparation of industrial development plans, the city's existing development zones, industrial parks, high-tech zones, in accordance with the requirements of industrial layout planning, the implementation of backward industries, industry clearance. (The Municipal Development and Reform Commission, the Municipal Industry and Information Technology Commission led by the Municipal Land Bureau, the Municipal Planning Bureau
    ). 3. Strict control of the "two high" industry production capacity. Year by year to develop high energy consumption, high emissions industry enterprises exit work programme, for enterprises that have been clearly retired from the city, to clear the timetable, overdue to withdraw from the city to stop production. Focus on reducing cement (excluding grinding stations), petrochemicals, coal chemicals, waterproof materials (excluding natural gas as fuel), ceramics (excluding natural gas as fuel), insulation materials (excluding natural gas as fuel) and other industries production capacity. By 2020, the city's built-up areas have basically completed the relocation and transformation of heavily polluting enterprises or closed down and exited. (Led by the Municipal Industry and Information Technology Commission, the Municipal Development and Reform Commission, the Municipal Environmental Protection Bureau
    ). It is strictly forbidden to add new production capacity such as cement, casting, electrolytic aluminum and flat glass, and to implement the implementation measures for the replacement of production capacity in cement, flat glass and other industries strictly in line with the state; (Led by the Municipal Industry and Information Commission, the Municipal Development and Reform Commission, the Municipal Environmental Protection Bureau, the Municipal Transportation Bureau, etc.)
    4. Increase the elimination of backward capacity and excess capacity pressure reduction efforts. Strict implementation of quality, environmental protection, energy consumption, safety and other regulatory standards, in accordance with the law to increase the elimination of backward capacity and excess capacity pressure reduction efforts. Strictly prevent the re-resurgent of "strip steel". (The Municipal Development and Reform Commission, the Municipal Industry and Information Technology Commission led by the Municipal Environmental Protection Bureau, the Municipal Finance Bureau, the Municipal Quality Supervision Bureau, the Municipal Safety Supervision Bureau, the Municipal Bureau of Industry and Commerce, etc. to participate in the
    ). 5. Strengthen the "dispersed pollution" enterprise comprehensive rectification. Comprehensively carry out "dispersing pollution" enterprises and clusters of comprehensive remediation actions. According to industrial policy, industrial layout planning, as well as land, environmental protection, quality, safety, energy consumption and other requirements, to further improve our city's "dispersed pollution" enterprises and cluster identification, rectification standards. The implementation of pull-net-type troubleshooting, the establishment of management accounts, the implementation of classified disposal. Those included in the closure and suppression category shall basically achieve "two breaks and three clears" (cutting off industrial water, electricity, removal of raw materials, products, production equipment); those included in the integrated relocation category shall, in accordance with the principle of industrial development scale and modernization, be relocated to industrial parks and carry out upgrading and upgrading, and handle the relevant approval procedures in accordance with the relevant regulations; The establishment of "dispersed pollution" enterprise dynamic management mechanism, resolutely put an end to the "dispersed pollution" enterprise project construction and has been banned "dispersed pollution" enterprises off-the-ground transfer, resurgent. By the end of 2019, the city's "dispersed pollution" enterprises are basically completed. (Led by the Municipal Industry and Information Technology Commission, the Municipal Environmental Protection Bureau, the Municipal Development and Reform Commission, the Municipal Land Bureau, the Municipal Quality Supervision Bureau, the Municipal Bureau of Industry and Commerce, the Municipal Safety Supervision Bureau, etc.)
    ). 6. Deepen industrial pollution control. Key industrial pollution sources fully install on-line monitoring facilities for flue gas, and supervise pollution source enterprises to ensure that online monitoring data are true and accurate. We will strictly implement the Plan for the Implementation of the Comprehensive Compliance and Emissions Plan for Industrial Pollution Sources in Shaanxi Province (2017-2020), continue to promote the full compliance of industrial pollution sources, carry out supervisory monitoring of enterprises involved in gas pollution sources, and report the results to the Environmental Protection Department in a timely manner. Take the on-line monitoring data of flue gas as the basis for law enforcement, increase the punishment of exceeding the standard and joint disciplinary efforts, and order the enterprises that do not meet the standards of pollutant emissions to make rectification within a specified period of time; Encourage the purchase of services, the introduction of third-party social professional institutions for monitoring and pollution control facilities operation and management. Establish an enterprise emission licensing system covering all fixed sources of pollution, and complete the licensing of industry licenses as stipulated in the sewage permit management directory by the end of 2020. (Led by the Municipal Environmental Protection Bureau)
    7. Promote pollution control and upgrading in key industries. Sulfur dioxide, nitrogen oxides and particulate matter fully implement the special emission limits for atmospheric pollutants. Volatile organic compounds (VOCs) of petrochemical industry, synthetic resin industry and polyethylene industry have fully implemented the special emission limits for atmospheric pollutants, and the industries involved in volatile organic emissions that have not yet issued special emission limits for atmospheric pollutants have implemented the Volatile Organic Matter Emission Control Standards (DB61/T1061-2017) in Shaanxi Province. According to provincial requirements, promote the implementation of key industries ultra-low emission transformation. Strengthen the control of unorthordified emissions in industrial enterprises. To carry out unostigated emission checks in key industries such as building materials, non-colored, thermal power, casting and coal-fired boilers, establish management ledgers, and implement in-depth control of unsealed emissions such as material (including waste slag) transportation, loading and unloading, storage, transfer and process, which will be basically completed by the end of 2019. (Led by the Municipal Environmental Protection Bureau, with the participation of the Municipal Development and Reform Commission and the Municipal Industry and Information
    ). 8. Promote the circular transformation of all kinds of parks, standardize development and promote quality and efficiency. We will speed up the transformation and upgrading of existing parks, vigorously promote clean production of enterprises, extend the industrial chain, improve industrial relevance, build public service platforms, and realize intensive land utilization, efficient use of resources and energy, and utilization of waste resources. We will strengthen classification guidance for parks of different natures and encourage the creation of pilot pilot parks for national recycling and transformation. We will improve the park's central heating facilities and actively promote clean energy (excluding natural gas) central heating. By 2020, 75% of national parks and 50% of provincial parks will be recycled. (The Municipal Development and Reform Commission, the Municipal Finance Bureau led, the Municipal Industry and Information Technology Commission, the Municipal Environmental Protection Bureau, the Municipal Science and Technology Bureau
    ). For the existing types of industrial parks, the deadline for the transformation of standards, reduce pollution in industrial clusters. Conditional industrial concentration area pilot construction of centralized spraying engineering center, equipped with efficient pollution control facilities, replacing the independent spraying process of enterprises. (The Municipal Environmental Protection Bureau led, the Municipal Industry and Information Technology Commission, the Municipal Science and Technology Bureau, etc.
