-
Optimization of Shanghai Petrochemical Heavy Naphtha Resource Utilization
Time of Update: 2021-09-27
By optimizing the flow direction of naphtha, it not only solved the way out of heavy naphtha during the inspection and modification of Shanghai Petrochemical, but also realized the optimal naphtha processing route in the region, the maximum utilization of resources, and the creation of considerable economic benefits.
-
Three major oil and gas central enterprises "dual-carbon" target timetable roadmap drafted
Time of Update: 2021-09-27
Hao Zhenshan analyzed that to achieve the goal of carbon neutrality by 2060, the proportion of non-fossil energy on the energy supply side needs to be greatly increased, and the electrification rate on the energy demand side cannot be lower than 80%; and refined oil consumption may reach its peak in 2025 With a gradual decline, natural gas has become an important "transition energy" for renewable energy.
-
The first pigging operation of the DN300 gas gathering trunk line of Fuling Gas Field was completed
Time of Update: 2021-09-27
China Petrochemical News Network reported on March 25, Jianghan Oilfield Fuling Shale Gas Company organized relevant units and technical personnel, after 7 hours of continuous fighting, successfully completed the first pigging operation of the gas field DN300 gas gathering trunk line, and a total of 36 cubic meters of pipeline effusion was removed.
-
Qingdao Petrochemical held the 11th Party Member Congress
Time of Update: 2021-09-27
Sinopec News Network News On March 29, the Qingdao Petrochemical Company Party Committee held the 11th Party Member Congress. The group company’s party group sent a congratulatory message. The meet
-
Maoming Petrochemical: Everyone "find the fault" to identify risks
Time of Update: 2021-09-27
Recently, the Maoming Petrochemical Port Division's offshore operation team strengthened equipment safety management in accordance with the company's "100-day safety and accident-free" special action
-
Fortune refinery alkylation project enters the start-up sprint stage
Time of Update: 2021-09-27
After the completion of the project, the participating employees and the relevant workshop personnel of Fujian United Petrochemical will cooperate closely to complete the project construction work such as pipeline pressure test, equipment commissioning, three inspections and four determinations on schedule, in order to successfully realize the 300,000 tons/year alkylation project One-time start-up feeding target provides a strong guarantee.
-
Actively build a new pattern of value-based auditing
Time of Update: 2021-09-27
Author: Xiao Lin Author unit: Hunan Petroleum Company Internal audit is an important part of the corporate governance system. To fully play the important role of "improving governance and adding val
-
Prescribe prescriptions for pulse diagnosis for shale oil and gas
Time of Update: 2021-09-27
Original title: Prescription for shale oil and gas pulse diagnosis ——State Key Laboratory of Shale Oil and Gas Enrichment Mechanism and Effective Development Our reporter Cheng Lipei Correspondent Wa
-
The photovoltaic industry ushered in a new era of vigorous development
Time of Update: 2021-09-27
In 2020, under the huge impact of the global new crown pneumonia epidemic, the world's energy demand has seen an unprecedented drop, but the photovoltaic industry still maintains a rapid growth trend.
-
Jinan Refining & Chemical Corporation first online calibration of orifice flowmeter
Time of Update: 2021-09-26
In the past, Jinan Refinery and Chemical could only take the method of removing the orifice plate and the differential pressure transmitter and sending it to the laboratory for separate verification when testing the orifice plate flowmeter.
-
Make good use of the "key trick" to deepen reform
Time of Update: 2021-09-26
Petrochemical Oil Services adheres to the development strategy of specialization, marketization, internationalization, high-end, and characteristic, firmly implements efficiency-oriented reforms, actively and steadily promotes the adjustment and optimization of internal structure, seals the bleeding points of efficiency, and fully stimulates the creation of efficiency Ability, vitality and motivation, the company's ability to create profits has been increasing year after year.
-
Jinling Petrochemical: The first quarter material demand plan compliance rate gets full marks
Time of Update: 2021-09-26
Since the beginning of this year, the center has advanced benchmarking in accordance with the performance management requirements of the group company, and has promoted the demand planning management level to a new level by implementing measures such as responsibility decomposition, supervision and inspection, and notification and assessment.
-
Qilu Petrochemical's caustic soda raw material achieves a new breakthrough for the first time
Time of Update: 2021-09-26
The caustic soda raw material achieved a new breakthrough for the first time, and the refined salt with better quality will gradually Replaced part of the sea salt, further expanded the procurement channels, and provided the possibility to reduce procurement costs.
-
Guangzhou Petrochemical: The annual cost of the micro-oxygen meter transformation is 300,000 yuan
Time of Update: 2021-09-26
At the same time, 3 sets of trace oxygen meters were modified according to operating requirements, multi-stage decompression was added, and the pipeline direction was changed to reduce the impact of gas sample pressure on the oxygen permeable membrane of the measuring cell and prolong the life of the measuring cell.
-
Two high-speed LNG refueling stations of Hubei executive company put into operation
Time of Update: 2021-09-26
Within 4 months, the company has successively invested in 4 LNG refueling stations, connecting the refueling lines from southwestern Hubei to east Hubei, and northwest Hubei to east Hubei, opening up a new situation for Hubei expressway to "gas from east to west".
-
The basic design of Hubei Fertilizer's 50,000 tons/year polyglycolic acid project started
Time of Update: 2021-09-26
Sinopec News Network News On March 25, the Hubei Fertilizer 50,000 tons/year polyglycolic acid new material project basic design opening was held, focusing on the basic design and schedule of the project construction, further optimizing the process package, and connecting with the "three simultaneous" Some basic data in safety pre-assessment and environmental impact assessment.
-
Jinan Refinery does a good job in the outbound work of waste materials during the maintenance period
Time of Update: 2021-09-26
Jinan Refining & Chemical has adopted the method of handling waste materials without landing, dismantling and lifting and pulling away, providing a good overhaul construction environment for the company's equipment maintenance work.
In the past, Jinan Refinery used the method of dismantling and storing waste materials before bidding.
-
Maoming Petrochemical's "Three In-depths" to Realize Party History Study and Education
Time of Update: 2021-09-26
Sinopec News Network News Since Maoming Petrochemical launched the party history study and education, it has celebrated the 100th anniversary of the founding of the party, integrated the actual work of the enterprise, enriched the learning, education and practice methods, and achieved the fourth leap through the "three in-depth", solid learning and education Consensus on the development of the company’s development and promote the steady development of the company’s work.
-
Shanghai Petrochemical Effectively Disposes of Wastewater from Overhaul
Time of Update: 2021-09-26
Recently, the Shanghai Petrochemical Ministry of Environmental Protection and Water Affairs has implemented a plan for receiving and disposing of sewage during the major renovation period to ensure the stable operation of the company's production equipment and avoid potential environmental pollution hazards.
-
"Take the market as a life project"
Time of Update: 2021-09-26
Domestic and foreign oil companies have drastically reduced investment in oil and gas field exploration and development, resulting in a sharp drop in the workload of the petroleum engineering market and service prices.