-
ExxonMobil Yue Chunyang: Refined transformation helps energy saving and emission reduction
Time of Update: 2021-09-25
: Refined transformation helps energy saving and emission reduction Reporter Zhu Lin Yue Chunyang, managing director of ExxonMobil (China) Investment Co.
"ExxonMobil has already explored the industrial Internet field with many industrial equipment manufacturers and customers, and will further deepen cooperation in the future, promote industrial development, and help build a digital China.
-
Nanhua Company takes multiple measures to improve the quality of products and services
Time of Update: 2021-09-25
28), from 3 From mid-April to early April, Nanhua Company carried out Quality Day activities, and took various measures to improve product quality and service quality, so as to protect customers and win the market with high-quality products and services.
-
CNOOC's natural gas supply during the heating season hit a record high
Time of Update: 2021-09-25
On March 19, China National Offshore Oil Corporation (hereinafter referred to as "CNOOC") announced that during the heating season last winter and spring, CNOOC supplied more than 24 billion cubic meters of natural gas to the country, an increase of nearly 25% year-on-year.
-
Shunbei 11 side drilling sets two new records for domestic onshore drilling
Time of Update: 2021-09-25
65 mm borehole directional construction bottom hole temperature is as high as 160 ℃, and the annulus gap is small, the construction displacement is difficult, the small-size drilling tool has low tensile and torsional strength, and the gap between the wellbore and the drilling tool is small.
-
Changling Refining & Chemical Co., Ltd. Improves Talent Cultivation Mechanism
Time of Update: 2021-09-25
In the management sequence, establish different types of talent pools; based on the human resource system data, combined with research, they increase the analysis of the key elements of the employee's age, education, professional, and rank human resources, and guide the introduction of talents and the overall deployment of human resources, etc.
-
The downhole process measures of Henan Oilfield No. 1 Oil Production Plant have achieved significant results in increasing production and reducing costs
Time of Update: 2021-09-25
News from Sinopec News Network "Last week, the downhole process room completed the design of 21 wells, including 16 wells for oil well measures and 5 wells for the maintenance plan. Tracking and coo
-
Jiangsu Petroleum deploys Sinopec Quality Day activities
Time of Update: 2021-09-25
Strengthen gas station liquid level meter system invoicing check and daily monitoring of station masters, do a good job in the quality supervision and random inspection of oil products and natural gas at oil depots and gas stations, and carry out inspections on the implementation of quality control measures at oil depots and gas stations.
-
The commissioning of the second phase of Zhejiang Petrochemical Project is fully carried out
Time of Update: 2021-09-25
The electrical instrument team will carry out a single-machine trial operation of more than 1,000 motors in the light hydrocarbon project, facing difficulties such as tight time, narrow construction site, tight work surface, and tight process connection.
-
Shengli Microbial Technology Controls Low-yield and Low-efficiency Wells
Time of Update: 2021-09-25
, The daily oil production is only about 1 ton, but the water content is as high as 80%.
The experiment started in June 2020, and the data showed that the stimulation effect of 3 wells including SDS8X17 well was extremely obvious, and the daily oil increase of single well was above 200%.
-
Southwest Drilling No. 1 Aiming at Speeding Up and Exploiting Potential Model
Time of Update: 2021-09-25
Sinopec News Network reported on March 19, along the narrow rural road with rape blossoms on both sides that leads to Luojiang Shifang 31-4 Well, from time to time, transport vehicles filled with dri
-
Zhongyuan Oilfield launches equipment inspection in 2021
Time of Update: 2021-09-25
They conduct self-inspection and rectification in strict accordance with national regulations and standards, group companies and oilfield equipment management systems, and inspection standards, highlight risk management and professional management, comprehensively investigate the operating status of equipment, pipelines, safety accessories, electrical meters, etc.
-
Southwest logging: drilling and transporting two-dimensional nuclear magnetic logging set a record in the western Sichuan work area
Time of Update: 2021-09-25
Recently, the XN306 team of the logging branch of Southwest Petroleum Engineering Company successfully completed the drilling and transportation two-dimensional nuclear magnetic logging construction task of Pengzhou 5-4D well, creating the longest section of the drilling and transportation two-dimensional nuclear magnetic logging in the west Sichuan work area and downhole The deepest record.
-
Gulei Refining and Chemical Styrene Plant Pipeline Pressure Test Accelerates
Time of Update: 2021-09-25
In the past few days, the Sinopec News Network has accelerated the pressure test of process pipelines at the 600,000-ton/year styrene plant of the ten-built Gulei refining and chemical industry, and improved various construction tail items to lay a good foundation for the commissioning and commissioning of the plant.
-
Jianghan Oil Region's production and construction well Guang 43 oblique -2 well encountered a 15-meter thick oil layer
Time of Update: 2021-09-25
Sinopec News Network reported on March 22 that the first production well Guang 43 Incline-2 well deployed by the Geological Research Institute of Jianghan Oil Production Plant of Jianghan Oilfield in the old area of Guangbei was successfully completed.
-
No. 1 Oil Production Plant in North China: Not lying well is the greatest benefit
Time of Update: 2021-09-25
Since the beginning of the year, the management area has realized the long life of oil wells as a key point of breakthrough, and established the concept of "not lying well is the greatest benefit", deepening the analysis of lying well problems, looking for shortcomings in lifting problems, optimizing corresponding treatment measures, and prolonging oil and water well production Cycle, the number of wells lying down and the number of maintenance wells are effectively reduced.
-
Zhongyuan Oilfield: Well Wei 22-100 has good comprehensive measures
Time of Update: 2021-09-25
Recently, the geological technicians of Wenwei Oil Production Plant of Zhongyuan Oilfield implemented comprehensive measures to control Well Wei 22-100.
0 tons, and after the comprehensive measures took effect, the daily oil production increased by 3.
-
The mud logging work of the new well of Zhongyuan Wei 11 gas storage is fully launched
Time of Update: 2021-09-25
Sinopec News Network News On March 18, with the sound of the whistle, the Zhongyuan Mudging Company’s ZY216d team undertook the comprehensive logging task of the Zhongyuan Oilfield Wei 11 Storage 3 Well, which officially kicked off the construction of the Zhongyuan Wei 11 gas storage project.
-
Jianghan Perforation Sets the Longest Construction Record in the Perforation Section of Northwest Oilfield
Time of Update: 2021-09-25
The high-quality completion of TKC1-1H transmission perforation construction has further enhanced the brand image of "Jianghan Perforation" and laid the foundation for the perforation task of horizontal wells in long well sections in the future.
-
Jiangsu Oilfield: Rolling exploration well side Yong 7 Ping 8 well achieves high production
Time of Update: 2021-09-24
In the next step, the project team will continue to focus on the oil-rich zones, based on the division of rolling units, and through the recognition of the regularity of the zones, strive to discover more high-quality available reserves, and provide a strong guarantee for the "increasing reserves and production" of Jiangsu Oilfield.
-
Shengli Oilfield Gudong 7 District Middle and Northeast "Phnom Penh" Rebuilds High Yield
Time of Update: 2021-09-24
Geologists use reservoir engineering methods to reverse the oil-water boundary and invert the northeast marginal reservoirs through multiple wells and earthquakes.
5 tons, and 3 oil-bearing layers were drilled.