-
Shengli Linpan crude oil metering and loading truck put into operation
Time of Update: 2021-10-14
Sinopec News Network reported on March 14, with the start of the trial operation of crude oil metering and loading at Shanghe Union Station, the export of crude oil from the Linpan Oil Production Plant, a key construction project of Shengli Oilfield, was fully launched.
-
Saudi Arabia conducts military exercises in the Persian Gulf to improve its response to attacks on oil facilities
Time of Update: 2021-10-14
Recently, oil facilities in Saudi Arabia have been threatened by drones and missiles .
On March 7, local time, the Ras Tanura oil port in Dhahran, eastern Saudi Arabia, was attacked by drones.
-
Jinling Petrochemical: timely maintenance of No. 2 atmospheric and vacuum maintenance is safe and smooth
Time of Update: 2021-10-14
They have established a master control table of overhaul materials, sort out the progress of material manufacturing such as maintenance, technical improvement measures, and equipment updates every day, and find negative deviations, promptly urge suppliers to optimize production plans, control manufacturing progress, and ensure timely delivery.
-
Nanjing Engineering Gulei project sprints the goal
Time of Update: 2021-10-14
On March 15th, the Nanjing Engineering Gulei project launched the "60 days to win the 6·30" labor competition, requiring all participating units to strengthen organizational leadership and resource coordination on the basis of ensuring safety and quality, and quickly form an active competition.
-
Yangzi Petrochemical Storage and Transportation Plant Cauliflower Huangli Grabbing "Gold"
Time of Update: 2021-10-14
Yangzi Petrochemical Storage and Transportation Plant seized the good spring and implemented the construction “golden period” operation method as scheduled on March 15th.
-
Ten Construction Zhejiang High-pressure Polyethylene Project Efficiently Advance
Time of Update: 2021-10-14
After the hard work of the participating employees, the main body of the underground pipe network of the high-pressure polyethylene device has been completed, and the civil construction has entered At the end, the ground hardening rate of the device has reached more than 90%, creating favorable conditions for the professional construction of steel structures, equipment, and process pipelines.
-
Anqing Petrochemical Storage and Transportation Department takes multiple measures to ensure safe production in the rainy season
Time of Update: 2021-10-14
In response to the adverse effects of continuous rainy weather on production safety, the storage and transportation department actively formulated effective measures around the company's concept of s
-
Achieve the carbon peak and carbon neutral goal, the coal industry faces challenges and changes
Time of Update: 2021-10-14
" Zhou Bin told the Securities Daily reporter that my country's energy industry needs to pay attention to the clean, efficient and intensive use of traditional energy sources such as coal to achieve the "30, 60 goals".
-
Changling Refining Petroleum Transshipment and Landing Increased by More than 140%
Time of Update: 2021-10-14
According to the actual situation of major overhaul and oil supply in the market, the company’s management personnel timely reported and contacted the headquarter sales department and related regional companies, analyzed market demand data, discussed the technical plan for increasing the transfer of refined oil into Hunan, and surveyed the Yangtze River oil products.
-
The Third Northwest Oil Production Plant: "One Pipe, Two Uses" Improves Efficiency Three Times
Time of Update: 2021-10-14
Based on the existing problems in the area, the first area of oil production management seeks development through innovation, and timely measures are taken to build a "one-pipe dual-use" water injection pressurization process at the 10-6 meter transfer station.
-
Jianghan Oil Production Plant: "Three-wheel drive" helps the old oil area glow with "new vitality"
Time of Update: 2021-10-14
In recent years, the underground energy in old oil areas has been seriously insufficient, and the early water injection effect in most blocks is obvious, but the water cut rises rapidly after the oil wells break water, and the output declines greatly.
-
New breakthrough in Shunbei block
Time of Update: 2021-10-14
"Sinopec Northwest Oilfield key exploratory well Shunbei 42X well recently received 1,000 tons of industrial oil and gas flow. " On March 14th, China Central Television News Channel reported that the
-
Maoming Petrochemical's liquid ammonia output hits a new high
Time of Update: 2021-10-14
Since Maoming Petrochemical’s coarse-grained slurry-bed device was put into use at the end of December last year, the company has mainly refined acidic inferior crude oil to increase efficiency, with large acid gas processing capacity and high ammonia content.
-
Southwest Drilling Company builds a new engine for speed and efficiency
Time of Update: 2021-10-14
From March 3 to 10, the Dawan 4051-5H, Ning 209H32-5, Puguang 203-2T, Dingye 7 and Jinshan 101 wells were drilled by the Southwest Drilling Company on March 3-10. The drilling of key wells has been
-
Guangzhou Petrochemical cracking furnace renovation project is progressing smoothly
Time of Update: 2021-10-14
In the process of preparing the special construction technical plan, the project department of the Fourth Construction Third Engineering Company has repeatedly studied and optimized the hoisting plan, carried out on-site surveys and surveys on the construction site, carefully investigated various hidden dangers, and implemented various safety grid management measures.
-
Northwest Oilfield strengthens safety management and control of power lines in spring
Time of Update: 2021-10-14
At the beginning of March every year, when the cotton field is irrigated, Di Duoqing, the leader of the power supply operation district, leads everyone to promote the protection of power lines to prevent the cotton field from hitting poles and pulling wires during spring plowing and spring irrigation, and the plastic film floating in the dusty weather.
-
Zhongyuan Oilfield accelerates the pace of gas storage group construction
Time of Update: 2021-10-14
In order to ensure the completion of a century-old gas storage, the construction team centered on the wellbore and squeezed the plugging agent into the development layer within a radius of two meters to seal the pores.
-
Investment in countries along the Belt and Road continued to grow in the first two months
Time of Update: 2021-10-14
8% Original source: "People's Daily" (March 21, 2021 01 edition) Beijing, March 20 (Reporter Wang Ke) The reporter learned from the Ministry of Commerce: From January to February, my country's investment in the countries along the "Belt and Road" continued to increase, and the contracted projects progressed steadily.
-
Improve the energy "dual control" system
Time of Update: 2021-10-14
The most important thing is to control the consumption of fossil energy.
We must focus on controlling the total amount of fossil energy consumption, implementing renewable energy substitution actions, and building a new power system with new energy as the mainstay.
-
The new bucket wheel transformation project of Chuanwei Chemical Company's coal yard started
Time of Update: 2021-10-14
The implementation of this project will greatly improve the coal blending efficiency of the boiler and reduce the cost at the same time.
At the same time, the coal supply efficiency of the boiler can be improved, and the delayed detention cost of train coal unloading can be greatly reduced.