-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
- Cosmetic Ingredient
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Fuzhou Station East Interoperability Transformation is located in Fuzhou Jin'an District Station East Road, is an important part of the road improvement and transformation around the railway station, the completion of the project will speed up the communication of the Third Ring Road, ease the traffic pressure around the railway station.
road surface transformation of the Third Ring Road is 1750 meters long, and the total length of the road surface transformation of Xuannanling Road is 462 meters, which is composed of the current watering beams and steel structure bridges.
letter and the winning bid Fuzhou station East interoperability transformation of anti-corrosion coatings, and the successful recommendation letter and zinc ene hope related supporting.
The owners want to get reliable steel structure long-lasting anti-corrosion, but also hope to reduce transportation and site installation breakage rate and save costs, improve efficiency, and as graphene modified epoxy zinc, zinc hope and related supporting systems to perfectly meet customer needs! Zinc-ion graphene modified epoxy zinc primer can not only provide up to 10000 hours of salt-resistant fog corrosion performance, but also has excellent anti-stone resistance, thick film cracking performance, etc., for the owner's assets to provide very reliable protection, but also effectively avoid non-standard construction and transportation, installation process resulting in thick film cracking, coating shedding and other defects, thereby saving customers in the production and installation process costs, improve customer competitiveness.
Affected by the outbreak, the project started some lag, but the completion time can not lag, so the project duration is very tight, in order to ensure the quality of construction, letter and technical service team, as always, dedicated to ensure the smooth progress of construction, shouldering the mission of "creating value for customers" to build customer trust letters and brands.
.