    9. Vigorously cultivate green industry. We will expand the scale of green industries, develop energy-saving and environmental protection industries, clean production industries and clean energy industries, and foster new momentum. We will actively support the cultivation of a number of large-scale energy-saving and environmental protection leading enterprises with international competitiveness, support the capacity-building of technological innovation, accelerate the mastery of major key core technologies, and promote the development and popularization of industrialization and application of key technologies and equipment for atmospheric governance. We will actively implement overall solutions for energy conservation and environmental protection, accelerate the development of new industries such as contract energy management, third-party management of environmental pollution and social monitoring, and cultivate a number of high-level, specialized energy-saving and environmental protection service companies. (Led by the Municipal Development and Reform Commission, the Municipal Industry and Information Commission, the Municipal Environmental Protection Bureau, the Municipal Science and Technology Bureau, etc.
    ). (2) Speed up the adjustment of the energy structure and build a clean, low-carbon and efficient energy system.
    10. Construction of high-polluting fuel no-burn zones. To complete the construction of the designated high-polluting fuel no-burn zone, prohibit the sale and combustion of high-polluting fuels in the no-burn zone, and prohibit the construction or expansion of facilities for the combustion of high-polluting fuels, the completed facilities shall be converted to natural gas, shale gas, liquefied petroleum gas, electricity or other clean energy within the time limit prescribed by the regional county government and the Development Zone Management Committee. According to the requirements of improving the quality of atmospheric environment, the scope of high-polluting fuel no-burn zones is gradually expanded. (Led by the Municipal Environmental Protection Bureau)
    11. Implementation of total coal consumption control. The total amount of coal consumption is controlled mainly by the reduction of loose coal, and the industry is mainly reduced by fuel coal, so as to complete the annual coal reduction task issued by the province. We will implement the Interim Measures for the Budget Management of Coal Consumption of Key Enterprises in Guansing Region, and the Interim Measures for the "Thermal Power Generation" units of co-production (owned power plants) in Guansing Region, and strengthen coal-saving transformation. In accordance with the principle of centralized and clean use of coal, focus on reducing non-electric coal, increasing the proportion of coal used for electricity, by 2020 the proportion of coal used in the city's total coal consumption significantly increased, coal as a proportion of total energy consumption within 60%. Continue to promote electricity to replace coal and fuel, replacement scale to meet provincial requirements. Coal consumption achieved negative growth. (Led by the Municipal Development and Reform Commission, with the participation of the Municipal Municipal Council, the Municipal Industry and Information Commission and the Municipal Bureau of Statistics)
    12. In-depth promotion of loose coal governance. The village promoted the replacement of clean energy for rural residents, agricultural production and commercial coal-fired (wages), and replaced it with clean energy such as electricity for coal, gas for coal, and geothermal, wind and solar energy. Solidly do a good job in the central financial support of the northern region clean heating pilot work, comprehensive consideration of energy supply security, adhere to the actual start, first stand and then break, yi electricity, gas, heat is hot, coal, the formulation of 2018-2019 city-wide bulk coal management plan, carry out household mapping, clear governance list, some mountain rural areas and heritage reserves and other clean energy can not cover the region, continue to implement the "coal-based system", clean coal Strive to basically complete the replacement of bulk coal by the end of October 2019. (The Municipal Development and Reform Commission led, the rest of the departments in accordance with our city's coal reduction special program division of responsibility)
    Year by year pressure reduction fixed-point civil clean coal business premises, 2018 pressure reduction of not less than 60%, in 2019, the city's "no-burn zone" in principle no longer retain fixed-point clean coal business premises, "no-burn zone" outside the reasonable layout of clean coal distribution outlets as needed. (Led by the Municipal Bureau of Commerce)
    To organize and carry out special inspection actions for coal-fired bulk burning control to ensure that clean coal produced, circulated and used meets the standards. Quality supervision, industrial and commercial departments should focus on clean coal production and sales links, organize monthly special inspection of clean coal quality, and crack down on the sale of inferior coal in accordance with the law. (Led by the Municipal Quality Supervision Bureau and the Municipal Bureau of Industry and Commerce)
    13. Renovation of coal-electric enterprises. Under the premise of ensuring the safe and stable operation of the power system, the new electricity consumption mainly depends on non-fossil energy generation and power transmission in the region to meet, and by 2020, the proportion of electricity received from the export will be significantly higher than in 2017.
    to vigorously eliminate the shutdown of environmental protection, energy consumption, safety and other non-standard 30 million kilowatts of fuel
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.