-
Henan Oil Construction Company revitalizes idle equipment to increase profits and create benefits
Time of Update: 2021-10-16
Through special measures such as revitalizing equipment, centralized leasing, and equipment upgrading and transformation, the company will generate a total of 923,600 profits in 2020, and achieve a profit of about 400,000 in the first quarter of this year, effectively saving operating costs.
-
Changling Refining and Chemical Industry Sector Increases Professional Skills Training for Teams
Time of Update: 2021-10-16
" Recently, Gao Fei, deputy head of the equipment group of the Changling Refining and Chemical Department, received a message from his lover.
-
Jianghan Oilfield strictly controls process safety to escort new wells containing sulfur
Time of Update: 2021-10-16
China Petrochemical News Network reported on March 12, at the Xinjingdai 14-slope-16C well site, workers Yang Yi and Xia Chu at Daihe Station, Tankou Management Zone, Jianghan Oilfield, Jianghan Oilf
-
The core equipment of the Gulei Refining and Chemical EVA plant started to install
Time of Update: 2021-10-16
Sinopec News Network reported on March 18 that the core equipment of the 300,000-ton/year EVA plant of Shijian Gulei Refining & Chemical Corporation-the unpacking work of the extrusion pelletizer was successfully completed, and the installation and construction phase began.
-
Jianghan Clothing Service Center "smart" tapping potential, "full bow and vigorous hair" to promote production
Time of Update: 2021-10-16
When the grassroots unit encounters technical problems such as poor use of downhole tools in workover operations, and inability to catch fire during oil pipeline cutting, on-site construction personnel only need to take a few pictures and upload them to the production technology department of the management department and the production technicians of the agency.
-
Zhongyuan Petroleum Engineering: A 20-minute video
Time of Update: 2021-10-15
Only through strict implementation of the'Monday' safety activities and other systems, In order to better promote the safety requirements of the team members into their ears, brains, hearts, and practice them", on March 13, the Southwest Project Department of Zhongyuan Logging Company held a regular production meeting in Luojiang Town, Dazhou, Sichuan, ZY212 comprehensive team leader Yang Jiankuan The report said.
-
Multiple departments increase financial support for wind power and photovoltaic power generation
Time of Update: 2021-10-15
In accordance with the principle of controllable risks, on the basis of independent negotiation between the bank and the enterprise, according to the actual and expected cash flow of the project, arrangements for loan extension, renewal or adjustment of the repayment schedule and time limit shall be made.
-
"Three Focuses" of Shengli Petroleum Engineering continue to boost fracturing speed and efficiency
Time of Update: 2021-10-15
In view of the fact that the platform plans to implement 5 wells fracturing and the high-pressure pipe fittings have been used for a long time, in order to avoid the risk of hidden dangers caused by the long-term erosion of the pipe fittings, the engineering department communicated with the inspection unit in advance to carry out high-pressure pipe fittings detection on-site in real time to ensure safe and efficient operation of the construction Escort.
-
6 hydrogen fuel cell companies settled in Chongqing
Time of Update: 2021-10-15
According to the project agreement, 6 companies will invest 4 billion yuan (RMB, the same below) in Chongqing Jiulongpo District to build 8 key core components of hydrogen fuel cells (proton exchange membranes, catalysts, membrane electrodes, bipolar plates, carbon paper) , Stack, air compressor, hydrogen circulation system) and fuel cell system integration technology industrial park.
-
Gansu New Energy's power output continues to hit new highs
Time of Update: 2021-10-15
04 million kilowatts, a record high; at 12:58 on February 25, Gansu New Energy’s power generation reached 13.
09 million kilowatts, another record high, accounting for the total power output at that time.
-
No. 3 Northwest Oil Production Plant: Deeply plowing oil reservoirs to plant "benefit flowers"
Time of Update: 2021-10-15
After the breakthrough of the TP259HCX well, the third oil production plant successively detected 10 potential gas wells in the Cretaceous, and is expected to increase natural gas by more than 200,000 cubic meters per day.
-
Shengli Oilfield Logging Interpretation Quality Management and Control Information Construction kicked off
Time of Update: 2021-10-15
Sinopec News Network News On March 15, the Shengli Oilfield Oil and Gas Development Management Center organized relevant units to come to the Drilling and Logging Center of Shengli Petroleum Engineering Technology Research Institute to listen to the progress report of the logging interpretation quality control information construction, and take this as an opportunity.
-
Hubei carbon market transaction volume exceeds 8.3 billion yuan in 2020
Time of Update: 2021-10-15
3 billion yuan, accounting for "half of the country" Original Source: China News Network China News Service, Wuhan, March 18 (Liang Ting and Zhang Xi) In 2020, the Hubei carbon market has accumulated 356 million tons of quota transactions, accounting for 50.
-
Zhongyuan Petroleum Engineering Technology Research Institute effectively promotes the construction of gas storage capacity
Time of Update: 2021-10-15
The maximum outer diameter part of the completion tool packer in the technical specifications of the Sinopec News Network Xunwei 11 gas storage project needs to be modified. . . " March 12, at the me
-
Northwest Oilfield: Solve on-site problems and lay a solid foundation for safety
Time of Update: 2021-10-15
In order to put an end to the formalism of the "Hundred-Day Safety" activity, the Power Engineering Management Department of the Center has organized the "Five Ones" as the theme of "Anti-Three Violations, Investigating Hidden Dangers, and Implementing Main Responsibilities for Safe Production".
-
Jianghan Qinghe: Rolling exploration well face 22-inclination 18 well has been successful
Time of Update: 2021-10-14
After careful exploration, the old well face 22-5-inclination 5 well was used to fill holes in the northeastern part of the area to evaluate the productivity of the 6 sand group of the fourth member of Shahejie Formation and realize the expansion of the oil-bearing boundary; deploy the new well face 22-inclination 18 well in the northwest Evaluate the distribution and production capacity of the reservoir.
-
Artificial intelligence opens the "safety umbrella" for the well team
Time of Update: 2021-10-14
The DREAM90-PGZZ second deck automatic pipe arrangement device introduced by the company for the first time is a complete set of automatic and intelligent pipe string automatic processing and operating system devices.
-
Yangzi Petrochemical Storage and Transportation Plant Cauliflower Huangli Grabbing "Gold"
Time of Update: 2021-10-14
Yangzi Petrochemical Storage and Transportation Plant seized the good spring and implemented the construction “golden period” operation method as scheduled on March 15th.
-
Nanjing Engineering Gulei project sprints the goal
Time of Update: 2021-10-14
On March 15th, the Nanjing Engineering Gulei project launched the "60 days to win the 6·30" labor competition, requiring all participating units to strengthen organizational leadership and resource coordination on the basis of ensuring safety and quality, and quickly form an active competition.
-
Sino-Korea Petrochemical successfully completed the evaluation of the headquarters heating furnace
Time of Update: 2021-10-14
In order to welcome the inspection, the equipment technical support center carried out on-site investigations and inspected the on-site condition of 27 heating furnaces in the four operation departments of the refining area.